| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹28.5 LAccepted-AOC H NO 1640 GURUDWARA ROAD RAJPURA DISTT PATIALA | PATIALA | PUNJAB | 140401 | ₹28.5 L | L1 | Accepted-AOC L1 |
| 2 | L2₹29.8 LRejected-Finance | ₹29.8 L | L2 | Rejected-Finance minus 1.00 percent less bid quoted as compared to tendered amount |
| 3 | L3₹29.9 LRejected-Finance | ₹29.9 L | L3 | Rejected-Finance minus 0.50percent less bid quoted as compared to tendered amount |
Tender Value
₹30.1 L
EMD Value
₹60,123
Closing Date
2 Jun 2026, 10:00 amClosed
Sh. Gurinder Singh
old sdm building backside shaheed bhagat singh stadium ferozepur
Earthwork for the excavation of trenches and laying of RCC UGPL of dia 450mm along with the fixing of the risers air vent alpha valve and pumpstand
2026_DOA_168781_1
DSWC/FER/2026-2027/02
Open Tender
Pipe Laying Works
fazilka
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,500
Yes
₹60,123
Yes
30 Jun 2026
22 May 2026
2 Jun 2026
22 May 2026
2 Jun 2026
22 May 2026
DEPARTMENT OF SOIL AND WATER CONSERVATION PUNJAB
E-TENDER NO. DSWC/FER/2026-27/02
Name of the Firm/Bidder
Adress of Firm/Bidder
Mobile Number of Bidder Email id of Bidder
Name of Work :- Earth work for excavation of trenches and Laying of underground RCC pipe line of 450 mm along with the fixing of riser,alfa alfa valve,air vent and pump stand (showing below in details) at District Fazilka
Total Estimated Amount of Work Rs 3006130 Thirty lakh six thousand one hundred thirty ruppes only
Quoted by Contractor (- or + to estimated amount in figure up to 2 decimal point only) Quote (-/+) 0
Note :- Please Quote only figure up to 2 decimal points) in above blue colors box in minur or plus
Details of works
Name of Work :- Laying of underground RCC pipe line of 450 mm dia at Village banna wala Tehsil Fazilka District Fazilka (Mogha No. 19100/R)
(A) Earth work in Excavation in trenches, lowering and jointing of RCC pipes, fixing of risers, alfa alfa valves, air vent pipes, pump stands and construction of Haudies
Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
Earth work in Excavation in trenches including dressing Bottom & sides of trenches, stacking the excavated Soil Clear from the edge of excavation & subsequent filling around layed pipes in 15 cm layer with compaction including disposal of all surplus soil as directed within a lead of 30 meters. 14700 /cum 93.78 Ninty Three Rupees and seventy eight Paise 1378566
Lowering of R.C.C. Class NP-2 Pipes of 450 mm dia in to trenches for all depths and laying out the same to correct alignment, gradients level etc. 9131 /m 71 Seventy One Rupees and Zero Paise 648301
Jointing of class N.P.2 R.C.C pipes of 450 mm dia in trenches using collar joints jointed with 1:1 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects upto the satisfaction site incharge. 3652 /number 239.09 Two Hundred ThreetyNine rupees and zero nine Paise 873156.68
Cutting reinforcement, concrete pipes, chipping & finishing the cut surface to a uniform shape upto the satisfaction of site incharge (150 mm) 15 /cut 41 Forty One Rupees and Zero Paise 615
Cutting reinforcement, concrete pipes, chipping & finishing the cut surface to a uniform shape upto the satisfaction of site incharge (450 mm) 61 /cut 116 One hundred Sixteen rupees and zero Paise Only 7076
Fixing of Air vent Pipes of 150 mm diamater, T jointing with cement concrete 15 /Air pipe 256.84 Two Hundred fifty six Rupees and Eighty foure Paise Only 3852.5999999999995
Fixing of Risers of 450 mm diameter, T jointing with cement concrete 61 /Riser 826.51 Eight hundred twenty six Rupees and Fifty one Paise Only 50417.11
Fixing of Risers of 450 mm diameter Alfa alfa valve 61 /Riser 125 One hundred Twenty five Rupees and zero Paise Only 7625
Total 2969609.39
(B) Works for 1000 mm Spigot & Socket NP-2 RCC pipe (Pump Stand)
Earth work in Excavation of Haudi's 8 /cum 93.78 Ninty Three Rupees and seventy eight Paise 750.24
Foundation of Pump Satnd @ 1:8:16 0.6 /cum 3882.63 Three Thousand Eight Hundred Eighty two Rupees and Sixty three Paise Only 2329.578
Material For Fixing of Pump Stand 1 /No 3624.28 Three Thousand six Hundred Twenty four Rupees and Two eight Paise Only 3624.28
Cost of One Pump Stand 6704.098
Total Cost for four Pump Stand 33520.49
(C) Cost of Other Items
Sign Board (4' X 3') 1 /number 3000 Three Thousand Rupees and Zero Paise 3000
Grand Total 3006129.8800000004
*Rates are inclusive of all material except RCC Pipes NP2, AAV and Gate Valve
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.08 MB
DNIT.pdf
Tender Documents • 0.48 MB
fbid1.xls
Tender Documents • 0.03 MB
Download all tender documents and submit your bid