Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.9 LAccepted-Finance BYPASS NH NEAR SBI SIDHRA JAMMU | L1 | Accepted-Finance AS PER TERMS AND CONDITONS OF ENIT | |
| 2 | L2₹1.9 L+₹4,020 (2.12%)Accepted-Finance | L2 | Accepted-Finance AS PER TERMS AND CONDITONS OF ENIT | |
| 3 | L3₹2.0 L+₹5,332 (2.81%)Accepted-Finance BHAGWATI NAGAR JAMMU | L3 | Accepted-Finance AS PER TERMS AND CONDITONS OF ENIT |
Tender Value
₹2.0 L
EMD Value
₹3,950
Closing Date
13 Jul 2020, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EXECUTIVE ENGINEER
OFFICE OF THE EXECUTIVE ENGINEER MECHANICAL IRRIGATION DIVISION JAMMU
Repair/replacement of worn out parts of pumping unit I along with allied works at LIS Dai Chak and repair/replacement of worn out parts of pumping unit I along with allied works at LIS Datriyal
2020_IFC_99073_1
MID/J/e-NIT/2020-21/10
Open Tender
Electrical and Maintenance Works
Lump-sum
10 days
DAI CHAK AND DATRIYAL
REGISTERED AND REPUTED FIRMS HAVING WORKSHOPS
2 documents required · 2 mandatory
₹200
EXECUTIVE ENGINEER MECHANICAL IRRIGATION DIV JAMMU
₹3,950
JAMMU
16 Jul 2020
27 Jun 2020
14 Jul 2020
27 Jun 2020
13 Jul 2020
2 Jul 2020
30 Jun 2020
180 days
Amount
Repair/replacement of worn out parts of pumping unit-I along with allied works at LIS Dai Chak
Decoupling of 05 cusec Horizontal casing pump of unit no.1 at LIS Dai Chak from the motor assembly and dismantling the pump from the base frame. Carriage of the dismantled 05 cusec Horizontal casing pump set, to the nearest roadside, using manual labour, head load to nearest road side, loading in transport vehicle, carriage to the workshop in the Mechanical transport for repairs, re-assembling at workshop and then back carriage to the LIS after carrying out necessary repairs. Fitting/reinstallation at the base frame and testing on part/full load at site.
Replacement of worn out parts of 05cusec horizontal casing pump of LIS Dai Chak at workshop by way of dismantling for extraction of damaged internal parts. Providing, turning, rethreading & finishing to accurate size of new pump shaft as per specifications of old broken pump shaft. Making of new slots for feather keys. Repair to impeller by way of welding, machining, making key ways slots on the impeller and fitting of the same on the pump shaft. Repairing of pump casing by way of welding and rethreading the damaged stud/bolt holes of pump casing as per size and specification. Providing and fitting of new bush, new check nuts, new gland rings, new bearings as per sample, on the pump shaft and impeller, applying sufficient amount of grease to avoid excessive wear and tear, gland packing as per requirement, complete assembly of pump set after carrying out necessary repairs. Complete job including cost of material and labour charges.
Providing & fitting of new CI coupling set by way of machining for keyway on either side of shaft (motor and pump side) as per sample by way of resizing of holes. Job also includes Providing and fitting of new coupling nuts/bolts & rubber bushes. Complete job including cost of material and labour charges.
Modification of suction pipes 200mm dia. Of pumping unit no. 1 & 2 by way of dismantling of the already fitted M.S pipe of 200mm dia. From the flanges and cutting of the damaged rusted nuts/bolts with the help of gas cutter at LIS Dai Chak. Extraction of existing suction pipes 200mm dia. Along with foot valves of pumping unit no. 1 and 2 one by one from the running water of Nullah with the help of chain pulley block and manual labour, cutting of the 200 dia. Foot valve nut/bolts from the suction pipes with the help of gas cutter. Cutting the pieces of the suction pipes approx.3ft form each pipe of both units with the help of gas cutter and fabrication with the help of electric welding as per site requirement. Providing/fitting of 4no.s 200mm dia. Flanges to the suction pipe of 200mm dia. Of both units by way of welding the flanges to the suction pipes. Fitting and proper aligning of the suction lines using new nuts, bolts and rubber gasket. Also repairs to 200mm dia. Foot valves of pumping unit No. 1&2 installed at LIS Dai Chak. The job includes extraction of foot valves from the sump after disengaging from the suction pipes and carrying to the workshop for repairs through head load/manual labour and mechanical transport. Complete dismantling of foot valves and replacement of leather washer. Cleaning foot valves properly along with strainers, adjustment of flaps by adjusting and repairing to hinge arrangements. Reassembling the foot valves. Reassembling the foot valves and refitting it with suction pipes in the sump by providing/fitting of new rubber insulation sheets to all flanged joints and nuts, bolts. Complete job include cost on account of material used, carriage & hire charges of tools & tackles and labour charges at site. The job includes hire charges of tools, tackles, chain pulley block, gas welding set, electric welding set & transportation charges, skilled & unskilled labour charges. The job also includes the cost of material, consumable rubber gaskets etc.
Dismantling of the 30H.P starters of both pumping units from the existing damaged wooden frame with the help of suitable tools & tackles and erecting them at a convenient place on the wall inside the pump room. The job includes fabrication of suitable angle iron frames as per the size of the starters and main switch. The starters should be bolted/fitted on these fabricated M.S angle iron frames and which are to be properly grouted on the wall at a suitable place inside the pump room. The job includes cost of material, labour charges and all types of carriages involved and hire charges of welding set, tools and tackles required for the job. Also Providing and fitting of HRC main switch 200 amps. Of standard quality in place of damaged one at LIS Dai Chak. The main switch should be bolted on a fabricated M.S angle frame and the stand should be properly grouted on the wall at suitable place inside the pump room. The job includes cost of material labour charges and all types of carriages involved and hire charges of tools and tackles required for the job. Complete Job
Repairs/replacement of materials to electric system of pump room building inside and around by way of removing damaged/burnt wires, switches, lights, batten holders, sockets, fuses, MCB etc. Providing/fitting of new material of standard quality including wires, switches, boards etc. as per site requirement. P/F of 5no.s light points along the path way in and around the pump room. P/F of new batten holders, 5no.s LED bulbs, sockets, fuses in place of damaged one. Job includes carriage charges, hire charges of tools & tackles required, cost of skilled/semi-skilled labour, cost of materials and allied works. Complete Job
Rebate on account of old parts
Repair/replacement of worn out parts of pumping unit-I along with allied works at LIS Datriyal
Decoupling of 03 cusec Horizontal casing pump of unit no.1 of LIS Datriyal from the motor assembly and dismantling the pump from the base frame. Carriage of the dismantled 03 cusec Horizontal casing pump set, to the nearest roadside, using manual labour, head load to nearest road side, loading in transport vehicle, carriage to the workshop in the Mechanical transport for repairs, re-assembling at workshop and then back carriage to the LIS after carrying out necessary repairs. Fitting/reinstallation at the base frame and testing on part/full load at site.
Repair of 03 cusec Split casing pump set (unit I) at workshop by way of dismantling for extraction of damaged internal parts. Replacement of damaged pump shaft with new pump shaft by way of turning & finishing to accurate size, threading at ends and making of new key way. Repair to impeller by way of brazing, turning and finishing to accurate size including making of new key way of the same size and specifications. Providing and fitting of new bush- 02 Nos. , new check nuts, new gland rings-02 nos., new bearings as per sample, new studs/bolts on it, applying sufficient amount of grease to avoid excessive wear and tear, gland packing as per requirement, complete assembly of pump set after carrying out necessary repairs. Complete job including cost of material and labour charges.
Providing & fitting of new CI coupling set by way of machining for keyway on either side of shaft (motor and pump side) as per sample by way of resizing of holes. Job also includes Providing and fitting of new coupling nuts/bolts & rubber bushes. Complete job including cost of material and labour charges.
Dismantling of the damaged 20 H.P electric motor of Pumping unit no-I from base frame, pump & motor starter electrical connections. Repairs to rotor of motor by P/F of new bearings ( DE & NDE ) after rebuilding of the rotor shaft and finishing to bearing sizes, making new keyway for coupling , P/F of bearing end cover plates. Complete greasing of the bearing, P/F of side strainers. Complete job including cost of material and labour charges.
Rebate on account of old parts
TRIKUTA ELECTRICAL AND MECHANICAL WORKS
BEE AAR ENTERPRISES
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .