| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.8 CrAccepted-AOC MALIGAON BORIPARA P O PANDU P S JALUKBARI DIST KAMRUP M ASSAM PIN 781012 | GUWAHATI | KAMRUP | ASSAM | 781012 | L1 | Accepted-AOC Awarded | |
| 2 | L2₹1.8 Cr+₹1.5 L (0.84%)Rejected-AOC H NO 67 KALYANI NAGAR KALYANI SAGAR PATH KAHILIPARA P O P S DISPUR GUWAHATI 781019 | GUWAHATI | KAMRUP METROPOLITAN | ASSAM | 781019 | L2 | Rejected-AOC Not Awarded | |
| 3 | L3₹1.8 Cr+₹7.4 L (4.20%)Rejected-AOC SUBHASH PALLY WARD NO 3 P O KOKRAJHAR P S KOKRAJHAR DIST KOKRAJHAR BTC ASSAM | KOKRAJHAR | ASSAM | 783331 | L3 | Rejected-AOC Not Awarded | |
| 4 | L4₹1.8 Cr+₹7.7 L (4.32%)Rejected-AOC CHANDA VILA KALIBARI PUKURPAR HOJAI LUMDING P O LUMDING P S LUMDING DIST NAGAON PIN 782447 ASSAM | HOJAI | ASSAM | 782447 | L4 | Rejected-AOC Not Awarded | |
| 5 | L5₹1.9 Cr+₹12.5 L (7.05%)Rejected-AOC | L5 | Rejected-AOC Not Awarded |
| Sl No | Description | Qty | Unit | Sri Mrinal Saikia L2 | M.S. J.M.Enterprise L1 | MRINAL DAS L3 | ARNAB BHATTACHARJEE L4 | SATYAJIT SEN L5 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m, as directed by Engineer-in- Charge: | 191.7 | Cum | 150 ₹28,755 | 189.87 ₹36,398.76 | 98.44 ₹18,870.95 Lowest | 286 ₹54,826.2 | 286 ₹54,826.2 |
| 2.00 | Dry brick pitching half brick thick in drains including supply of bricks and preparing the surface complete With common burnt clay F.P.S. (non modular) bricks of class designation 7.5 | 119.82 | Sqm | 450 ₹53,919 | 821.57 ₹98,440.31 | 558.62 ₹66,933.85 | 320 ₹38,342.4 Lowest | 1,005 ₹1,20,419.1 |
| 3.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:3:6 (1 Cement : 3 coarse sand (zone-lll) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources | 9.43 | Cum | 6,500 ₹61,295 | 6,139.68 ₹57,897.15 | 6,286.73 ₹59,283.86 | 6,000 ₹56,580 | 5,500 ₹51,865 Lowest |
| 4.00 | Steel reinforcement for R.C.C. work including straightening, cutting,bending, placing in position and binding all complete above plinth level.. Thermo-Mechanically Treated bars of grade Fe-500D or more. . | 13,162.52 | Qntl | 90 ₹11,84,626.8 | 81.72 ₹10,75,576.9 Lowest | 82.48 ₹10,85,644.65 | 90 ₹11,84,626.8 | 118 ₹15,53,177.36 |
| 5.00 | Centering and shuttering including strutting, propping etc. and removal of form work for :Foundations, footings, bases of columns, etc. for mass concrete | 431.33 | Sqm | 300 ₹1,29,399 | 375.45 ₹1,61,941.92 | 283.31 ₹1,22,200.1 Lowest | 307.95 ₹1,32,828.07 | 604 ₹2,60,523.32 |
| 6.00 | Centering and shuttering including strutting, propping etc. and removal of form work for :Lintels, beams, plinth beams, girders, bressumers and cantilevers | 265.62 | Sqm | 500 ₹1,32,810 | 538.88 ₹1,43,136.8 | 559.68 ₹1,48,662.2 | 307.95 ₹81,797.68 Lowest | 604 ₹1,60,434.48 |
| 7.00 | Centering and shuttering including strutting, propping etc. and removal of form forColumns, Pillars, Piers, Abutments, Posts and Struts | 433.46 | Sqm | 650 ₹2,81,749 | 618.38 ₹2,68,045.03 | 739.91 ₹3,20,721.39 | 804.25 ₹3,48,610.2 | 604 ₹2,61,809.84 Lowest |
| 8.00 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 83.37 | cum | 8,000 ₹6,66,960 | 7,950.66 ₹6,62,846.55 | 7,695.06 ₹6,41,537.15 Lowest | 8,364.2 ₹6,97,323.35 | 8,370 ₹6,97,806.9 |
| 9.00 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3 (1 cement : 1.5 coarse sand(zone-lll) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 23.97 | cum | 9,000 ₹2,15,730 | 8,436.53 ₹2,02,223.72 Lowest | 9,370.24 ₹2,24,604.65 | 10,185.1 ₹2,44,136.85 | 10,500 ₹2,51,685 |
| 10.00 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in:Cement mortar 1:4 (1 cement : 4 coarse sand) | 58.73 | cum | 6,000 ₹3,52,380 | 5,432.95 ₹3,19,077.22 | 6,331.44 ₹3,71,845.47 | 1,018.05 ₹59,790.08 Lowest | 10,500 ₹6,16,665 |
Tender Value
₹2.0 Cr
EMD Value
₹4.0 L
Closing Date
7 Apr 2026, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Chief Engineer
Assam Police Housing Corporation Ltd Rehabari Guwahati 8
Construction of APRO Colony improvements at Paltan Bazar area Construction of brick boundary wall along with 2 nos of Iron Gate RCC drain Internal road with paver blocks and earth filling on the low laying areas
2026_APHC_51911_1
APHC/CS/18/2025-26_APRO_PBazar
Open Tender
Civil Works - Building
Item Rate
365 days
APRO Paltan Bazar
Please refer Tender documents.
6 documents required · 6 mandatory
₹4,013
₹4.0 L
Yes
3 Oct 2026
13 Mar 2026
8 Apr 2026
13 Mar 2026
7 Apr 2026
13 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m, as directed by Engineer-in- Charge: | 1 | Cum | - | - |
| 2 | Dry brick pitching half brick thick in drains including supply of bricks and preparing the surface complete With common burnt clay F.P.S. (non modular) bricks of class designation 7.5 | - | Sqm | - | - |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:3:6 (1 Cement : 3 coarse sand (zone-lll) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources | 1 | Cum | - | - |
| 4 | Steel reinforcement for R.C.C. work including straightening, cutting,bending, placing in position and binding all complete above plinth level.. Thermo-Mechanically Treated bars of grade Fe-500D or more. . | - | Qntl | - | - |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form work for :Foundations, footings, bases of columns, etc. for mass concrete | 1 | Sqm | - | - |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form work for :Lintels, beams, plinth beams, girders, bressumers and cantilevers | - | Sqm | - | - |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form forColumns, Pillars, Piers, Abutments, Posts and Struts | 1 | Sqm | - | - |
| 8 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | - | cum | - | - |
| 9 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3 (1 cement : 1.5 coarse sand(zone-lll) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 1 | cum | - | - |
| 10 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in:Cement mortar 1:4 (1 cement : 4 coarse sand) | 1 | cum | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.49 MB
APRO_Colony_BID_merged_compressed.pdf
Tender Documents • 6.23 MB
FOB.pdf
Additional Documents • 0.01 MB
BOQ_82264.xls
BOQ • 0.30 MB
Corrigndum.pdf
PDF • 0.82 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .