Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹60.9 LAccepted-AOC AMBALA CANTT | 1 | Accepted-AOC OK | |
| 2 | 2₹71.6 L+₹8.3 L (13.1%)Rejected-Finance | 2 | Rejected-Finance DUE TO HIGHEST | |
| 3 | 3₹75.9 L+₹12.7 L (20.0%)Rejected-Finance 81 ARYA NAGAR ASSANDH ROAD PANIPAT HARYANA 132103 | PANIPAT | HARYANA | 132103 | 3 | Rejected-Finance DUE TO HIGHEST | |
| 4 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Others-Due to Similar job order not attached. |
Tender Value
Refer Docs
EMD Value
₹50,000
Closing Date
26 Oct 2023, 9:00 amClosed
M.D.
SUFAR MILLS ROHTAK
SUPPLY AND REPLACEMENT OF PVC WATER DISPOSAL PIPELINE MILL TO DRAIN NO 8
2023_HBC_322253_1
ROHTAKSUGAR Works /26.10.2023/02
Open Tender
Miscellaneous
Works
15 days
SUGAR MILLS ROHTAK
Please refer Tender documents.
2 documents required · 2 mandatory
₹100
₹50,000
6 Nov 2023
19 Oct 2023
26 Oct 2023
19 Oct 2023
26 Oct 2023
19 Oct 2023
Amount
Excavation of trench of required width for pipeline for depth upto 1500mm, as per HSR item no. 4.16.1.2
Stringing out PVC pipe and laying the same in trenches for 250mm dia pipeline as per HSR item no. 20.7.8
Jointing PVC pipes and specials, sockets, long bend, clamp etc.
Supply of PVC pipe 250mm dia, working pressure 9.5kg, schedule- 80, thickness- 15mm, make- Kasta/Supreme
PVC solvent 1kg
PVC connection clamp/ service seddle 10” x 1” heavy
C. I. air valve 1” heavy
A.K. CONTRACTOR
ANIL KUMAR CONTRACTOR
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .