Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.6 LAccepted-AOC | L1 | Accepted-AOC Being L1 and found in order | |
| 2 | L2₹15.7 L+₹14,212.80 (0.91%)Rejected-AOC | L2 | Rejected-AOC Not being L1 | |
| 3 | L3₹17.4 L+₹1.8 L (11.8%)Rejected-AOC | L3 | Rejected-AOC Not being L1 |
Tender Value
₹16 L
Closing Date
14 Feb 2022, 6:00 pmClosed
HQ 135 WE
HQ 135 WE C o 56 APO
SPECIAL REPAIR OF ROAD AT FASF UNDER GE SOUTH AKHNOOR
2022_MES_502049_1
CWE/JA-37/2021-22
Open Tender
Civil Works
Item Rate
180 days
Akhnoor
As per NIT
8 documents required · 8 mandatory
₹500
Yes
GE South
Exempted
1 Apr 2022
17 Jan 2022
16 Feb 2022
17 Jan 2022
14 Feb 2022
31 Jan 2022
17 Jan 2022 - 24 Jan 2022
Amount
Scarifying or of picking gravelled macadam or bituminous macadum surface in area exc 400 sqm , n.exc 50 mm deep, complete all as specified and directed.
M&L for 75mm thick (compacted thickness) WBM with coarse aggregate of grading 2 (63 to 40 mm size) aggregte lime stone, sand stone, flint or quartzite, spread, watered and rolled and consolidated to required gradient and camber with 8 to 12 tonne power roller, complete all as specified and directed.
All as per srl item No 2 here in above but except coarse aggregate (Material obtained from item No 01 shall be used).
M&L for preparing unsurfaced water bound macadam by brushing with wire brushes for removing caked mud etc. sweeping with a brooms and finally fanning the cleaned surface with gunny bags to removal all loose dirt etc, complete all as specified and directed.
M&L for Applying evenly a priming/tack coat with bituminous primer at 10 kg per 10 sq metre using paving Bitumen of grade VG-10, complete all as specified and directed.
Repair to pot holes, any depth, not exc. 1 SqM each including sweeping free from dust and mud or water, scouring sunken surfaces in roads, path etc. cutting around edges to at least 25 mm in depth, making good by applying tack coat at 5 kg per 10 sq m, putting in premixed bituminous macadam, well rammed and sealed with binder 9.8 kg per 10 sq m, blended with 0.09 cu m of stone chippings, 6.3 mm size and again well rammed (including supply or premixed macadam, binder and chippings), depth of potholes exc 30mm complete all as specified and directed.
M&L for preparing black top surface by brushing with wire brushes for removing cake mud etc sweeping with broom and finally the cleaned suface with gunny bag to remove all loose dirt etc, complete all as specified and directed.
M&L for Applying evenly a priming/tack coat with bituminous primer at 05 kg per 10 sq metre using paving Bitumen of grade VG-10, complete all as specified and directed.
M&L for bituminous premix asphaltic semi dense concrete 30 mm consolidated thickness with paving bitumen of grade VG-30, 5.5 % binder content by weight of total mix, rolled and compacted with 8 to 12 tonne power roller to required camber and gradient, complete all as specified and directed.
Premix bituminous macadam with paving bitumen (Grade VG-30) @4% by weight of total Mix, laid/rolled and compacted to required gradient and camber (consolidated thickness 75mm or less), complete, all as specified and directed by Engineer-in-Charge.
Supply only Paving Bitumen grade VG-30. ( For Price adjustment in Job Mix Formula) Rate is Rs 35.51 is for per Kg.
M/S KARAN SINGH CONTRACTOR
ASIA ENTERPRISES
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .