Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹22.0 LAccepted-AOC | L1 | Accepted-AOC 1st Lowest | |
| 2 | L2₹21.5 L+₹5,354 (0.25%)Rejected-AOC | L2 | Rejected-AOC 2nd Lowest | |
| 3 | L3₹21.6 L+₹13,921 (0.65%)Rejected-AOC BELIATORE BANKURA DIST BANKURA PIN 722203 | BANKURA | BANKURA | WEST BENGAL | 722203 | L3 | Rejected-AOC 3rd Lowest |
Tender Value
₹21.4 L
EMD Value
₹42,834
Closing Date
29 Dec 2021, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer(AI) Bankura(Agri Irrigation) Di
WRDD Administrative Buildings 1 st Floor Pranabananda Sarani Kenduadihi Bankura
Re Excavation of 01 (One) No Water Detention Structure (WDS) scheme and Allied Structure at Guniyada Hapa I at mouza Guniyada JL No 1 Plot No 930 909 ( Lat 23 point145035 Long 86 point755235 ) GP Gopalpur Block Hirbundh in the District of B
2021_WRDD_352798_53
WBWRIDD EE(AI) BANKURA e NIT 06 PS/MS/Jal 2021 22
Open Tender
CIVIL WORKS
Percentage
60 days
mouza Guniyada JL No 1 Plot No 930 909 ( Lat 23 p
Please refer Tender Documents
3 documents required · 3 mandatory
₹42,834
Yes
Office of the Executive Engineer(AI) Bankura(Agri
11 Feb 2022
30 Nov 2021
1 Jan 2022
1 Dec 2021
29 Dec 2021
1 Dec 2021
22 Dec 2021
180 days
eProcurement System of Government of West Bengal Created By: DHANANJOY MANDAL Created Date/Time: 24-Jan-2022 07:10 PM Tender Title: Re Excavation of 01 (One) No Water Detention Structure (WDS) scheme and Allied Structure at Guniyada Hapa I at mouza Guniyada JL No 1 Plot No 930 909 ( Lat 23 point145035 Long 86 point755235 ) GP Gopalpur Block Hirbundh in the District of B Tender ID: 2021_WRDD_352798_53
Tender Inviting Authority: Executive Engineer (A-I), Bankura (A-I) Division.
Name of Work: Re Excavation of 01 (One) No Water Detention Structure (WDS) scheme and Allied Structure at Guniyada Hapa I at mouza Guniyada JL No 1 Plot No 930 909 GP Gopalpur Block Hirbundh in the District of Bankura under Bankura (AI) Division under Matir Shristi Programme
Contract No: WBWRIDD/ EE(A-I) /BANKURA/ e NIT 06/ PARAY SAMADHAN/ JALATIRTHA/MATIR SHRISTI/ 2021-22 (Sl No- 53)
SCHEDULE OF WORK / ITEM(S)
Sl.No Bidder Name Estimated Rate Quoted Percentage Quoted Rate in Figures and Words
1.00 KRISHNA UN EMPLOYED ENGINEERS CO OPERATIVE SOCIETY LTD(GSTN-19AAAAK3743M1ZC) 2141684.032 3.000 2205934.553 Twenty Two Lakh Five Thousand Nine Hundred and Thirty Four
2.00 SAMIRAN MANDAL(GSTN-19AMQPM7064C1ZP) 2141684.032 2.510 2195440.301 Twenty One Lakh Ninty Five Thousand Four Hundred and Fourty
3.00 MEGHNATH GHOSH(GSTN-19AHOPG1205G1ZL) 2141684.032 4.000 2227351.393 Twenty Two Lakh Twenty Seven Thousand Three Hundred and Fifty One
Lowest Amount Quoted BY: SAMIRAN MANDAL(2195440.301)
BOQ Summary Details Tender Title: Re Excavation of 01 (One) No Water Detention Structure (WDS) scheme and Allied Structure at Guniyada Hapa I at mouza Guniyada JL No 1 Plot No 930 909 ( Lat 23 point145035 Long 86 point755235 ) GP Gopalpur Block Hirbundh in the District of B Tender ID: 2021_WRDD_352798_53
Sheet Name Sl.No Bidder Name Amount Bid Rank
BoQ1 1 SAMIRAN MANDAL 2195440.301 L1
2 KRISHNA UN EMPLOYED ENGINEERS CO OPERATIVE SOCIETY LTD 2205934.553 L2
3 MEGHNATH GHOSH 2227351.393 L3
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .