Loading…
Loading…
Tender ID
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 5 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹1.5 L
EMD Value
₹4,500
Closing Date
2 Apr 2026, 6:00 pmClosed
OFFICE OF THE EXECUTIVE ENGINEER REW ANANTNAG
OFFICE OF THE EXECUTIVE ENGINEER REW ANANTNAG
C/O DRAIN FROM H/O BILAL AHMAD KHARADI TO GH NABI HAJI AT BILAL COLONY ANANTNAG
2026_RDPR_306762_1
ENIT247of2025-26
Open Tender
Civil Works
Percentage
30 days
ANANTNAG
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
OFFICE OF THE EXECUTIVE ENGINEER REW ANANTNAG
₹4,500
3 Apr 2026
25 Mar 2026
3 Apr 2026
25 Mar 2026
2 Apr 2026
25 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:All kinds of soil : | 13.01 | Cum | 479.3 | ₹6,235.69 |
| 2 | P/L of Nallah muck soling hand packed for foundation i/c carriage of 5 km. complete job | 2.68 | Cum | 1,174.06 | ₹3,146.48 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 with 20mm NS agg i/c carriage | 10.89 | Cum | 6,055.9 | ₹65,948.75 |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns | 34.85 | Sqm | 286.35 | ₹9,979.3 |
| 5 | Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. For Trashguard | 528 | Kg | 120.8 | ₹63,782.4 |
| 6 | ADD FOR COST OF SIGNBOARD AND PHOTOGRAPHS | - | Each | 0.8 | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.32 MB
BOQ_995813.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .