Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Others-Not satisfying the BQR Condition. |
Tender Value
Refer Docs
EMD Value
₹1,550
Closing Date
6 Jul 2023, 2:00 pmClosed
The Superintending Engineer/KEDC/Kanchipuram
The Superintending Engineer Kanchipuram Electy. Distn. Circle No. 1 Vellore Road, Olimohamedpet, Annamaaligai, Kanchipuram. - 631502
Improvement Works - Essential Repair works and Face lifting to the consumer shelter and APTS Vechicle parking at Central office premises, Kanchipuram.
2023_EB_330774_1
SE/KEDC/KPM/OT.2/2023.24.Civil
Open Tender
Civil Works
Works
30 days
The Superintending Engineer/KEDC/Kanchipuram
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹1,550
Yes
17 Jul 2023
23 Jun 2023
7 Jul 2023
23 Jun 2023
6 Jul 2023
23 Jun 2023
23 Jun 2023 - 26 Jun 2023
Amount
Earth work excavating and depositing on bank with initial lead of 10m and initial lift of 2 m in hard stiff clay, stiff black cotton soil, hard red earth, shale, murram, gravel, stony earth and earth mixed with small size boulders including cost of all labour, T&P, Transporting the excavated earth by haed load lead upto 100 m, including unloading in low level places of SS premises, etc., complete as directed by the Engineers at site.
Filling with M.Sand / filling sand complying with standard specification for filling watering and compaction in layers for filling in foundation and basement including the cost of all labour, lead, lift, T&P etc., complete as directed by the Engineers at site.
Providing Cement Concrete 1 : 4 : 8 using 40 mm HBG metal including the cost of all materials, lead, lift, labour, T&P etc., complete as directed by the Engineers at site.
Providing Brick work in C .M 1 : 5 using II Class Ground Moulded Chamber Burnt Bricks of 9" x 4.5" x 2 3/4" for wall and others including the cost of all materials, lead, lift, labour, T&P etc., complete as directed by the Engineers at site.
Providing Plastering with C.M. 1:3, 12 mm thick for wall side, etc., including the cost of all materials, lead, lift, labour, T&P, scaffolding charge, etc., complete as directed by the Engineers at site.
Refilling with Excavated Earth complying with standard specification for filling watering and compaction in layers for filling in foundation and basement including the cost of all labour, lead, lift, T&P etc., complete as directed by the Engineers at site.
Preparing the surface by spreading the wet mixture, with 40 to 25 mm HBG Metal and stone dust, and consolidated including the cost of all materials, lead and lift, head load, etc., complete as directed by the Engineers at site.
Preparing the surface by spreading the Stone Dust and consolidated including the cost of all materials, lead and lift, head load, etc., complete as directed by the Engineers at site.
Providing flooring using 63 mm thick Rubber Moulded Hydraulic Pressed Paver Block of approved quality and colour over the consolidated sand / stone dust coarse including cost of all materials, lead, lift, labour, transporting, etc, complete as directed by the Engineers at site.
SGST PERCENTAGE IN FIGURES
CGST PERCENTAGE IN FIGURES
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .