Tender Value
₹5.9 Cr
EMD Value
₹11.9 L
Closing Date
29 Jul 2026, 3:00 pm3d left
Superintending Engineer Drainage Circle Ghaziabad
OFFICE OF SE DRAINGE CIRCLE, GHAZIYABAD
Construction of 3 lane bridge at km. 2.700 of Hawaliya Drain in District Gautambudhnagar
2026_UPIDC_1170052_5
03/SE/2026-27
Open Tender
Civil Works
Item Rate
365 days
Gautambudhnagar
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
₹11.9 L
22 Jul 2026
22 Jul 2026
29 Jul 2026
22 Jul 2026
29 Jul 2026
22 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means) / in manual means in foundation trenches or drains (not exceeding 1.5 m width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. | - | cum | - | - |
| 2 | Providing and laying in position ready mixed or site batched design mix cement concrete for plain cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana/Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering and finishing as per direction of the engineer-in-charge; for the following grades of concrete.All works upto plinth level :Concrete of M15 grade with minimum cement content of 240 kg /cum | - | cum | - | - |
| 3 | Boring, providing and installation bored cast-in-situ reinforced cement concrete piles of garde M-35 of specified diameter and length below pile cap, to carry a safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of boring with bentonite solution and temporary casing of appropriate length for setting out and removal of same and the length of the pile to be embedded in the pile cap etc. by Crawler mounted, telescopic boom hydraulic pilling Rig all complete, including removal of excavated earth with all its lifts and leads (length of pile for payment shall bemeasured up to bottom of pile cap).Note: Truck Mounted rotary/TMR/Tube well boring machine shall not be used 20.2A.4 -1200 mm dia pile | - | Rmt. | - | - |
| 4 | Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete.
All works upto plinth level Concrete of M35 grade with minimum cement content of 370 kg /cum | - | cum | - | - |
| 5 | Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete. All works above plinth level Concrete of M35 grade with minimum cement content of 370 kg /cum | - | cum | - | - |
| 6 | Centering and shuttering including strutting, propping etc. and removal of from for Foundations, footings including all cost of material labour T&P etc require for completion of work. | - | Sqm | - | - |
| 7 | Centering and shuttering including strutting, propping etc. and removal of from for Abutments, Posts and Struts including all cost of material labour T&P etc require for completion of work. | 1 | Sqm | - | - |
| 8 | Centering and shuttering including strutting, propping etc. and removal of from for Suspended floors, roofs, landings, including all cost of material labour T&P etc require for completion of work. | - | Sqm | - | - |
| 9 | Centering and shuttering including strutting, propping etc. and removal of from for beams, plinth beams, girders including all cost of material labour T&P etc require for completion of work. | 1 | Sqm | - | - |
| 10 | Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per 1S: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge, for the following grades of concrete.:
Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement. Concrete of M50 grade with minimum cement content of 410 kg /cum
5.33.2.5 All works above plinth level -M-50 | 1 | cum | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.34 MB
Tendernotice_2.pdf
PDF • 0.18 MB
BookletTenderbridgeRetender.pdf
Tender Documents • 1.90 MB
BOQ_2198875.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].