Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹61.1 LAccepted-AOC | ₹61.1 L | 1 | Accepted-AOC Agreement done as per attached letter. |
| 2 | 2₹62.3 L+₹1.2 L (1.94%)Rejected-Finance | ₹62.3 L+₹1.2 L (1.94%) | 2 | Rejected-Finance BEING L2 |
| 3 | 3₹64.8 L+₹3.6 L (5.96%)Rejected-Finance | ₹64.8 L+₹3.6 L (5.96%) | 3 | Rejected-Finance BEING L3 |
| 4 | 4₹64.9 L+₹3.8 L (6.16%)Rejected-Finance | ₹64.9 L+₹3.8 L (6.16%) | 4 | Rejected-Finance BEING L4 |
| 5 | 5₹65.0 L+₹3.9 L (6.35%)Rejected-Finance | ₹65.0 L+₹3.9 L (6.35%) | 5 | Rejected-Finance BEING L5 |
| Sl No | Description | Qty | Unit | MS A K MISHRA COTRACTOR L1 | SHUBHAM SONKESHARIYA L2 | SHRI BALAJI KRIPA COMPANY L9 | NIKHILAM TRADERS L10 | MS DEVA CONSTRUCTION AND MATERIAL SUPPLIERS L6 | K R Construction L5 | Jagmohan Patel L4 | NISHIKA CONSTRUCTION COMPANY L3 | SURYA CONSTRUCTION L8 | Uvaan Bhavya Constructions Pvt Ltd L7 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00On Turn Key Basis CONSTRUCTION OF 6.00 M. CHUTEFALL CUM WASTE WEIR АТ R.D. 10.00 M. U/S OF SPILL CHANNEL OF SUREHALI TANK PROJECT | |||||||||||||
| 1.01 | On Turn Key Basis CONSTRUCTION OF 6.00 M. CHUTEFALL CUM WASTE WEIR АТ R.D. 10.00 M. U/S OF SPILL CHANNEL OF SUREHALI TANK PROJECT including commissioning, operation and maintenance of 2 years on turnkey basis as per scope of work comprising of :-. The work comprising of planning, survey, geological investigations, drawing, design, estimation and clubbing of all components, getting approval from competent authority, fixing of BM of size 0.30 m x 0.45 m (0.15 m above ground level) at every 100 m., with writing of bench mark value on top & writing of RD wise location at structure on upstream and downstream and downstream face wall, writing bench mark value at parapet of structure, Supervision of all type of works, taking measurements, preparation of bills and establishment of quality control Unit at site during construction of work monitoring and implementation of all activities of the contractor. After commissioning, trial run, running, testing, operation and maintenance of Structue and Spill Channel 24 months including two rabi season. | 1 | Nos | 61,11,000 ₹61,11,000 Lowest | 62,29,400 ₹62,29,400 | 69,86,250.7 ₹69,86,250.7 | 72,01,993 ₹72,01,993 | 65,68,180.9 ₹65,68,180.9 | 64,99,000 ₹64,99,000 | 64,87,290 ₹64,87,290 | 64,75,500 ₹64,75,500 | 69,08,000 ₹69,08,000 | 67,14,179 ₹67,14,179 |
Tender Value
₹80.1 L
EMD Value
₹80,100
Closing Date
21 Jul 2025, 5:30 pmClosed
E.E. WRD. Mandla
E.E. WRD. Mandla
Construction of Chute fall cum waste weir at RD 10m. up stream of spill channel of Surehali Tank Project
2025_WRD_432779_1
1162/2025-26/Einc/Etendering/ dt. 24-06-2025
Open Tender
Civil Works - Others
Turn-key
365 days
Mandla
Please refer Tender documents.
6 documents required · 6 mandatory
₹10,000
₹80,100
11 Nov 2025
1 Jul 2025
23 Jul 2025
1 Jul 2025
21 Jul 2025
3 Jul 2025
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .