Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹77,600Accepted-Finance | L1 | Accepted-Finance Lowest Rate | |
| 2 | L2₹1.1 L+₹30,400 (39.2%)Accepted-Finance NOT AVAILABLE | L2 | Accepted-Finance Rates on higher side | |
| 3 | L3₹1.1 L+₹37,015 (47.7%)Accepted-Finance BHAGWATI NAGAR JAMMU | L3 | Accepted-Finance Rates on higher side | |
| 4 | L4₹1.1 L+₹37,050 (47.7%)Accepted-Finance | L4 | Accepted-Finance Rates on higher side |
Tender Value
₹1.1 L
EMD Value
₹2,250
Closing Date
4 Aug 2020, 4:00 pmClosed
Executive Engineer MICD jammu
Office of Executive Engineer MICD jammu
Replacement of damaged foot valve, Reflux valve, 37/16 Cu Cables and other allied works at LIS MIARI of MICSD Jammu
2020_IFC_101166_1
MICD/04 Dtd 24-07-2020
Open Tender
Machineries/ Mechanical Engg Items
Lump-sum
11 days
Miari Akhnoor
Please refer Tender documents.
8 documents required · 8 mandatory
₹300
Executive Engineer MICD jammu
₹2,250
Yes
Office of Executive Engineer MICD jammu
19 Sept 2020
25 Jul 2020
5 Aug 2020
25 Jul 2020
4 Aug 2020
27 Jul 2020
27 Jul 2020
Amount
Replacement of damaged foot valve, Reflux valve, 37/16 Cu Cables and other allied works at LIS MIARI of MICSD Jammu
Replacement to 1no.s 200mm dia. foot valves of pumping unit No.1 installed at LIS Miari. The job includes extraction of foot valves from the sump after disengaging from the installed suction pipes and then providing and fitting of the new foot valve in place of damaged one by way of fitting and aligning it with suction pipe in the sump with new nuts and bolts. Complete job include cost on account of material used, transportation charges, carriage & hire charges of tools & tackles and labour charges at site. Job also includes rebate on account of old parts/ material (complete job)
Dismantling of the damaged Reflux valve 150mm dia. from the delivery line. Replacing the old and damaged Reflux valve at site and Providing & fitting of new Reflux valve in place of damaged one on the delivery pipe by the way of providing/fitting of new nuts bolts and RI sheets. Complete job includes cost of material and labour charges. Job also includes rebate on account of old material/parts. (complete job)
Topping up of 250KVA voltage stabilizer installed at LIS Miari. The job involves the providing and filling of 100 litres of deficit oil in the voltage stabilizer by using the manual pump. Complete job includes cost on account of material, transportation charges skilled and semi-skilled labour required for the job at LIS Miari. (complete job)
Providing/ fitting of 37/16 Copper cable at LIS Miari. The job involves disconnecting of damaged copper cable between L T Panel and Starter. Providing/fitting of 37/16 copper cable of reputed make from L T Panel to Starter by way of providing and fitting of suitable number and size of copper thimbles duly crimped with the copper cable ends, insulation tape roll, cotton tape rolls etc. Job includes the cost of material, carriage and hire charges of material and tools and tackles required for the job, labour charges for skilled and semi skilled labour at site L.I.S. Job also includes rebate on account of old material . (complete job
N B Engineering and Electric Works
M/S FASTTRACK ENGINEERS
VERMA ELECTRICAL AND MECHANICAL WORKS
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .