Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹40.0 LAccepted-AOC CHUSHUL | LEH LADAKH | LADAKH | 194101 | L1 | Accepted-AOC Found lowest one bidder | |
| 2 | L2₹54.4 L+₹6.0 L (12.4%)Rejected-AOC | L2 | Rejected-AOC Quoted high rate as compared to L1 |
Tender Value
₹40 L
Closing Date
8 Nov 2021, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
Rural Engineering Wing Leh
Construction of seminar Hall and Library for Lalok Kunfan Thundel Tsogspa
2021_RDD_5078_1
NIT 98 UTLeh REW of 2021-22
Open Tender
Civil Works - Others
Item Rate
60 days
Leh
Please refer Tender documents.
6 documents required · 6 mandatory
₹1,000
Yes
Executive Engineer
Exempted
8 Dec 2021
30 Oct 2021
10 Nov 2021
30 Oct 2021
8 Nov 2021
30 Oct 2021
120 days
Amount
Earth work in excavation by manual means over areas (Exceeding 30 em and upto 1.5 mtr in depth, 1.5 mtr in width as well as 10 sqm. on plan) including disposal of excavated earth upto 1 mtr from cutting edge, disposed earth to be levelled and neatly dressed in : All kinds of Soil
Random Rubble masonry with hard stone from nallah in foundation and plinth including levelling up with cement concrete 1 :6:12 ( 1 Cement: 6 coarse sand : 12 graded stone aggregate 20mm nominal size) at plinth level with cement mortar 1:6 (1 Cement: 6 coarse sand)
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutmen"ts, posts ans sturts, etc. upto floor five level excluding cost of centring, shuttering, fmishing and reinforcement. 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded crushed stone aggregate 20mm nominal size)
Centring and shuttermg including strutting, propping etc. and removal of form for lumns, Pillars, Piers, Abutments, Pos ts and Struts
Centring and shuttermg including strutting, propping etc. and removal of form for Lintels, beams, plinth beams, girders, bressumers and centilevers.
Centring and shuttermg including strutting, propping etc. and removal of form for Suspended floors, roofs, landings, balco nies and access platform
Centring and shuttermg including strutting, propping etc. and removal of form for Edges of slabs and breaks in floors and walls Under 20cms wide
Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete. Thermo-Mechanically Treated bars.
Providing and fixing upto floor five level precast cement concrete solid blocks including hoisting and setting in position with cement mortar 1:3 (1 cement : 3 coarse sand), cost of required centring, shuttering and complete 1:3:6 (1 cement: 3 coarse sand: 6 graded stone aggregate 20mm nominal size) (A) Crushed
Providing wood work in frames of doors, windows, clerestory windows and other frames, wrought framed and fixed in position with hold fast lugs or with dash fasteners of required dia and length (hold fast lugs or with dash fasteners shall be paid for separately): Second class kail wood
carriage of stone average distance of 20kms by MT
carriage of Sand and bajree average distance of 20kms by MT
M/S KONCHOK TSULTIM GOVT CONTRACTOR
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .