Loading…
Loading…
Tender Value
₹4.8 L
EMD Value
₹9,668
Closing Date
11 Sept 2026, 2:00 pm
Assistant Engineer, Burdwan Sub-Division, PWD
O/O Assistant Engineer, Burdwan Sub-Division, PWD Burdwan, PIN-713101
Replacement of damaged vitrified flooring by new vitrified flooring at 3rd floor of New Court Building, Under Burdwan Division, P.W.D.
2026_WBPWD_5021021_1
WBPWD/AE/BSD/NIeT-12/2026-27
Open Tender
CIVIL WORKS
Percentage
Burdwan Municipality
Please refer Tender documents.
5 documents required · 5 mandatory
₹9,668
Yes
O/O Assistant Engineer, Burdwan Sub-Division, PWD
31 Aug 2026
31 Aug 2026
14 Sept 2026
31 Aug 2026
11 Sept 2026
31 Aug 2026
3 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Taking out Mirzapur or glazed porcelain tiles carefully by chiselling from walls or floor including stacking serviceable material as directed. | 234.31 | M2 | 106 | ₹24,836.86 |
| 2 | Supplying and laying true to line and level Anti-Skid, Full Body, Homogeneous & Granular finish Vitrified Tiles conforming to IS:15622-2006 & IS 4457-2007 and testing shall be made in accordance with IS:13630 [Non- modular sizes for tiles with Skid resistance > 0.5, Mohr's hardness > 5.0, Staining resistance: Class-1, Water Absorption: E < 0.5%], MOR > 35 N/sq.mm in Internal area of building e.g. Toilet Block, Passage, Corridor, Accessible Open Terrace etc. set in 20 mm sand cement mortar (1:4) and 2 mm thick cement slurry at back side of tiles using cement @ 2.91 Kg./Sqm or using Polymerised Adhesive (6 mm thick layer applied directly over finished artificial stone floor/ Mosaic etc without any backing course) laid after application slurry using 1.75 Kg of cement per Sqm below mortar only, joints grouted with admixture of white cement and colouring pigment to match with colour of tiles/ epoxy grout materials of approved make as directed and removal of wax coating of top surface of tiles with warm water and polishing the tiles using soft and dry cloth upto mirror finish complete including the cost of materials, labour and all other incidental charges complete true to the
manufacturer's specification and direction of Engineer-in-Charge. (White cement, synthetic adhesive and grout material to be supplied by the contractor). b) In Ground Floor: Sizes-600 mm x600mm x10 mm with breaking strength >
1500 N | 234.31 | M2 | 1,618.43 | ₹3,79,214.33 |
| 3 | Removal of rubbish,earth etc. from the working site and disposal of the same beyond the compound, in conformity with the Municipal / Corporation Rules for such disposal, loading into truck and cleaning the site in all respect as per direction of Engineer in charge | 9.37 | M3 | 166 | ₹1,555.42 |
| 6 | GST-18% (SGST=9% & CGST=9%) ADD | 1 | No. | 73,009.19 | ₹73,009.19 |
| 7 | LABOUR WELFARE CESS = 1% ADD | 1 | No. | 4,786.16 | ₹4,786.16 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 7.41 MB
SpecialTermsCondition.pdf
Additional Documents • 2.45 MB
BOQ_5098303.xls
BOQ • 0.35 MB
2911.pdf
Tender Documents • 0.51 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].