Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.5 LAccepted-AOC | L1 | Accepted-AOC Accepted | |
| 2 | L2₹2.5 L+₹2,605 (1.05%)Rejected-AOC | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | sirpi infrastructure L1 | JAI CONSTRUCTIONS L2 |
|---|---|---|---|---|---|
| 1.00 | Dismantling the damaged Plain Cement concrete flooring work as per the instruction of Departmental officers. Including all initial lead and other labour charges. | 5 | Cum | 534 ₹2,670 Lowest | 535 ₹2,675 |
| 2.00 | Earth work for CC Flooring to required depth, either by cutting and disposal of excavated soil to areas of fill or by filling with earth suitable for filling brought from areas of cutting or borrow pits in all kinds of soils except rock requiring blasting | 3 | Cum | 181 ₹543 Lowest | 190 ₹570 |
| 3.00 | Conveyance the excess earth or earth not suitable for refilling, dumping and spreading, levelling of the same at places of dump approved by departmental officers and as directed including lorry hire charges, labour for loading, unloading, spreading, leveling, making approaches for areas of dumps etc., complete. | 8 | Cum | 67 ₹536 Lowest | 70 ₹560 |
| 4.00 | Cement concrete 1:4:8 (one cement, four sand and eight aggregate ) using 40mm gauge hard broken granite stone jelly for All CC items of work excluding centering, shuttering, and cost of reinforcement grill but including curing finishing etc., complete fixtures in CC works wherever necessary as directed by departmental officer etc., complete. | 3 | Cum | 5,589 ₹16,767 Lowest | 6,000 ₹18,000 |
| 5.00 | Supplying and erecting centering for sides and soffits including supports and strutting for plain surfaces such as reinforced cement concrete slabs, walls etc., with all cross bracing etc., including decentering after curing period,complete complying with standard specifications, at all leads inside the building, at all heights. | 11 | Sqm | 488 ₹5,368 Lowest | 500 ₹5,500 |
| 6.00 | Plain cement concrete 1:2:4 mix (One part of cement, two parts of sand and four aggregates) using 20mm gauge hard stones complying with standard specification. | 32 | Cum | 6,963 ₹2,22,816 Lowest | 7,000 ₹2,24,000 |
| 7.00Add :- GST @ 18% | |||||
Tender Value
₹3 L
EMD Value
₹3,000
Closing Date
30 Oct 2025, 3:00 pmClosed
Assistant Commissioner, South Zone
South Zone, Coimbatore Corporation, Kuniyamuthur, Coimbatore 641008
Restoration of cement concrete flooring at Panchayat office road cut lane Near Amma Unavagam (162098L1142) in Ward No 98, South Zone
2025_MAWS_616185_42
E6 / South Zone / 2025
Open Tender
Civil Works
Works
120 days
South Zone, Coimbatore Corporation
As per the tender condition attached
4 documents required · 4 mandatory
₹0
₹3,000
3 Dec 2025
25 Oct 2025
31 Oct 2025
26 Oct 2025
30 Oct 2025
26 Oct 2025
Amount
Dismantling the damaged Plain Cement concrete flooring work as per the instruction of Departmental officers. Including all initial lead and other labour charges.
Earth work for CC Flooring to required depth, either by cutting and disposal of excavated soil to areas of fill or by filling with earth suitable for filling brought from areas of cutting or borrow pits in all kinds of soils except rock requiring blasting
Conveyance the excess earth or earth not suitable for refilling, dumping and spreading, levelling of the same at places of dump approved by departmental officers and as directed including lorry hire charges, labour for loading, unloading, spreading, leveling, making approaches for areas of dumps etc., complete.
Cement concrete 1:4:8 (one cement, four sand and eight aggregate ) using 40mm gauge hard broken granite stone jelly for All CC items of work excluding centering, shuttering, and cost of reinforcement grill but including curing finishing etc., complete fixtures in CC works wherever necessary as directed by departmental officer etc., complete.
Supplying and erecting centering for sides and soffits including supports and strutting for plain surfaces such as reinforced cement concrete slabs, walls etc., with all cross bracing etc., including decentering after curing period,complete complying with standard specifications, at all leads inside the building, at all heights.
Plain cement concrete 1:2:4 mix (One part of cement, two parts of sand and four aggregates) using 20mm gauge hard stones complying with standard specification.
Add :- GST @ 18%
JAI CONSTRUCTIONS (BID ID -1500352)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Document
0.66 MB
Tender Documents
Tender Documents • 0.56 MB
BOQ
BOQ • 0.32 MB
Additional Documents
Additional Documents • 0.20 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .