Tender ID
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.3 CrAdmitted-Finance PLOT NO 46 SECTOR 19C GEOSTAR SADAN VASHI NAVI MUMBAI MAHARASHTRA 400703 | THANE | MAHARASHTRA | 400703 | L1 | Admitted-Finance | |
| 2 | L2₹6.4 Cr+₹1.0 Cr (19.4%)Admitted-Finance SHOP NO 2 KAMOTHE ANIRRUDHA HEIGHT KAMOTHE PLOT NO 168 VILLAGE TOWN SECTOR 34 CITY NAVI MUMBAI RAIGAD MAHARASHTRA 410209 INDIA | RAIGAD | MAHARASHTRA | 410209 | L2 | Admitted-Finance | |
| 3 | L3₹7.6 Cr+₹2.3 Cr (43.1%)Admitted-Finance 402 MADHAVA PLOT NO C 4 E BLOCK BANDRA KURLA COMPLEX BANDRA EAST MUMBAI MAHARASHTRA 400051 | MUMBAI SUBURBAN | MAHARASHTRA | 400051 | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Coastal Marine Construction and Engineering Ltd L3 | S & R Geotechniques Pvt Ltd L2 | GEOSTAR SURVEYS INDIA PVT LTD L1 |
|---|---|---|---|---|---|---|
| 1.00 | Mobilization of hydraulically operated jack up platform, drilling rigs, other equipment and accessories and manpower for conducting Borehole Investigation using triple-tube core barrel in accordance with BS code or ASGM standards required for execution of work | 1 | LS | 2,00,00,000 ₹2,00,00,000 Lowest | 2,00,00,000 ₹2,00,00,000 Lowest | 3,08,91,137.73 ₹3,08,91,137.73 |
| 2.00 | Setting up of jack up platform on each offshore borehole location including positioning by using Differential Global Positioning System (DGPS) for conducting Borehole investigation with trible-tube core barrel upto a depth of (-)20m below seabed in the proposed area through all types of rock/soil. The cost inclusive of positioning of jack up platform in each borehole location, shifting of jack up platform after collection of samples and conducting required in-situ test during boring, from one borehole to another location, including erection and dismantling of rig and hire charges for necessary machineries / equipments required for drilling operation, labour materials for entire work and as per relevant IS codes etc., charges for men and machineries, required safety arrangements, Taxes etc., required to complete the work as per specification and as directed by the Departmental Officers. | 56 | Nos | 3,50,000 ₹1,96,00,000 | 1,70,000 ₹95,20,000 | 97,000 ₹54,32,000 Lowest |
| 3.00 | Setting up of jack up platform on each offshore borehole location including positioning by using Differential Global Positioning System (DGPS) for conducting Borehole investigation with trible-tube core barrel upto a depth of (-)40m below seabed in the proposed area through all types of rock/soil. The cost inclusive of positioning of jack up platform in each borehole location, shifting of jack up platform after collection of samples and conducting required in-situ test during boring, from one borehole to another location, including erection and dismantling of rig and hire charges for necessary machineries / equipments required for drilling operation, labour materials for entire work and as per relevant IS codes etc., charges for men and machineries, required safety arrangements, Taxes etc., required to complete the work as per specification and as directed by the Departmental Officers. | 14 | Nos | 7,50,000 ₹1,05,00,000 | 3,00,000 ₹42,00,000 | 2,10,000 ₹29,40,000 Lowest |
| 4.00 | Setting up necessary equipment on each onshore borehole location including positioning by using Differential Global Positioning System (DGPS) for conducting Borehole investigation with trible-tube core barrel upto a depth of (-)20m with respect to ground level in the proposed area through all types of rock/soil. The cost inclusive of positioning of jack up platform in each borehole location, shifting of jack up platform after collection of samples and conducting required in-situ test during boring, from one borehole to another location, including erection and dismantling of rig and hire charges for necessary machineries / equipments required for drilling operation, labour materials for entire work and as per relevant IS codes etc., charges for men and machineries, required safety arrangements, Taxes etc., required to complete the work as per specification and as directed by the Departmental Officers. | 45 | Nos | 90,000 ₹40,50,000 | 75,000 ₹33,75,000 | 50,000 ₹22,50,000 Lowest |
| 5.00 | Setting up necessary equipment on each onshore borehole location including positioning by using Differential Global Positioning System (DGPS) for conducting Borehole investigation with trible-tube core barrel upto a depth of (-)40m with respect to ground level in the proposed area through all types of rock/soil. The cost inclusive of positioning of jack up platform in each borehole location, shifting of jack up platform after collection of samples and conducting required in-situ test during boring, from one borehole to another location, including erection and dismantling of rig and hire charges for necessary machineries / equipments required for drilling operation, labour materials for entire work and as per relevant IS codes etc., charges for men and machineries, required safety arrangements, Taxes etc., required to complete the work as per specification and as directed by the Departmental Officers. | 12 | Nos | 1,60,000 ₹19,20,000 | 1,35,000 ₹16,20,000 | 1,20,000 ₹14,40,000 Lowest |
| 6.00 | Conducting In-situ tests, Collection of samples through boring 150mm dia boreholes upto (-)20m below existing seabed / ground level through all type of soil / rock including conducting field test such as standard penetration test (SPT), and other in-situ tests, collection of undisturbed soil samples through rotary core drilling with a tribel-tube core barrel. The cost inclusive of collection of undisturbed samples, conducting SPT, Provision of core boxes for preserving the sample, other in-situ tests as detailed in Annexure-1, hire charges for men and machineries required for complete the work as per standard specifications and as directed by departmental officers. | 1 | LS | 64,66,600 ₹64,66,600 | 99,90,900 ₹99,90,900 | 36,07,500 ₹36,07,500 Lowest |
| 7.00 | Conducting laboratory tests in soil/rock and Preparation & submission of Geo-technical Investigation Reports along with procedures adopted for investigation, field Observations, summarized test data, conclusion and recommendations etc., as per relevant IS Codes etc., and as directed by the Departmental Officers. | 1 | LS | 13,53,000 ₹13,53,000 | 12,40,000 ₹12,40,000 | 4,71,000 ₹4,71,000 Lowest |
| 8.00 | Conducting offshore geophysical survey for an area of 10 sq.km | 1 | LS | 91,00,000 ₹91,00,000 | 1,03,50,000 ₹1,03,50,000 | 53,04,240 ₹53,04,240 Lowest |
| 9.00 | Demobilization of hydraulically operated jack up platform, drilling rigs, other equipment and accessories and manpower for execution of work. | 1 | LS | 35,00,000 ₹35,00,000 | 35,00,000 ₹35,00,000 | 11,01,667 ₹11,01,667 Lowest |
Tender Value
₹6.8 Cr
EMD Value
₹13.6 L
Closing Date
5 Oct 2026, 3:00 pmClosed
Chief Engineer, VOCPA
Chief Engineer VOCPA Tuticorin 628004
Conducting Borehole Investigation (Onshore, Offshore) and offshore geophysical surveys in the proposed Shipbuilding yard site near V.O.Chidambaranar Port, Tuticorin
2026_VOCPT_290684_1
No.03/E(C)/F. 79/PD/Boreholes/2026-27/D.3154
Open Tender
Civil Works
Item Rate
210 days
Tuticorin
Please refer Tender documents.
17 documents required · 17 mandatory
₹0
₹13.6 L
Yes
Virtual
16 Oct 2026
11 Sept 2026
6 Oct 2026
11 Sept 2026
5 Oct 2026
11 Sept 2026
18 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Mobilization of hydraulically operated jack up platform, drilling rigs, other equipment and accessories and manpower for conducting Borehole Investigation using triple-tube core barrel in accordance with BS code or ASGM standards required for execution of work | 1 | LS | - | - |
| 2 | Setting up of jack up platform on each offshore borehole location including positioning by using Differential Global Positioning System (DGPS) for conducting Borehole investigation with trible-tube core barrel upto a depth of (-)20m below seabed in the proposed area through all types of rock/soil. The cost inclusive of positioning of jack up platform in each borehole location, shifting of jack up platform after collection of samples and conducting required in-situ test during boring, from one borehole to another location, including erection and dismantling of rig and hire charges for necessary machineries / equipments required for drilling operation, labour materials for entire work and as per relevant IS codes etc., charges for men and machineries, required safety arrangements, Taxes etc., required to complete the work as per specification and as directed by the Departmental Officers. | 56 | Nos | - | - |
| 3 | Setting up of jack up platform on each offshore borehole location including positioning by using Differential Global Positioning System (DGPS) for conducting Borehole investigation with trible-tube core barrel upto a depth of (-)40m below seabed in the proposed area through all types of rock/soil. The cost inclusive of positioning of jack up platform in each borehole location, shifting of jack up platform after collection of samples and conducting required in-situ test during boring, from one borehole to another location, including erection and dismantling of rig and hire charges for necessary machineries / equipments required for drilling operation, labour materials for entire work and as per relevant IS codes etc., charges for men and machineries, required safety arrangements, Taxes etc., required to complete the work as per specification and as directed by the Departmental Officers. | 14 | Nos | - | - |
| 4 | Setting up necessary equipment on each onshore borehole location including positioning by using Differential Global Positioning System (DGPS) for conducting Borehole investigation with trible-tube core barrel upto a depth of (-)20m with respect to ground level in the proposed area through all types of rock/soil. The cost inclusive of positioning of jack up platform in each borehole location, shifting of jack up platform after collection of samples and conducting required in-situ test during boring, from one borehole to another location, including erection and dismantling of rig and hire charges for necessary machineries / equipments required for drilling operation, labour materials for entire work and as per relevant IS codes etc., charges for men and machineries, required safety arrangements, Taxes etc., required to complete the work as per specification and as directed by the Departmental Officers. | 45 | Nos | - | - |
| 5 | Setting up necessary equipment on each onshore borehole location including positioning by using Differential Global Positioning System (DGPS) for conducting Borehole investigation with trible-tube core barrel upto a depth of (-)40m with respect to ground level in the proposed area through all types of rock/soil. The cost inclusive of positioning of jack up platform in each borehole location, shifting of jack up platform after collection of samples and conducting required in-situ test during boring, from one borehole to another location, including erection and dismantling of rig and hire charges for necessary machineries / equipments required for drilling operation, labour materials for entire work and as per relevant IS codes etc., charges for men and machineries, required safety arrangements, Taxes etc., required to complete the work as per specification and as directed by the Departmental Officers. | 12 | Nos | - | - |
| 6 | Conducting In-situ tests, Collection of samples through boring 150mm dia boreholes upto (-)20m below existing seabed / ground level through all type of soil / rock including conducting field test such as standard penetration test (SPT), and other in-situ tests, collection of undisturbed soil samples through rotary core drilling with a tribel-tube core barrel. The cost inclusive of collection of undisturbed samples, conducting SPT, Provision of core boxes for preserving the sample, other in-situ tests as detailed in Annexure-1, hire charges for men and machineries required for complete the work as per standard specifications and as directed by departmental officers. | 1 | LS | - | - |
| 7 | Conducting laboratory tests in soil/rock and Preparation & submission of Geo-technical Investigation Reports along with procedures adopted for investigation, field Observations, summarized test data, conclusion and recommendations etc., as per relevant IS Codes etc., and as directed by the Departmental Officers. | 1 | LS | - | - |
| 8 | Conducting offshore geophysical survey for an area of 10 sq.km | 1 | LS | - | - |
| 9 | Demobilization of hydraulically operated jack up platform, drilling rigs, other equipment and accessories and manpower for execution of work. | 1 | LS | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.17 MB
Technicalbid.pdf
Tender Documents • 1.65 MB
BOQ_339041.xls
BOQ • 0.26 MB
Corrigendum6.pdf
PDF • 0.10 MB
Corrigendum5.pdf
PDF • 0.10 MB
Corrigendum4.pdf
PDF • 0.15 MB
Corrigendum3.pdf
PDF • 0.11 MB
Corrigendum2.pdf
PDF • 0.52 MB
Corrigendum1.pdf
PDF • 0.15 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .