Loading…
Loading…
Tender Value
₹4.0 Cr
EMD Value
₹7.9 L
Closing Date
7 Jul 2026, 3:00 pm5d left
Superintending Engineer, IVth Circle Irrigation Wo
Office of the Superintending Engineer, IVth Circle Irrigation Works, Jhansi
LOT-04, Restoration of Mawai Canal System under Betwa Canal Division-I, Orai, District Jalaun
2026_UPIDC_1164587_4
02/SE-IV/2026-27
Open Tender
Civil Works
540 days
Orai
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,673
₹7.9 L
30 Jun 2026
30 Jun 2026
7 Jul 2026
30 Jun 2026
7 Jul 2026
30 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of old and damaged brick/stone masonary and plain concrete with lime or cement mortar | 1 | M3 | 469.2 | ₹468.73 |
| 2 | Earth Work in excavation for foundation in Mar, Kabar, Rankar & Kankar mixed soil including with disposal in 30 m lead and 1.50 m lift. | - | M3 | 108.2 | - |
| 3 | Supplying & laying of sand spreading in foundation i/c all labour, material,carriage from Erech quarry and T&P etc. for complete. | 1 | M3 | 2,807.46 | ₹2,804.65 |
| 4 | Supplying & laying of C.C. M-10 (1:3.6) with stone grit (20-40 mm) size in foundation of wall including all cost of material, labour,carriage from Gora Machhiya quarry and T&P etc complete. | - | M3 | 5,970.56 | - |
| 5 | Brick work (M-150) with 1:4 cement mortor including all cost of material labour,carriage from Bhoganipur and T&P etc complete. | - | M3 | 5,909.97 | - |
| 6 | Centring and shuttering for R. C.C. & C.C.work in bed block,slab & foundation C.C.including all cost of material labour T&P etc. | - | M2 | 939.6 | - |
| 7 | Cutting,bending,binding placing in position of steel Reinforcement with binding wire and cost of steel with all labour, Taxes,T&P etc complete required for proper completion of work. | - | M.T. | 72,580 | - |
| 8 | Supplying & laying of R.C.C.M-20 (1:1.5:3) cement concrete with well graded stone grit manual mixing & vibration,curing including all cost of material labour ,carriage from Gora Machhiya quarryT&P etc complete the work. | 1 | M3 | 7,833.33 | ₹7,825.5 |
| 9 | Cement pointing in 1:3 c.m. for brick work including all cost of material,labour and T&P etc. | - | M2 | 119.04 | - |
| 10 | Supply Laying painting on parapets of pucca works surface | 1 | M2 | 78 | ₹77.92 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 6.24 MB
02SEIVNIT2026-27.pdf
Tender Documents • 2.78 MB
BOQ_2183889.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid