Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹43.5 LAccepted-AOC 22 2 BAKRAHAT ROAD THAKURPUKUR KOLKATA 700063 | KOLKATA | KOLKATA | WEST BENGAL | 700063 | L1 | Accepted-AOC BEING LOWEST AND RESONABLE | |
| 2 | L2₹45.5 L+₹1.5 L (3.41%)Rejected-Finance GC ROAD ABDUL LATIF ROAD PO TITAGARH KOLKATA 700119 | 24 PARAGANAS NORTH | WEST BENGAL | 700119 | L2 | Rejected-Finance NOT BEING LOWEST | |
| 3 | L3₹48.7 L+₹4.6 L (10.5%)Rejected-Finance 44B CIRCULAR GARDEN REACH ROAD KOLKATA 700 023 | KOLKATA | WEST BENGAL | 700023 | L3 | Rejected-Finance NOT BEING LOWEST | |
| 4 | L4₹52.8 L+₹8.7 L (19.8%)Rejected-Finance 10 1 GROUND FLOOR WEST GHOSH PARA JAGATDAL JAGATDAL JAGATDAL NORTH 24 PARGANAS WEST BENGAL 743125 | 24 PARAGANAS NORTH | WEST BENGAL | 743125 | L4 | Rejected-Finance NOT BEING LOWEST | |
| 5 | L5₹56.5 L+₹12.5 L (28.3%)Rejected-Finance | L5 | Rejected-Finance NOT BEING LOWEST |
Tender Value
Refer Docs
EMD Value
₹1.1 L
Closing Date
21 Apr 2021, 6:00 pmClosed
CWE Kolkata
Headquarters commander Works Engineers Military Engineer Services No 1, National Library Avenue Alipore, Kolkata 700 027
COMPREHENSIVE MAINTENANCE FOR CENTRAL AIR CONDITIONER AT MAIN HOSPITAL BLDG AND DEFI TECH ACCN AT CH EC U NDER GE ALIPORE KOLKATA
2021_MES_430229_1
8121/E8(E-62)/20-21
Open Tender
Electrical and Maintenance Works
Item Rate
334 days
KOLKATA-27
Please refer Tender documents.
4 documents required · 4 mandatory
₹1,000
Yes
GE A KOLKATA
₹1.1 L
Yes
8 May 2021
12 Mar 2021
22 Apr 2021
12 Mar 2021
21 Apr 2021
7 Apr 2021
12 Mar 2021 - 21 Apr 2021
Amount
NOTE :The bidders/contractors are advised to read tender document & all corrigendum/ amendments and General conditions of contracts before entry/quoting the rates. It is highlighted that the cretin condition of General Condition Of Contracts (IAFW-2249) has been modified as direction of MOD i.e inclusion of performance security, deletion of risk & cost provisions and increase in defects liability period all as specified in tender document.
Outsourcing services for day to day / routine/periodical comprehensive maintenance of Defi Tech Hospital Central AC plant of capacity 3x200 TR including supply of all consumable lubricants and repair or replacement( as per direction of GE) of all components (spare parts) except parts(item no 2.01 to 3.43) are specified in BOQ here in after maintenance of following components of entire system/equipments including daily maintenance of necessary records & documents complete all as specified and as directed. (A) Defi Tech AC Plant:-(i)Water cooled Screw chilling machines unit 3 x 200 TR alongwith compressor, evaporator, condensor including allied equipments and sub-assemblies (02 working + 01 standby), (ii) LT control panel with accessories Cont..
Cont... (iii) 3 x Condensor Water Pump (02 working + 01 standby), (iv) 3 x Hot Water Pumps (02 working + 01 standby) (v) 3 x Chiller Water Pump (02 working + 01 standby), (vi) 3 x Cooling tower (02 working + 01 standby) alongwith operating valves and pipe line , (vii) Cooling tower water tanks ,(viii) Chilled Water pipe line throughout Defi Tech Building (G+5) and Make up Water tanks at roof top (B) Defi Tech Building (G+5) :-(i) All Air Handlig Units including OTs, (ii) Air Duct opening grills, (iii) Fan Coil Units(iv) Air curtain unit NOTES :- 1. Maintenance of AC plant and entire system/equipmentsof capacity 3x 200 TR in summer, winter and monsoon season as per the period of contract including daily/periodical checks i.e quarterly maintenance requirement as per manufacturer's instructions. The above quoted rates covers daily upkeep of AC plant as described above all as specified and directed by the Engineer-in-Charge for smooth & efficient performance to achieve inside designed conditions throughout the season. 2. Cleaning of inside and out side of the installation and the cost thereof shall be deemed to be included in the unit rate quoted against this item. 3. Contractor shall rectify the fault within 8 hrs or as directed by Enng-in-Charge. 4. Contractor shall maintain temperature of AC plants as per direction of Enng-in-Charge or his rep within design limit as specified in PS. 5. During entire contract period any defective components or any other materials which is not specified in sch 'A' but repair/replace to make plant/ mechinery fully functional. The cost of the same is deemed included quoted rates and no extra cost shall be paid to the contractor in this effect. 6. The cost of transportation and other necessary equipment shall be arranged/brought by the contractor in this effect , hence the bidder/tenderer is advised to visit the site and assess the quantum of the work to be carried out in the contract and quoted there rate accordingly 7. Make and model of part to be replaced shall be same as existing at site or as per OEM. 8. Comprehensive /Periodic maintenance means ensuring optimal functioning of AC plant by the synchronizing levels at no extra cost. 9.The contractor shall provide of high skilled mechanic/Special engineer required for fault during currency of contract period if required. The cost of the same shall be deem to be included above quoted rate 10. All labour charges for taking out old spares/ items and replacing spares, testing, commissioning transportation etc shall be deemed to be included in the above quoted rates. In case any expert technician/engineer required for major faults of pant shall be provide by contractor without any extra cost of depertment. 11. Above central AC installation shall be run three shifts per day including on sundays / holidays as per labour act. contractor shall quote rate accordingly. 12. One Engineer shall be deputed at site on official working hour as directed by AGE 13. The cost of transportation and other necessary equipment shall be arranged/brought by the contractor in this effect , hence the bidder/tenderer is advised to visit the site and assess the quantum of the work to be carried out in the contract and quoted there rate accordingly
Supply only PCB Board with display ( For AHU )
Supply only Contractor 3TF47
Supply only Contractor 3TF51
Supply only DO (Drier Core)
Supply only GI duct 24WG , Tata /JINDAL
Supply only nitrile ruber 13mm
Supply only cyphon with bib cock guage
Supply only thermometer
Supply only AHU air filters .5 micron suitable for AHU
Supply only Solonoid Valve Kit CXH9
Supply only Pressuer Transducer 44.8 BAR
Supply only Pressuer Transducer 10. BAR
Supply only Electronic Expention valve E6U
Supply only Gas ket Kit for CXH5 Compresser
Supply only Gas ket Kit for CXH5 Condensor
Supply only Spiral target valve
Supply only Spiral Eliminator block (fill block)
Supply only Float Valve
Supply only Header PVC line 6'
Supply only Header branch PVC line 2'
Supply only MCX 31 Contactor 82.5A
Supply only MN 5 over load 30to 50 A
Supply Only Ball bearing for screw chiller compress for 200 TR
Supply Only Compressor Oil
Supply Only Compressor Oil Filter
Supply Only Refigeration Filter
supply Only Operating Sensors for Screw compressor 200 TR
Supply only nitrogen for leak testing
Supply only refrigerant 134A
Supply only PCB Display Board for Screw compressor 200 TR
Vernishing of starter coil for Screw compressor 200 TR
Supply only 20HP VFD for secondary pump
Supply only V-Belt with following size- A-69,A-56,A-56,A-50,A-42,A59,A-39,A-60,A-79 .
Re- winding of 7.5.00 HP capacity energy efficient level EFF1 motor with suitable type enamelled copper wire as per IS 13730
Re- winding of 10.00 HP capacity energy efficient level EFF1 motor with suitable type enamelled copper wire as per IS 13730
Re- winding of 12.50 HP capacity energy efficient level EFF1 motor with suitable type enamelled copper wire as per IS 13730
Re- winding of 20.00 HP capacity energy efficient level EFF1 motor with suitable type enamelled copper wire as per IS 13730
Re- winding of 25.00 HP capacity energy efficient level EFF1 motor with suitable type enamelled copper wire as per IS 13730
Material and labour for painting with one coat of red oxide primer and two coats of black japan paint including preparation old/ new surface of steel of any description all as specifierd and as directed.
Supply fixing in repair of VLT suitable for 200 TR AC Plant 15 KW/20 HPall as specifierd and as directed.
Repair and overhauling for Kirloskar compressor of capacity 110 TR central AC Plant including rewinding of stator coil, repairing leakage of compressor, descaling with cleaning compressor other accessory, filling fresh refrigerant gas and including disconnection existing pipe/electricity line, necessary inspection of OEM, reassembling , testing , re-commissioning, etc complete for smooth functioning of the equipments to ensure desired result including taking down/dismantling complete all as specified and as directed. Note: 1. Rates quoted deemed to be inclusive of all equipment such as crane & transported vehicle 2. Additional refrigerant shall be measure and paid under respective item.
Repair and overhauling for Kirloskar condenser of capacity 110 TR central AC Plant including, descaling, cleaning condenser pipe, other accessory and including disconnection existing pipe/electricity line, necessary inspection of OEM, reassembling , testing , re-commissioning, etc complete for smooth functioning of the equipments to ensure desired result including taking down/dismantling if required complete all as specified and as directed.
Repair and overhauling for chiller unit of capacity 220 TR central AC Plant including, descaling, cleaning condenser pipe, other accessory and including replacement of unserviceable/burnt out /worn out spare parts with new one as per existing make and disconnection existing pipe/electricity line, necessary inspection of OEM, reassembling , testing , re-commissioning, etc complete for smooth functioning of the equipments to ensure desired result including taking down/dismantling if required complete all as specified and as directed.
Outsourcing services for day to day / routine/periodical comprehensive maintenance including supply of all consumable lubricants and repair or replacement of all components (spare parts) except parts as specified in BOQ here in after and measured & paid separately under relevant items maintenance of following central AC plant installation and entire system/equipments including daily maintenance of necessary records & documents complete all as specified and as directed. (A) Basement Central AC Plant (i) Screw type Chiller unit 3 x 225 TR alongwith compressor, evaporator, condensor including allied equipments and sub-assemblies (02 working + 01 standby) (ii) LT control panel with accessories (iii) 3 x Condensor Water Pump (02 working + 01 standby) (iv) 3 x Chiller Water Pump (02 working + 01 standby) (v) 3 x Cooling tower (02 working + 01 standby) alongwith operating valves and pipe line (vi) Cooling tower water tanks 15000 ltrs x 06 Nos ,(vii) Chilled Water pipe line throughout CH (EC) Main Hospital Building (G+7) and TC(EC) building (G+1) and Make up Water tanks at roof top (B) CH (EC) Main Hospital Building (G+7) and TC(EC) building (G+1) (i) 9 x Air Handlig Units, (ii) Air Duct opening grills, (iii) 43 x Fan Coil Units
NOTES NO :- 1. Maintenance of AC plant and entire system/equipmentsof capacity 3x 225 TR in summer, winter and monsoon season as per the period of contract including daily/periodical checks i.e quarterly maintenance requirement as per manufacturer's instructions. The above quoted rates covers daily upkeep of AC plant as described above all as specified and directed by the Engineer-in-Charge for smooth & efficient performance to achieve inside designed conditions throughout the season. 2. Cleaning of inside and out side of the installation and the cost thereof shall be deemed to be included in the unit rate quoted against this item. 3. Contractor shall rectify the fault within 24 hrs. If the AC plant is off road/break down more than 24 hrs contractor will be charge as mention here-in-after. 4. Contractor shall maintain temperature of AC plants as per direction of AGE or his rep within design limit as specified in PS. 5. During entire contract period any defective components or any other materials which is not specified in sch 'A' but repair/replace to make plant/ mechinery fully functional. The cost of the same is deemed included quoted rates and no extra cost shall be paid to the contractor in this effect. 6. The cost of transportation and other necessary equipment shall be arranged/brought by the contractor in this effect , hence the bidder/tenderer is advised to visit the site and assess the quantum of the work to be carried out in the contract and quoted there rate accordingly 7. Make and model of part to be replaced shall be same as existing at site or as per OEM. 8. Comprehensive /Periodic maintenance means ensuring optimal functioning of AC plant by the synchronizing levels at no extra cost. 9.The contractor shall provide of high skilled mechanic/Special engineer required for fault during currency of contract period if required. The cost of the same shall be deem to be included above quoted rate 10. All labour charges for taking out old spares/ items and replacing spares, testing, commissioning transportation etc shall be deemed to be included in the above quoted rates. In case any expert technician/engineer required for major faults of pant shall be provide by contractor without any extra cost of depertment. 11. Above central AC installation shall be run three shifts per day including on sundays / holidays as per labour act. contractor shall quote rate accordingly. 12. The cost of transportation and other necessary equipment shall be arranged/brought by the contractor in this effect , hence the bidder/tenderer is advised to visit the site and assess the quantum of the work to be carried out in the contract and quoted there rate accordingly 13. In case above AC plant replaced through other agencycurrency of contracts period and if maintenance is required, to keep the AC Plant in running condition, the same shall be carried out through this contract after obtaining written approval from GE/Engg-in-Charge
Supply only following spares for chilled water pump set 40HP 03 Nos, Make Kirloskar, Model No : - UP 100/38 : -
Bearing Housing Driving End, make: Kirloskar
Bearing Housing Driven End,make: Kirloskar
Bearing No 6309, Make - TATA/ SKF/ NBC
Impeller
Shaft
Shaft sleeve
Oil seal
Set of 'O' Rings
Tyre coupling cover for Pump-Motor coupling
Pump motor coupling with MS key
Supply only following spares for Condenser pump set 30HP 03 Nos, Make : Kirloskar, Model No. UP 125/30A : -
Bearing Housing Drive
Bearing Housing Driven End
Bearing No 6306, Make - Tata/ SKF/ NBC
Impeller
Shaft
Shaft sleeve
Oil seal
Set of 'O' Rings
Tyre coupling cover for Pump-Motor coupling
Pump motor coupling with MS key
Supply only Refrigerent Gas R-22 in returnable container for chiller unit of 225 TR, Make :Mafron, Floron or equivalent model given in PS
Supply only following spares for Chiller unit 225 TR, Make : Trane
Solenoid valve coil oil line, Make - Trane / Parkar
Solenoid valve coil Loader/ Unloader line, Make - Trane / Parkar
Compressor oil filter
Refrigerant Filter
Compressor oil
HP Switch, Make : Danfos / Indfos / ALCO
LP Switch, Make : Danfos / Indfos / ALCO
Condensor Refrigerant sensor
Discharge line temperature sensor
Evaporator leaving/ entering water pair sensor
Condensor leaving/ entering water pair sensor
Supply only following spares for Fan coil unit 1/1.5 TR capacity - 43 Nos : -
Thermostat model No T 6373, Make : Honey Well for FCU
Long shaft with accessories for FCU Blower Motor
FCU tray with double layers of 0.7mm thick GI sheet
Blower motor winding 1/10 HP
Supply only following spares for AHUs - 09 Nos of sizes (12.5 TR to 160 TR) : -
Material and labour for fabrication work and installation of AHU cabinet of height upto 1.60 mtr as per existing size with 16 SWG GI sheet including MS channels of required size and length as per existing with legs as per site requirement and arrangement for mounting of AHU motor with adjustable base frame, and making opening for chilled air duct outlet including dismantling of old AHU cabinet all as specified and as directed by the Engr-in-Charge. Note: - The AHU cabinet shall be measured only top portion in sqm i.e length & width and payment accodingly.
Material and labour for insulation of inner surface of AHU cabinet with acoustic insulation comprising of layers of 12 mm thick acoustic rigid fibre glass sheet covered with onionskin paper fastened with 26 SWG aluminium perforated sheet fixed with bolts and nuts including taking out of old insulation all as specified and as directed.
Supply only Fine filter of size .620 x 508 x 45 mm for AHU cooling coil
Supply only Fine filter of size 600 x 500 x 40 mm for AHU cooling coil
Supply only Ball Bearing No 6306, Make SKF for motor capacity 5 HP
Supply only Ball Bearing No 6308, Make SKF for motor capacity 7.5 HP
Supply only of Bearing for blower (Pilo Block bearing Model No UC207, Make - FYH /NTN
Supply only of Bearing for blower (Pilo Block bearing Model No UC206, Make - FYH /NTN
Supply only of V belt of size B-94
Supply only of V belt of size B-93
Supply only of V belt of size B-92
Supply only of V belt of size B-90
Supply only of V belt of size B-89
Supply only following spares for Cooling Tower, Make - Paharpur:-
Supply only of Spiral target nozzel
Fill pack sheet
Servo system gear oil
Support structure for Cooling Tower motor for Cooling Tower Model No: 21104 (T&B) of make Paharpur Cooling Towers Ltd
Ball brass valve high pressure, with polythene float and flynut complete screwed for iron pipe 25 mm
Supply only following spares for LT Panel: -
Supply only MCCB , 100 Amp ,4 Pole
Supply only MCCB 63 Amp 4 Pole
Supply only MCB 20 Amp, 3 Ph
3 pole power contractor AC3 rating 40 Amp, make: L&T, type ML 3 of or equivalent
3 pole power contractor AC3 rating 32 Amp, make: L&T, type ML 2 of or equivalent model given in PS
3 pole power contractor AC3 rating 25 Amp, make: L&T, type ML1.5 of or equivalent model given in PS
Thermal overload relay direct mounting 14 to 23 Amp, make: L&T, Cat No SS94135OODO or equivalent model given in PS
Thermal overload relay direct mounting 20 to 33 Amp, make: L&T, Cat No SS94136OOEO or equivalent model given in PS
Thermal overload relay direct mounting 30 to 50 Amp, make: L&T, Cat No SS94136OOGO or equivalent model given in PS
Analog Timer 415V, 50 Hz 3-30 seconds, make: L&T, type ET 100/ ST 100 or equivalent model given in PS
Descaling and cleaning of condensors by using Kirloskar recommended cleaning solution followed by mechanical cleaning of condensor tubes including replacement of nut bolts and gasket etc in every 6 months or as and when ordered by Engineer-in- Charge.
Descaling and cleaning of evaporators by using Kirloskar recommended cleaning solution followed by mechanical cleaning of evaporator tubes including replacement of nut bolts, suitable insulation and gasket etc in every 6 month or as and when ordered by Engineer-in- Charge.
Descaling and cleaning of AHU coils from outside and cooling tubes from inside by flowing suitable chemical in the tubes for removing all foreign material deposited in the coil and tubes as and when ordered by Engineer-in-Charge. [Note: Rates quoted by contractor for item No 12 to 14 deemed to be inclusive of necessary arrangement viz. necessary water jet pumps, coil cleaning chemicals, tools etc]
Material and Labour for cleaning of HVAC duct thoroughly including taking necessary photographs before and after cleaning all as specified and as directed by the Engr-in-Charge
Dismantling of existing MS pipes with insulation by carefully dismantling from chilled water pipe line with gas cutting where necessary and Supply and laying MS pipes 'medium' grade as per IS: 1239 (Part-I) of make: TATA / SAIL/JINDAL with electric welding where necessary and laid in floors or fixed to walls and ceillings etc all as specified and as directed of the following sizes:- Note: - Pipe fittings all type shall be measured and paid under separate item of this schedule.
20 mm bore
25 mm bore
40 mm bore
50 mm bore
80 mm bore
100 mm bore
150 mm bore
200 mm bore
Supply and fixing in repairs of MS Flange with rubber gasket including electric welding with MS pipes suitable for fixing with the following sizes of MS pipes: - [Note: - Bolts, nuts and washers will be measured and paid under separate item]
40 mm bore
50 mm bore
80 mm bore
100 mm bore
150 mm bore
200 mm bore
Material and Labour for Mild steel screw bolts (machine made) with hexagonal or square heads at one end and screwed the other, or screwed both ends, each screwed end to be fitted with washers and one hexagonal or square nut all as specified and as directed.
Supply and fixing in repairs of MS Pipes such as Bends, Tapers, "Y" junction, double branch, cross, Tee pieces (single & double branch), any type and angle/ radius and straight connecting pieces all as specified and as directed.
Material and Labour for insulation of MS Pipe with PUF slab (Density 36 kg/ cm2) upto 50 mm thick and not less than 40 mm thick with and including applying bituminous compound and cladding with sheet metal cladding with aluminium not less than 22 gauge thick complete suitable for insulating the following sizes of MS pipe: -
20 mm bore
25 mm bore
40 mm bore
50 mm bore
80 mm bore
100 mm bore
150 mm bore
200 mm bore
Material and labour for dismantling of old butterfly valves and fixing of new Butterfly valve of make: C&R / Kartar / Pelicon or equivalent in other approved make all as specified and as directed suitable for the following sizes of pipe:- Note:- Bolts, nuts and washers will be measured and paid separately.
40 / 50 mm bore
80 mm bore
100 mm bore
150 mm bore
200 mm bore
Note: Schedule of credit (SCHEDULE OF CREDIT) amount of Rs __________ mentioned on Page No _______ shall be deducted from the total quoted amount of BOQ.
KWALITY CONSTRUCTION
INDIA ELECTRICAL EQUIPMENTS
RADHA ENTERPRISE
UNIVERSAL
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .