| 1 | SINGLE₹2.6 LAccepted-AOC KOTA BASTI PO SHAKTINAGAR DISTT SONBHADRA U P PIN 231222 | KOTA BASTI | SONBHADRA | UTTAR PRADESH | 231222 | SINGLE | Accepted-AOC AWARD OF WORK TO SINGLE BIDDER |
Tender Value
₹3.0 L
EMD Value
₹3,800
Closing Date
9 Aug 2022, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
GENERAL MANAGER EXCAVATION
NCL KHADIA PROJECT, SHAKTINAGAR, SONEBHADRA, U.P.
Repairing / replacement of lower and upper rail segments of swing circle assembly along with realignment of swing rollers of BE-195B Prakash Shovel of Khadia Project
2022_NCL_250924_1
KHD/G.M. (Excv)/E-Tender/22-23/389
Open Tender
Excavation Department Work
Item Rate
14 days
NCL KHADIA PROJECT, SHAKTINAGAR
Please refer Tender documents.
6 documents required · 6 mandatory
₹3,800
7 Nov 2022
21 Jul 2022
10 Aug 2022
21 Jul 2022
9 Aug 2022
22 Jul 2022
21 Jul 2022 - 29 Jul 2022
Amount
Scope of Work:- 1. Cleaning of inside and out side of swing circle assembly. 2. Dismantling & fitment of outer & inner frame with swing roller. 3. Dismantling & assembling of lower & upper rail.
Labour Charges for Cleaning of inside and out side of swing circle assembly & removal of swing rollers Note : It includes a group of 4 Nos. Semi-Skilled & 4 Nos. Un-skilled manpower along with 1 No. Supervisor per shift in 2 shift for 5 days .
Labour Charges for dismantling of outer frame, Note : It includes a group of 1 No. Skilled & 1 No. Semi-Skilled manpower along with 1 No. Supervisor in 1 shift for 1 days .
Labour Charges for fitment of outer frame, Note : It includes a group of 1 No. Skilled & 1 No. Semi-Skilled manpower along with 1 No. Supervisor in 1 shift for 1 days .
Labour Charges for dismantling of inner frame with swing roller Note : It includes a group of 1 No. Skilled & 1 No. Semi-Skilled manpower along with 1 No. Supervisor in 1 shift for 1 days .
Labour Charges for fitment of of inner frame with swing roller , Note : It includes a group of 1 No. Skilled & 1 No. Semi-Skilled manpower along with 1 No. Supervisor in 1 shift for 1 days .
Labour Charges for dismantling and assembling of 12 Nos. lower rails & 06 Nos. upper rails. Note : It includes a group of 4 No. Skilled Fitter, 4 No. semi-skilled & 4 Nos. un-Skilled manpower along with 1 No. Supervisor per shift in 2 shift for 5 days.
Charges for preparation of Jigs & Fixtures and steel block for lifting the machine for opening of rollers, outer & inner frame.
Hiring Charges for above job
Gas cutting sets 1 No for a Max Period of 10 days
Transportation charges for a Max Period of 10 days
Total impact of GST for the purpose of CTC
stage.html
html • 0.03 MB
techsummary_259271.pdf
PDF • 0.10 MB
finsummary_259271.pdf
PDF • 0.10 MB
scan0395.pdf
PDF • 1.16 MB
finance_259271.pdf
PDF • 0.10 MB
BOQ Comparative Chart
xlsx • 0.01 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.07 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .