| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical Responsive |
| 2 | Accepted-Technical S O TSETAN DORJAY R O SKAMPUK | Accepted-Technical Responsive |
Tender Value
₹35.9 L
EMD Value
₹84,740
Closing Date
2 May 2026, 2:00 pmClosed
Executive Engineer PWD RnB Nubra
Executive Engineer PWD RnB Nubra
Construction of internal road to Skampuk, by way of R/wall, Z/wall and Side drain etc. (under District Capex)
2026_PWD_18749_1
06 of PWD RnB Nubra 2026-27
Open Tender
Civil Works - Others
Percentage
60 days
Nubra
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,000
Executive Engineer PWD RnB Nubra.
₹84,740
1 Jul 2026
10 Apr 2026
4 May 2026
11 Apr 2026
2 May 2026
11 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts,wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres. a)All kinds of soil @80% | - | Cum | - | - |
| 2 | b) Ordinary Rock @20% | - | Cum | - | - |
| 3 | Dry stone pitching (any thickness) excluding cost of stones. On Horizontal | - | Cum | - | - |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) from natural source crushed aggregate. | - | Cum | - | - |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 gradedstone aggregate 40 mm nominal size derived from natural sources) | - | Cum | - | - |
| 6 | Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with : Cement mortar 1:6 (1 cement : 6 coarse sand) | - | Cum | - | - |
| 7 | Random rubble masonry with hard stone laid dry in foundation, plinth & walls Laid with bond stone. | - | Cum | - | - |
| 8 | Random rubble masonry with hard stone laid with mud mortar . | - | Cum | - | - |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form work for : Foundations, footings, bases for columns | - | Sqm | - | - |
| 10 | Providing and laying damp-proof course 50mm thick with cement concrete 1:2:4 (1 cement : 2 coarse sand(zone-III) : 4 graded stone aggregate 20mm nominal size) | - | Sqm | - | - |
stage.html
html • 0.02 MB
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.93 MB
BOQ_44842.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .