Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹8.5 LAccepted-AOC | ₹8.5 L | 1 | Accepted-AOC Lower bid |
| 2 | 2₹8.5 LSame as 1Rejected-Finance | ₹8.5 LSame as 1 | 2 | Rejected-Finance Higher bid |
| 3 | 2₹8.5 LSame as 1Rejected-Finance | ₹8.5 LSame as 1 | 2 | Rejected-Finance Higher bid |
| 4 | 2₹8.5 LSame as 1Rejected-Finance | ₹8.5 LSame as 1 | 2 | Rejected-Finance Higher bid |
| 5 | 2₹9.4 L+₹93,218.63 (11.0%)Rejected-Finance | ₹9.4 L+₹93,218.63 (11.0%) | 2 | Rejected-Finance Higher bid |
Tender Value
₹8.5 L
EMD Value
₹8,474
Closing Date
4 Apr 2026, 5:30 pmClosed
EXECUTIVE OFFICER,JATNI MUNICIPALITY
EXECUTIVE OFFICER,JATNI MUNICIPALITY
Construction of One Community Hall near Central School in Ward no-1
2026_ORULB_127179_24
EO/JMC/089/2025-26
Open Tender
Civil Works - Others
Percentage
EXECUTIVE OFFICER, JATNI MUNICIPALITY
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,000
₹8,474
Yes
5 Aug 2026
23 Mar 2026
6 Apr 2026
23 Mar 2026
4 Apr 2026
23 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1road work | |||||
| 1.01 | Earth work in excavation of foundation in hardsoil within initial lead & lift including foundation dressing & levelling etc comp. | - | cum | 1 | - |
| 1.02 | Filling in foundation & plinth with sand watered & rammed (labour only) | - | cum | - | - |
| 1.03 | Cement concrete (1:4:8) with 40 mm size hard granite metal Columns | 1 | cum | - | - |
| 1.04 | Fly Ash brick masonary in cm (1:6) in foundation and plinth | 1 | cum | 1 | ₹1 |
| 1.05 | fly ash brick masonary in cm (1:6) in super structure etc. | 1 | cum | 1 | ₹1 |
| 1.06 | RCC M20 using 20mm & 10 mm size hard granite chips for RCC works including hoisting & lying etc | 1 | cum | 1 | ₹1 |
| 1.07 | Rigid & smooth centering & shuttering for RCC work including false work and dismentaling then after casting including cost of materials complete in ground floor A) for column base & plinth bend | 1 | sqm | 1 | ₹1 |
| 1.08 | B) for RCC lintel | - | sqm | 1 | - |
| 1.09 | C) for column & beam | 1 | sqm | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_585901.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 7.18 MB
BOQ_585901.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .