| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.6 LAdmitted-Finance 344 RAMKRISHNA NAGAR MUKHERJEE VILLAP O LASKARPUR KOLKATA 700153 | 24 PARAGANAS SOUTH | WEST BENGAL | 700153 | L1 | Admitted-Finance | ||
| 2 | L2₹2.6 L+₹6,277.37 (2.44%)Admitted-Finance 102 1 PURBA FULL BAGAN KOL 700086 | KOLKATA | WEST BENGAL | 700086 | L2 | Admitted-Finance | ||
| 3 | L3₹2.7 L+₹10,033.51 (3.90%)Admitted-Finance 14 SANTOSH ROY ROAD MAIL 7 SANTOSH ROY ROAD KOLKATA 700008 | KOLKATA | WEST BENGAL | 700008 | L3 | Admitted-Finance |
Tender Value
₹2.6 L
EMD Value
₹5,200
Closing Date
21 Sept 2026, 5:00 pmClosed
EX.ENGINEER
BAGHAJATIN MARKET COMPLEX UNIT II KOLKATA 700092
MAINTENANCE OF DRINAGE SYSTEM AND ALLIED WORKS AT B P TOWNSHIP BRIJI AND SURROUNDING AREAS IN WARD NO110 BR XI
2026_KMC_1042009_1
XI/110/009/26-27/R
Open Tender
CIVIL WORKS
Percentage
60 days
WARD NO-110
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹5,200
Yes
6 Oct 2026
14 Sept 2026
23 Sept 2026
14 Sept 2026
21 Sept 2026
14 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | SECTION(B) - SANITARY AND DRAINAGE WORKS.(B)-(II) SOIL PIPE AND FITTINGS.(a) Original Works.(16.)Supplying, fitting and fixing with cement jointing (3:1) salt glazed stoneware pipe including excavation of earth upto 1.50 metre depth in all sorts of soil both mixed or unmixed and refilling (but excluding concreting at bottom and sides).(iii) 150 mm | 46.9 | METER | 334 | ₹15,664.6 |
| 2 | BUILDING WORKS ( C ) BRICKWORKS, CONCRETE WORKS Etc. A. BRICK WORKS 1. Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. ( 3rd Corrigenda & addenda dated 04.06.2018) | 34.8 | SQUARE METER | 361 | ₹12,561.28 |
| 3 | BUILDING WORKS ( C ) Brickworks,Concrete Works etc B. CONCRETE WORKS 1. Cement concrete with graded jhama khoa (30 mm size) excluding shuttering In ground floor and foundation (b) 1:4:8 proportion | 7.36 | CUBIC METER | 4,373 | ₹32,199.71 |
| 4 | BUILDING WORKS ( C ) Brickworks,Concrete Works etc A. BRICK WORKS 7. Brick work with 1st class bricks in cement mortar (1:4) (a) In foundation and plinth | 7.88 | CUBIC METER | 5,575 | ₹43,903.13 |
| 5 | ORDINARY CEMENT CONCRETE ( MIX 1:1.5:3 ) WITH GRADED STONE CHIPS ( 20 MM NOMINAL SIZE) EXCLUDING SHUTTERING AND REINFORCEMENT, IF ANY, IN GROUND FLOOR AS PER RELEVANT IS CODES (BASED ON PWD SCHEDULE OF RATES, W.E.F. 01.11.2017 WITH CORRIGENDA DT.04.06.2018) | 1.13 | CUBIC METER | 6,216 | ₹6,993 |
| 6 | Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction. | 0.09 | MATRIC TON | 57,301.38 | ₹5,060.43 |
| 7 | MATERIALS AND LABOUR ETC.(C)-(I) MISCELLANEOUS 28.Cleaning rubbish, sludge, weeds scum, liquid earth, mud etc.etc.from road side masonary drain/ hume pipe drain/ culvert etc. by mathor labour after removing concrete.Slab/manhole cover etc.without damaging the same and refixing the same properly after cleaning as necessary and removing thesludge etc.etc.by using iron pans,buckets including all labour, tools & plants including removing the spoils in dry condition and disposing thesame by truck beyond the road side in conformity with municipal/corporation rules for such disposal including loading into truck and cleaning the road side in all respects as per direction of the Engineerin- Charge. (Payment will be made on the basis of actual stack measurment of spoils in dry condition at roadside) | 72.6 | CUBIC METER | 289 | ₹20,981.4 |
| 8 | BUILDING WORKS ( C ) Brickworks,Concrete Works etc?36...Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor).(When the height of a particular floor is more than 4 m the equivalent floor height shall be taken as 4 m and extra for works beyond the initial 4 m ht. shall be allowed under 12 (e) for every 4 m or part thereof).(a) 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-In-Charge.Notes:- For shuttering in shell roof, grid roof with vertical faces folded plate, arched roof the rate in 36 (a), 36 (b) & 37 (c ) of subhead B above to be increased by 100 % . For grid roof with splayed faces, rate is to be increased by 150%. | 3 | SQUARE METER | 335 | ₹1,005 |
| 9 | SECTION 1. ------------BUILDING WORKS (I) PLASTERING, POINTING ETC. A. ORIGINAL WORKS 1.Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface](ii) With 1:4 cement mortar (a) 20 mm thick plaster | 31.5 | SQUARE METER | 186 | ₹5,859 |
| 10 | SECTION 1. ------------BUILDING WORKS (I) PLASTERING, POINTING ETC. A. ORIGINAL WORKS 15 Neat cement punning about 1.5mm thick in wall, dado, window sill, floor etc. NOTE:Cement 0.152 cu.m per100 sq.m. | 31.5 | SQUARE METER | 34 | ₹1,071 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.54 MB
tf.pdf
Tender Documents • 0.98 MB
BOQ_2557952.xls
BOQ • 0.36 MB
CIVIL.pdf
Tender Documents • 1.12 MB
ROAD.pdf
Tender Documents • 0.81 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .