| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹5.1 LAccepted-Finance 0 MATADIN KAKRAHI KAKRAHI BHARTHANA ETAWA ETAWAH UTTAR PRADESH 206242 | ETAWAH | UTTAR PRADESH | 206242 | ₹5.1 L | L-1 | Accepted-Finance accepted |
| 2 | L-2₹5.4 L+₹26,482.50 (5.16%)Rejected-Finance ELECTRICAL CO HPSEG LTD KEYLONG L GS HP 175132 | LAHUL AND SPITI | HIMACHAL PRADESH | 175132 | ₹5.4 L+₹26,482.50 (5.16%) | L-2 | Rejected-Finance rejected |
| 3 | L-3₹5.7 L+₹51,946.50 (10.1%)Rejected-Finance JOGINDER NAGAR | ₹5.7 L+₹51,946.50 (10.1%) | L-3 | Rejected-Finance rejected |
| Sl No | Description | Qty | Unit | Sanjeev Kumar L1 | SHER SINGH L2 | AMIT KUMAR L3 |
|---|---|---|---|---|---|---|
| 1.00 | Excavation in foundations, trenches etc., in earth work, lift upto 1.50 mts.stacking the excavated soil not more than 3 metres clear from the edge of excavation & returning the stacked soil in 15 cm.layers,when required into plinths sides of foundations etc.conslidating each depositrd layer by ramming & watering & then disposing of all surplus excavated earth as directed within a lead of 20 metres complete in all respect as per entire satisfaction of Engineer in Charge. | 43.8 | Cum | 570 ₹24,966 Lowest | 590 ₹25,842 | 610 ₹26,718 |
| 2.00 | Demolition above G.L upto floor two level including stacking of erviceable material and disposal of unserviceable material within 50 metres lead as per direction of engineer in charge. disposal of unseviceable materials within 20 metres lead and including cutting the road necessary reinforcement and separating out from R.C.C/ R.B Work in all respect as per direction and to the entire satisfaction of Engineer-in-Charge. | 40.2 | Cum | 1,490 ₹59,898 Lowest | 1,500 ₹60,300 | 1,550 ₹62,310 |
| 3.00 | Prov.and lying cement concrete 1:4:8(1Cement: 4 Sand:8 Graded stone agg.40mm nominal size)& curing complete excluding cost of form work in foundation and plinth as per direction & to the entire satisfaction of the Engineer-in-Charge. | 3.9 | Cum | 7,300 ₹28,470 Lowest | 7,400 ₹28,860 | 7,500 ₹29,250 |
| 4.00Providing and laying cement concrete 1 : 1.5 :3 (1 cement :1.5 sand :3 graded stone aggregate 20 mm nominal size) and curing complete excluding cost of form work and reinforcemnt for reinforced concrete work complete in all respect with in all leads and lifts as per the direction and to the entire satisfaction of Engineer-in-Charge . | ||||||
| 4.01 | Foundation and plinth complete as per the direction and to the entire satisfaction of the Engineer-in-Charge. | 6.15 | Cum | 9,500 ₹58,425 Lowest | 10,000 ₹61,500 | 10,500 ₹64,575 |
| 4.02 | Walls (any thickness but not less than 0.10m thickness) attached pillaster, buttresses, plinth & string courses etc from top of foundaation level upto floor two level as per the direction & to the entire satisfaction of the Engineer-in-Charge. | 7.35 | Cum | 9,700 ₹71,295 Lowest | 9,800 ₹72,030 | 9,900 ₹72,765 |
| 5.00Providing and laying cement concrete 1 : 2 : 4 ( 1 cement : 2 sand : 4 graded stone aggregate 20 mm nominal size) and curing complete excluding cost of form work and reinforcement for reinforced cement concrete work complete as per direction & to the entire satisfaction of the Engineer-in-Charge. in :- | ||||||
| 5.01 | In suspended floor roofs ,landing and shelves and their support.balconies , beams,girders, bressumers and contilever up to floor two level | 2.1 | Cum | 9,300 ₹19,530 Lowest | 9,400 ₹19,740 | 9,500 ₹19,950 |
| 6.00 | Providing mild steel / tor steel reinforcement for reinforced cement concrete work including bending, binding and placing in position complete upto floor two level complete in all leads and lifts and as per the direction and to the entire satisfaction of the Engineer-in-Charge. Tor Steel. | 1,014 | Kg | 95 ₹96,330 Lowest | 100 ₹1,01,400 | 110 ₹1,11,540 |
| 7.00Prov.form work with steel plates 3.15mm thick welded with angle iron frame 30 x 30 x 5mm so as to give a fair finish including centring, shuttering,strutting & propping etc. with wooden battens and ballies, height of propping & centering below supporting floor to ceiling not exceeding 4mtr.& removal of same for insitu rainforceed concrete and plain concrete work complete in all leads and lifrs and as per the directioin and to the entire satisfaction of the Engineer-in-Charge :- | ||||||
Tender Value
₹4.9 L
EMD Value
₹9,746
Closing Date
8 Apr 2026, 5:00 pmClosed
EE Rampur
JSD Rampur
Restoration of Rain damages to Sewerage scheme Rampur Town
2026_HPIPH_133244_1
EE-JSD-RMP-E-Ten/25-17401-50 dt 31.03.2026
Open Tender
Civil Works
Item Rate
90 days
Rampur
Please refer Tender documents.
7 documents required · 7 mandatory
₹350
₹9,746
30 Jun 2026
2 Apr 2026
9 Apr 2026
2 Apr 2026
8 Apr 2026
2 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Excavation in foundations, trenches etc., in earth work, lift upto 1.50 mts.stacking the excavated soil not more than 3 metres clear from the edge of excavation & returning the stacked soil in 15 cm.layers,when required into plinths sides of foundations etc.conslidating each depositrd layer by ramming & watering & then disposing of all surplus excavated earth as directed within a lead of 20 metres complete in all respect as per entire satisfaction of Engineer in Charge. | - | Cum | - | - |
| - | Demolition above G.L upto floor two level including stacking of erviceable material and disposal of unserviceable material within 50 metres lead as per direction of engineer in charge. disposal of unseviceable materials within 20 metres lead and including cutting the road necessary reinforcement and separating out from R.C.C/ R.B Work in all respect as per direction and to the entire satisfaction of Engineer-in-Charge. | - | Cum | - | - |
| - | Prov.and lying cement concrete 1:4:8(1Cement: 4 Sand:8 Graded stone agg.40mm nominal size)& curing complete excluding cost of form work in foundation and plinth as per direction & to the entire satisfaction of the Engineer-in-Charge. | - | Cum | - | - |
| - | Providing and laying cement concrete 1 : 1.5 :3 (1 cement :1.5 sand :3 graded stone aggregate 20 mm nominal size) and curing complete excluding cost of form work and reinforcemnt for reinforced concrete work complete in all respect with in all leads and lifts as per the direction and to the entire satisfaction of Engineer-in-Charge . | - | - | - | - |
| - | Foundation and plinth complete as per the direction and to the entire satisfaction of the Engineer-in-Charge. | - | Cum | - | - |
| - | Walls (any thickness but not less than 0.10m thickness) attached pillaster, buttresses, plinth & string courses etc from top of foundaation level upto floor two level as per the direction & to the entire satisfaction of the Engineer-in-Charge. | - | Cum | - | - |
| - | Providing and laying cement concrete 1 : 2 : 4 ( 1 cement : 2 sand : 4 graded stone aggregate 20 mm nominal size) and curing complete excluding cost of form work and reinforcement for reinforced cement concrete work complete as per direction & to the entire satisfaction of the Engineer-in-Charge. in :- | - | - | - | - |
| - | In suspended floor roofs ,landing and shelves and their support.balconies , beams,girders, bressumers and contilever up to floor two level | - | Cum | - | - |
| - | Providing mild steel / tor steel reinforcement for reinforced cement concrete work including bending, binding and placing in position complete upto floor two level complete in all leads and lifts and as per the direction and to the entire satisfaction of the Engineer-in-Charge. Tor Steel. | - | Kg | - | - |
| - | Prov.form work with steel plates 3.15mm thick welded with angle iron frame 30 x 30 x 5mm so as to give a fair finish including centring, shuttering,strutting & propping etc. with wooden battens and ballies, height of propping & centering below supporting floor to ceiling not exceeding 4mtr.& removal of same for insitu rainforceed concrete and plain concrete work complete in all leads and lifrs and as per the directioin and to the entire satisfaction of the Engineer-in-Charge :- | - | - | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.89 MB
F6.pdf
Tender Documents • 0.66 MB
F8.pdf
Tender Documents • 1.09 MB
TC.pdf
Tender Documents • 0.15 MB
BOQ_197049.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .