Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹19.1 LAdmitted-Fee/PreQual/Technical/Finance | -22.50% | ₹19.1 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹20.2 L+₹1.1 L (5.82%)Admitted-Fee/PreQual/Technical/Finance AZAD NAGAR SAHEBGANJ | -17.99% | ₹20.2 L+₹1.1 L (5.82%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹24.7 L
EMD Value
₹50,000
Closing Date
18 Jul 2026, 5:00 pmClosed
E.E. R.D.Spl. Division, Sahibganj
E.E. R.D.Spl. Division, Vikas bhawan, Sahibganj
Construction of RCC drain with cover slab in R and R Colony Par-1, At- Paltanganj, Sahibganj
2026_RDSPL_116020_1
RDSpl/SAHIBGANJ/02/2026-27 GR01
Open Tender
Civil Works
Percentage
180 days
At- Paltanganj, Sahibganj
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
₹50,000
21 Jul 2026
9 Jul 2026
20 Jul 2026
9 Jul 2026
18 Jul 2026
9 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation in foundation trenches in ordinary soil do …....E/I | 165.68 | M3 | 151.82 | ₹25,153.54 |
| 2 | Providing coarse clean sand in filling in foundation trenches or in plinth do……E/I | 16.57 | M3 | 589.51 | ₹9,768.18 |
| 3 | Providing designation 75B one brick flat soling joints filled with local sand including cost of watering taxes royalty all complete as per building specification and direction of E/I. | 217.47 | M2 | 330.34 | ₹71,839.04 |
| 4 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centering, shuttering and finishing: - All work up to plinth level (1:1.5:3) all complete as per building specification and direction of E/I. | 143.59 | M3 | 5,218 | ₹7,49,252.62 |
| 5 | Centering and shuttering including strutting ,proping of walls (any thickness) including attached pilaster butteresses plinth and string courses etc. | 579.93 | M2 | 372.72 | ₹2,16,151.51 |
| 6 | Centering and shuttering including strutting ,proping in foundation and footing etc. | 72.49 | M2 | 194.5 | ₹14,099.3 |
| 7 | Providing tor steel reinforcement in cover slab including c/b/b E/I. | - | MT | 82,096.54 | - |
| 8 | Add carriage of material
Brick | 1 | Nos | 1,052.8 | ₹1,051.75 |
| 9 | Sand | 78.18 | M3 | 1,041.88 | ₹81,454.18 |
| 10 | Stone Chips | 123.21 | M3 | 372.28 | ₹45,868.62 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.23 MB
BOQ_156852.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .