Tender Value
₹3.9 L
EMD Value
₹7,800
Closing Date
7 Aug 2026, 6:00 pm
XEN REW UDHAMPUR
XEN REW UDHAMPUR
BOQ
2026_RDPR_317270_8
e-NIT No. 73 REW UDHAMPUR of 2026-27 Dated 22-07-2026
Open Tender
Civil Works
Percentage
30 days
UDHAMPUR
NIT
2 documents required · 2 mandatory
₹600
XEN REW UDHAMPUR
₹7,800
23 Jul 2026
23 Jul 2026
8 Aug 2026
23 Jul 2026
7 Aug 2026
23 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth.100% in All kinds of soil. | 5.55 | cum | 479.3 | ₹2,660.12 |
| 2 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. | 8.84 | cum | 218.4 | ₹1,930.66 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 3 | cum | 4,826.5 | ₹14,479.5 |
| 4 | P/L in position Cement conc. 1 cement:3fine sand:6graded crushed stone agg. 20 mm for foundation excluding the cost of centring & shuttering all work upto plinth level. (i) Concrete | 6.52 | cum | 5,733.6 | ₹37,383.07 |
| 5 | P/L in position Cement conc. 1 cement:3fine sand:6graded crushed stone agg. 20 mm for foundation excluding the cost of centring & shuttering all work upto plinth level. (ii) Stones | 1.63 | cum | 937.9 | ₹1,528.78 |
| 6 | Centering and shuttering including strutting, propping etc. And removal of form for: foundations,footings,bases of columns etc. For mass concrete. | 36.71 | sqm | 286.35 | ₹10,511.91 |
| 7 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in :Cement mortar 1:6 ( 1 cement : 6 coarse sand) | 9.6 | cum | 7,571.55 | ₹72,686.88 |
| 8 | Half brick masonry Half brick masonry with common burnt clay (non-modular) bricks of class designation 7.5 in foundations and plinth including curing in : 6.15.1 Cement mortar 1:3 ( 1 cement : 3 coarse sand) 6.15.2 Cement mortar 1:4 ( 1 cement : 4 coarse sand) | 4.46 | sqm | 947.25 | ₹4,224.74 |
| 9 | CEMENT PLASTER (IN FINE SAND) 12mm Cement plaster of mix 1 : 4 ( 1 cement : 4 fine sand) 1 : 6 ( 1 cement : 6 fine sand) | 90.43 | sqm | 266.2 | ₹24,072.47 |
| 10 | Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc. complete. 50 mm thick with 20mm nominal size stone aggregate | 28 | sqm | 562.15 | ₹15,740.2 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.77 MB
BOQ_1038944.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].