| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAccepted-AOC | ₹1.1 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.1 Cr+₹1.1 L (1.03%)Rejected-Finance | ₹1.1 Cr+₹1.1 L (1.03%) | L2 | Rejected-Finance L2 |
Tender Value
₹1.1 Cr
EMD Value
₹1.1 L
Closing Date
12 May 2023, 3:00 pmClosed
Additional Collector (Dev)
DRDA, Collectorate, Erode.
Erode District - Improvements the 2 nos road in Package No. TN 12-04 of Erode Block under MGSMT 75 percentage 2022-23
2023_RDTN_307836_7
Roc No.74399/TU1/2022, Dated 13.04.2023
Open Tender
Civil Works - Roads
Item Rate
180 days
Erode Block
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹1.1 L
DRDA, Collectorate, Erode.
11 Jul 2023
28 Apr 2023
12 May 2023
28 Apr 2023
12 May 2023
5 May 2023
5 May 2023
Amount
Bhavani Komarapalayam road to Bhavani Kavundapadi road (via) Manakattur and Chennanaickanur Km 0/0-1/860
Clearing the Scrub jungle including all labour charges for burrying and burning etc., complete.
Picking 5cm to 10cm old metalled surface and sectioning etc complete
Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A
Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compacti
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Applying PRIMECOAT over WMB/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Applying TACK COAT over Primed WBM surface at 2.5Kg of RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Bituminous Concrete of 25 mm thick shall consist of Construction in a single couse of compacted crushed aggregates premixed with bituminous binder of 80/100 grade at the rate of 3.5 % by weight of total mix to serve as base / binder course in accordance with MORTH rev IV cl.504 specification and in confirmity with drawing.
Road Marking with hot applied thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface
Provision of 15 nos. rumble strips covered with premix bituminous carpet, 15-20 mm high at centre, 250 mm wide placed at 1 m centre-to-centre at approved locations to control speed, marked with white strips of road marking paint.
Provision for KM Stone
provision HM stone
60 cm Equilateral triangle(cautionary)sign board
60 cm circular(mandatory) sign board
Construction of Pipe Culvert
Earth work excavation and depositing on bank with in initial lead of 10m and lift of 2m in hard gravelly soil as per SS 20 B for foundation
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc
Supplying errction of steel centering for cover slab and sids using steel shetters and country wood props including hire and conveyance of all materials to site and all labour charges etc.complete.
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc
Supplying and fixing of RCC hume pipes(NP3 Class) including cost of Pipes and Labour charges etc, complete.
Name Board
Towards the charges for routline maintenance of the road work executed under MGSMT including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRCSP- 20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost
For the First Year from the date of completion of work
For the Second Year from the date of completion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
Kathirampatti road to Moolakarai road Km 0/0- 1/340
Picking 5cm to 10cm old metalled surface and sectioning etc complete
Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for Cutting sidedrain etc, complete. as per SS 20 A
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
Bituminous Concrete of 25 mm thick shall consist of Construction in a single couse of compacted crushed aggregates premixed with bituminous binder of 80/100 grade at the rate of 3.5 % by weight of total mix to serve as base / binder course in accordance with MORTH rev IV cl.504 specification and in confirmity with drawing.
Road Marking with hot applied thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface
Provision of 15 nos. rumble strips covered with premix bituminous carpet, 15-20 mm high at centre, 250 mm wide placed at 1 m centre-to-centre at approved locations to control speed, marked with white strips of road marking paint.
Provision for Km stone, Hm stone,& Guardstone,etc.
KM stone
HM stone
Provision for Name board, Logo board and Cautionary sign boards etc.
60 cm Equilateral triangle(cautionary)sign board
60 cm circular(mandatory) sign board
Provision for Name board.
Towards charge for Retaining Wall
Earth work excavation and depositing on bank with in initial lead lift in Hg soil for foundation etc. complete.
Plain Cement concrete 1:4:8 mix using 40mm ISS metal including all cost and conveyance of all materials to site and all labour charges etc complete.
Supplying erecting and centering for side and soffits using M.S sheet etc complete as per std specification
Plain Cement concrete 1:3:6 mix using 40mm ISS metal including all cost and conveyance of all materials to site and all labour charges etc complete.
Weep holes
Towards the charges for routline maintenance of the road work executed under MGSMT including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRCSP- 20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost
For the First Year from the date of completion of work
For the Second Year from the date of completion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
PTK CONSTRUCTION
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .