| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.9 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹14.0 L+₹5,655.08 (0.41%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹14.3 L+₹36,285.87 (2.60%)Rejected-Finance | L3 | Rejected-Finance L3 | |
| 4 | L4₹16.6 L+₹2.7 L (19.1%)Rejected-Finance | L4 | Rejected-Finance L4 |
Tender Value
₹18.4 L
EMD Value
₹36,800
Closing Date
4 Mar 2024, 11:00 amClosed
EXECUTIVE ENGINEER
OFFICE OF THE EE ICD KARWI
Construction of Canal Crossing at km 49.300 of Kabrai Main Canal.
2024_UPIDC_904728_3
07/EE/2023-24
Open Tender
Civil Works
Item Rate
90 days
Distt HAMIRPUR
AS PER NIT
2 documents required · 2 mandatory
₹1,154
₹36,800
18 Mar 2024
26 Feb 2024
4 Mar 2024
26 Feb 2024
4 Mar 2024
26 Feb 2024
Amount
The quantities given here under are tentative. They can vary on either side upto any extant,the contractor shall have no claim on account of changes and shall be paid of the quantities as physically met at site reach of work for complete work.
E/W Excation In FoundationM.K.R. soil including All l Lead And Lift as per Proper Completion Of Work.
Supplying And Laying Sand In Foundation With All Cost Of Material, Labour T&P Etc Required For Completion Of Work.
Laying A40 M 10 Cement Concrete By Mechanical Mixing And Mechanical Vibrating Cement Consumption Of 4.36 Bags Per Cum Including Cost Of All Material, Labour And T&P All Leads And Lifts For Proper Completion Of Job As Per Direction Of Engineer-In-Charge.
Laying A20 M 15 Cement Concrete By Mechanical Mixing And Mechanical Vibrating Cement Consumption Of 6.10 Bags Per Cum Including Cost Of All Material,Labour And T&P All Leads And Lifts For Proper Completion Of Job As Per Direction Of Engineer-In-Charge.
Supplying and fixing 600 mm dia RCC Hume Pipe Including Cost Of material, Labour T&P etc. with all leads & lift for proper completion of Job.
Joint fixing with M15 C.C 1:2:4 including cost of material labour T&P etc. with all leads & lift For proper completion of Job.
Steel Reinforcement for R.C.C Work Including Cutting, Bending, Binding With G.I Wire & placing in position with cost of steel Reinforcement.
Centering & Shuttering For R.C.C. Work With All Cost Of Labour Material T&P Etc. Required For Completion Of Work.
Laying R.C.C 1:2:4 cement concrete by machanical mixing & Mechanical Vibrating Cement Consumption Of 6.10 Bags Per Cum Including Cost Of All Material,Labour And T&P All Leads And Lifts For Proper Completion Of Job As Per Direction Of Engineer-In-Charge.
E/W In Back Filling With All Cost Of Labour, Material, T&P With Proper Completion Of Work.
Supply and laying sand mixed with ballast in inverted filter including cost of material, labour and T.&P. etc with all leads & lefts for completion of job. As per direction of Engineer-in- charge.
Supplying And Laying Dry Stone Pitching In Canal Bed & Sides Including Cost Of All Material Labour, T&P Etc All Leads & Lift For Proper Completion Of Job As Per Direction Of Engineer-In-Charge.
Dewatering by 10 H.P. Pump including all material labour fuel etc. as proper completion of work as per direction of Engineer-in-charge. complete.
E/w in filling for making Embankment and cutting canal cross section after machanical compaction including dressing and watering with all leads & lifts labour charges and T &P etc. proper completion of work.
M/S NIRANJAN SINGH
R K SHUKLA CONSTRUCTION
RAJENDRA KUMAR PANDEY
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .