| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.2 CrAccepted-AOC NAN | ₹3.2 Cr | 1 | Accepted-AOC L1 |
| 2 | 2₹3.4 CrRejected-Finance ALAMPUR FATEHPUR JANPAD ALIGARH | ALIGARH | UTTAR PRADESH | ₹3.4 Cr | 2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | M/s Bajrang Construction & Suppliars L1 | BHAMAR SINGH L2 |
|---|---|---|---|---|---|
| 1.00 | Dismantling of old and damaged brick/stone masonary and plain concrete with lime or cement mortar | 61.8 | M3 | 384.22 ₹23,744.8 Lowest | 1,000 ₹61,800 |
| 2.00 | Earth Work in excavation for foundation in Mar, Kabar, Rankar & Kankar mixed soil including with disposal in 30 m lead and 1.50 m lift. | 6,686.38 | M3 | 88.6 ₹5,92,413.27 | 60 ₹4,01,182.8 Lowest |
| 3.00 | Supplying & laying of sand spreading in foundation i/c all labour, material,carriage from Erech quarry and T&P etc. for complete. | 432.77 | M3 | 2,299.02 ₹9,94,946.89 | 1,800 ₹7,78,986 Lowest |
| 4.00 | Supplying & laying of C.C. M-10 (1:3.6) with stone grit (20-40 mm) size in foundation of wall including all cost of material, labour,carriage from Gora Machhiya quarry and T&P etc complete. | 1,432.46 | M3 | 4,889.29 ₹70,03,712.35 Lowest | 4,900 ₹70,19,054 |
| 5.00 | Brick work (M-150) with 1:4 cement mortor including all cost of material labour,carriage from Bhoganipur and T&P etc complete. | 3,866.07 | M3 | 4,839.67 ₹1,87,10,503 Lowest | 5,200 ₹2,01,03,564 |
| 6.00 | Centring and shuttering for R. C.C. & C.C.work in bed block,slab & foundation C.C.including all cost of material labour T&P etc. | 265.97 | M2 | 769.43 ₹2,04,645.3 | 500 ₹1,32,985 Lowest |
| 7.00 | Cutting,bending,binding placing in position of steel Reinforcement with binding wire and cost of steel with all labour, Taxes,T&P etc complete required for proper completion of work. | 5.19 | M.T. | 65,000 ₹3,37,350 Lowest | 78,000 ₹4,04,820 |
| 8.00 | Supplying & laying of R.C.C.M-20 (1:1.5:3) cement concrete with well graded stone grit manual mixing & vibration,curing including all cost of material labour ,carriage from Gora Machhiya quarryT&P etc complete the work. | 17.84 | M3 | 6,414 ₹1,14,425.76 Lowest | 6,800 ₹1,21,312 |
| 9.00 | Cement pointing in 1:3 c.m. for brick work including all cost of material,labour and T&P etc. | 5,827.14 | M2 | 97.48 ₹5,68,029.61 Lowest | 120 ₹6,99,256.8 |
| 10.00 | Supply Laying painting on parapets of pucca works surface | 28.9 | M2 | 63.87 ₹1,845.84 Lowest | 250 ₹7,225 |
Tender Value
₹4.0 Cr
EMD Value
₹7.9 L
Closing Date
7 Jul 2026, 3:00 pmClosed
Superintending Engineer, IVth Circle Irrigation Wo
Office of the Superintending Engineer, IVth Circle Irrigation Works, Jhansi
LOT-04, Restoration of Mawai Canal System under Betwa Canal Division-I, Orai, District Jalaun
2026_UPIDC_1164587_4
02/SE-IV/2026-27
Open Tender
Civil Works
Item Wise
540 days
Orai
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,673
₹7.9 L
18 Aug 2026
30 Jun 2026
7 Jul 2026
30 Jun 2026
7 Jul 2026
30 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of old and damaged brick/stone masonary and plain concrete with lime or cement mortar | 1 | M3 | 469.2 | ₹468.73 |
| 2 | Earth Work in excavation for foundation in Mar, Kabar, Rankar & Kankar mixed soil including with disposal in 30 m lead and 1.50 m lift. | - | M3 | 108.2 | - |
| 3 | Supplying & laying of sand spreading in foundation i/c all labour, material,carriage from Erech quarry and T&P etc. for complete. | 1 | M3 | 2,807.46 | ₹2,804.65 |
| 4 | Supplying & laying of C.C. M-10 (1:3.6) with stone grit (20-40 mm) size in foundation of wall including all cost of material, labour,carriage from Gora Machhiya quarry and T&P etc complete. | - | M3 | 5,970.56 | - |
| 5 | Brick work (M-150) with 1:4 cement mortor including all cost of material labour,carriage from Bhoganipur and T&P etc complete. | - | M3 | 5,909.97 | - |
| 6 | Centring and shuttering for R. C.C. & C.C.work in bed block,slab & foundation C.C.including all cost of material labour T&P etc. | - | M2 | 939.6 | - |
| 7 | Cutting,bending,binding placing in position of steel Reinforcement with binding wire and cost of steel with all labour, Taxes,T&P etc complete required for proper completion of work. | - | M.T. | 72,580 | - |
| 8 | Supplying & laying of R.C.C.M-20 (1:1.5:3) cement concrete with well graded stone grit manual mixing & vibration,curing including all cost of material labour ,carriage from Gora Machhiya quarryT&P etc complete the work. | 1 | M3 | 7,833.33 | ₹7,825.5 |
| 9 | Cement pointing in 1:3 c.m. for brick work including all cost of material,labour and T&P etc. | - | M2 | 119.04 | - |
| 10 | Supply Laying painting on parapets of pucca works surface | 1 | M2 | 78 | ₹77.92 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 6.24 MB
02SEIVNIT2026-27.pdf
Tender Documents • 2.78 MB
BOQ_2183889.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].