Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.0 LAccepted-AOC | ₹11.0 L | L1 | Accepted-AOC AOC |
| 2 | L2₹11.3 LRejected-Finance | ₹11.3 L | L2 | Rejected-Finance L2 |
| 3 | L3₹11.4 LRejected-Finance | ₹11.4 L | L3 | Rejected-Finance L3 |
| 4 | L4₹11.5 LRejected-Finance | ₹11.5 L | L4 | Rejected-Finance L4 |
| 5 | L5₹14.1 LRejected-Finance | ₹14.1 L | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | M/S TILAK SINGH YADAV L1 | M/S SHRI PAL JAIN L3 | M/S RAGHVENDRA SINGH L4 | M/S. PARMENDRA SINGH CONSTRUCTION COMPANY L2 | SWAROOP SINGH CHAUHAN L5 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in Excavation in Mar, Rankar and kankar mixed soil with all lead & lift including all material, labour and T&P etc. required for proper completion of work. | 44 | Cum | 50 ₹2,200 | 10 ₹440 | 10 ₹440 | 30 ₹1,320 | 71.2 ₹3,132.80 |
| 2.00 | Earthwork in Mar, Rankar and kankar mixed soil
infilling in embankment for making canal section
including 1.50 m lift and 1.00 km lead with proper
compaction and dressing including all cost of
material, labour, and T&P etc. complete in all
respect. | 1,613 | Cum | 180 ₹2.9 L | 150 ₹2.4 L | 150 ₹2.4 L | 18 ₹29,034 | 300 ₹4.8 L |
| 3.00 | Preparation of Subgrade excluding cost of earth work including all material, labour, T&P etc. required for proper completion of work | 1,350 | Sqm | 15 ₹20,250 | 10 ₹13,500 | 7 ₹9,450 | 10 ₹13,500 | 14.1 ₹19,035 |
| 4.00 | Providing and laying 200 micron LDPE film of 1st
grade including cost of all material, labour and T&P etc. required for proper completion of work . | 1,350 | Sqm | 50 ₹67,500 | 50 ₹67,500 | 50 ₹67,500 | 50 ₹67,500 | 70 ₹94,500 |
| 5.00 | Providing and Laying 1:2:4 cement concrete mixed by mechanical mixer including stone grite 10-20mm size with supply of all material,labour and T&P etc. for proper completion of work. | 145 | Cum | 4,250 ₹6.2 L | 5,200 ₹7.5 L | 5,000 ₹7.3 L | 6,500 ₹9.4 L | 5,000 ₹7.3 L |
| 6.00 | Providing and fixing Centering & shuttering for concrete work including cost of all material, labour , T&P etc. required for proper completion of work. | 470 | Sqm | 190 ₹89,300 | 130 ₹61,100 | 200 ₹94,000 | 150 ₹70,500 | 150 ₹70,500 |
| 7.00 | Providing and filling 15 x 35 mm joints of C.C. Lining with bitumen sealing compound including cost of all material, labour , T&P etc. required for proper completion of work . | 454 | RM | 30 ₹13,620 | 10 ₹4,540 | 25 ₹11,350 | 18 ₹8,172 | 36.1 ₹16,389.40 |
Tender Value
₹19.9 L
EMD Value
₹40,000
Closing Date
13 Feb 2026, 3:00 pmClosed
EE ICD - 1st Lalitpur
Office of The EE ICD - 1st Lalitpur
Laying of M-15 Grade Cement Concrete 1.2.4 in Raipur Dy. From km 5.250 to 5.500 of Lower Rajghat Canal system.
2026_UPIDC_1111095_6
05/EE/2025-26
Open Tender
Civil Works
30 days
Lalitpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹854
₹40,000
5 May 2026
31 Jan 2026
13 Feb 2026
31 Jan 2026
13 Feb 2026
31 Jan 2026
Earth work in Excavation in Mar, Rankar and kankar mixed soil with all lead & lift including all material, labour and T&P etc. required for proper completion of work.
Earthwork in Mar, Rankar and kankar mixed soil infilling in embankment for making canal section including 1.50 m lift and 1.00 km lead with proper compaction and dressing including all cost of material, labour, and T&P etc. complete in all respect.
Preparation of Subgrade excluding cost of earth work including all material, labour, T&P etc. required for proper completion of work
Providing and laying 200 micron LDPE film of 1st grade including cost of all material, labour and T&P etc. required for proper completion of work .
Providing and Laying 1:2:4 cement concrete mixed by mechanical mixer including stone grite 10-20mm size with supply of all material,labour and T&P etc. for proper completion of work.
Providing and fixing Centering & shuttering for concrete work including cost of all material, labour , T&P etc. required for proper completion of work.
Providing and filling 15 x 35 mm joints of C.C. Lining with bitumen sealing compound including cost of all material, labour , T&P etc. required for proper completion of work .
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.35 MB
Lot-6.pdf
Tender Documents • 3.72 MB
BOQ_2052350.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid