Loading…
Loading…
Tender Value
₹26.1 L
EMD Value
₹2.6 L
Closing Date
10 Jul 2026, 1:00 pm2d left
EO
NPP Etawah
143. Construction of a drain wall and slab near Baba Atardas orchard in Purabiya Tola Pajaba.
2026_DOLBU_1160706_143
2163/J.N.V./E-Ni.su./2026-27 date 12.06.2026
Open Tender
Construction Works
90 days
ETAWAH
Please refer Tender Documents
2 documents required · 2 mandatory
₹3,422
EO
₹2.6 L
10 Jul 2026
17 Jun 2026
10 Jul 2026
17 Jun 2026
10 Jul 2026
17 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing and making the Bandha for diversion of water ............all complete | 2 | Nos | 15,000 | ₹30,000 |
| 2 | Earth work in excavation in foul condition soil / Nala Silt including 1.5 M, lift and 30 M. lead including loading and unloading ..........all complete. (SI No 252) | 570 | m3 | 150 | ₹85,500 |
| 3 | Earth work in excavation in Ordinary soil including 1.5 M, lift and 30 M. lead including loading and unloading ..........all complete. (SI No 251) | 270 | m3 | 145 | ₹39,150 |
| 4 | Providing and laying cement cocrete in 1:4:8 (1 cement: 4 sand : 8 Stone & Ballast 40 mm gauge) and curing complete including cost of formwork in foundation and floors. (S.I. No. 281) | 37.5 | m3 | 6,000 | ₹2,25,000 |
| 5 | R;C;C work with cement approved coarse Sand and 2 cm gauge approved Stone ballast in the proportion of 1:2:4 in Raft foundationin footing excluding supply of reinfocement and its binding but including its fixing and binding the same with 24 B,W,G ,G ,i vinding wire and including necessary crent ering shuttering etc .and also incluing supply of all material lavour and t& p etc but for Slab (S.I. No. 287) | 22.5 | m3 | 7,400 | ₹1,66,500 |
| 6 | R;C;C work with cement approved coarse Sand and 2 cm gauge approved Stone ballast in the proportion of 1:2:4 in wall /coloumn excluding supply of reinfocement and its binding but including its fixing and binding the same with 24 B,W,G ,G ,i vinding wire and including necessary crent ering shuttering etc .and also incluing supply of all material lavour and t& p etc but for Slab (S.I. No. 288) | 85.81 | m3 | 8,400 | ₹7,20,804 |
| 7 | M.S or Iron work in plain work such as reinforced concrete or R. B. work reinforcement in sub-structure complete as per drawing and Technical Specifications Si no 504 | 85.02 | Qtl | 7,050 | ₹5,99,391 |
| 8 | Class-150 brick in 1:3 Cement and coarse sand of 1.25 FM mortar in foundation and plinth including supply of all materials, labour and tools and plants, etc. required for proper completion of the work. (S.I. No. 307) | 8 | m3 | 6,600 | ₹52,800 |
| 9 | 12 mm thick cement plaster with cement mortor in proportion of 1:3 cement & coarse sand of single coat for interior plastering upto floor two level including internal rounded angles chemfers and rounded angles not exceeding in grith adn finished even and Stooth. (S.I. No. 13.9) | 45 | m2 | 210 | ₹9,450 |
| 10 | Providing and laying cement concret in M-15 not lass then strength of m 1:50 stone grit 20 mm. nominal size ........ all complete(S.INo.. 279a) | 15 | m3 | 7,250 | ₹1,08,750 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.76 MB
BOQ_2176906.xls
BOQ • 0.33 MB
NIT1.pdf
PDF • 1.74 MB
Download all tender documents and submit your bid