| Sl No | Description | Qty | Unit | A.K.B RAJA ENTERPRISES | SRI VINAYAKA ENTERPRISES |
|---|---|---|---|---|---|
| 1.00 | Charges for Checking the water leakage, removal of fly ash and coal powder deposited over the pipe in 600 mm dia of bearing cooling supply & return line of Unit - I, II & III and TWAD board water supply line in GLR I, II & III (Approx. 2600 Mtrs) and 200 mm dia pipe from GLR - I to OHT - I & II (Apprx.800 Mtrs) and 300 mm dia pipe from clarified water pump house to DM plant (Apprx. 800 Mtrs), 450 mm dia pipe apprx.80 Mtr, 500 mm dia pipe aprx. 300 mtrs & 150 mm dia pipe. Arresting the water leakage in above pipe lines at various height with safety equipments by providing leak arresting clamps to avoid the generation loss in and around the clock. | 300 | Opn | 24,19,500 ₹28.6 L | 25,20,000 ₹29.7 L |
| 2.00 | Charges for operating and maintenance work for assisting the shift engineer in all operation activities at ACWPH - I. Recording the parameters of ACW pumps in register at regular intervals. Checking the vibration & heat driven and non-drive end bearing areas and checking the suction & discharge pressure of running ACW pumps at regular intervals, checking the trough water level before and after of filtermesh cleaning and operating the storm water pump at the time of unexpected emergency or heavy rain. checking the flow of ACW water in spray nozzle at cooling tower. In case of ACW pumping failure operating the emergency cooling line valves near MPM-I area for safeguard the running compressors, pumps, ID fan, FD fan to avoid loss of generation and also watching the trough level in Unit - I, II & III if any below level noticed operating the makeup valve and maintaing the trough water level to required level. (For One shift) | 1,095 | Nos | 14,12,550 ₹16.7 L | 14,78,250 ₹17.4 L |
Tender Value
Refer Docs
EMD Value
₹26,900
Closing Date
25 Dec 2025, 2:00 pmClosed
CE/TTPS
O/o CE/TTPS
TTPS Operation Circle CAD ACWPH I Inspection, checking of supply and return pipe lines of bearing cooling water, arresting leakages and assisting the shift engineer in all activities at Auxiliary Cooling Water Pump House-I by recording the parameters
2025_EB_630852_1
CE/SE/O/TTPS/Spec.No.26/26-27
Open Tender
Miscellaneous Works
365 days
TTPS
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹26,900
Yes
23 Mar 2026
11 Dec 2025
26 Dec 2025
11 Dec 2025
25 Dec 2025
11 Dec 2025
Charges for Checking the water leakage, removal of fly ash and coal powder deposited over the pipe in 600 mm dia of bearing cooling supply & return line of Unit - I, II & III and TWAD board water supply line in GLR I, II & III (Approx. 2600 Mtrs) and 200 mm dia pipe from GLR - I to OHT - I & II (Apprx.800 Mtrs) and 300 mm dia pipe from clarified water pump house to DM plant (Apprx. 800 Mtrs), 450 mm dia pipe apprx.80 Mtr, 500 mm dia pipe aprx. 300 mtrs & 150 mm dia pipe. Arresting the water leakage in above pipe lines at various height with safety equipments by providing leak arresting clamps to avoid the generation loss in and around the clock.
Charges for operating and maintenance work for assisting the shift engineer in all operation activities at ACWPH - I. Recording the parameters of ACW pumps in register at regular intervals. Checking the vibration & heat driven and non-drive end bearing areas and checking the suction & discharge pressure of running ACW pumps at regular intervals, checking the trough water level before and after of filtermesh cleaning and operating the storm water pump at the time of unexpected emergency or heavy rain. checking the flow of ACW water in spray nozzle at cooling tower. In case of ACW pumping failure operating the emergency cooling line valves near MPM-I area for safeguard the running compressors, pumps, ID fan, FD fan to avoid loss of generation and also watching the trough level in Unit - I, II & III if any below level noticed operating the makeup valve and maintaing the trough water level to required level. (For One shift)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.62 MB
BOQ_754393.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid