Tender ID
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.1 LAccepted-Finance | L1 | Accepted-Finance Generally in order | |
| 2 | L2₹25.0 L+₹6.9 L (38.1%)Accepted-Finance TUTICORIN | TUTICORIN | TAMIL NADU | 626202 | L2 | Accepted-Finance Generally in order | |
| 3 | L3₹25.7 L+₹7.6 L (42.1%)Accepted-Finance NO 56 M BLOCK 9 TH STREET ANNA NAGAR EAST CHENNAI TAMIL NADU 600102 | CHENNAI | TAMIL NADU | 600102 | L3 | Accepted-Finance Generally in order | |
| 4 | L4₹25.9 L+₹7.8 L (43.1%)Accepted-Finance | L4 | Accepted-Finance Generally in order | |
| 5 | L5₹26.5 L+₹8.4 L (46.6%)Accepted-Finance 2H 703 ANNAI THERESA NAGAR 2ND STREET TUTICORIN 628008 | TUTICORIN | TAMIL NADU | 628008 | L5 | Accepted-Finance Generally in order |
| Sl No | Description | Qty | Unit | SEETHALAKSHMI ENTERPRISES L4 | RELIABLE ENGINEERS L5 | Itajai Marine Engineering Services L3 | Ramesh Enterprises L2 | V NARAYANAN L1 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Sweeeping and Mopping of the office (flooring with Ceramic / marble / granite tiles) steps, staircases, handrails with scented cleaning agents including clearing and disposal of waste papers daily, Dusting and cleaning of files records in racks, furnitures for twice in a week, cleaning of all partition walls, ceiling [Brick, Wooden & Aluminium, Glazed], Staircase, handrails, doors, windows, blinds, Name boards, Electrical fitting viz. TubeLights,Fans, Electrical fixtures, switch boxes etc, removal of cobweb once in a month collecting and disposing all the waste to outside of the Office complex, with all general cleaning inside the office floors etc... complete as directed by the Engineer at site including the cost of all labour, labour uniforms, Lead, Lift, T&P, cost of all consumable materials such as cleaning powder, Broom sticks, Cobweb Sticks, bamboo basket, Swabs,Mobs, dungry Cloth, Buckets ,Cost of all Consumables etc complete. (To be carried out in all working days) | 70,912 | Sqm | 0.5 ₹35,456 Lowest | 1.05 ₹74,457.6 | 1 ₹70,912 | 0.94 ₹66,657.28 | 0.54 ₹38,292.48 |
| 2.00 | Sweeping and mopping of the office lobby such as Cash collection center (Flooring with ceramic / marble / granite tiles) steps,staircases, handrails with scented cleaning agents including clearing and disposal of waste papers and debris daily, cleaning of all partition walls, ceilings [Brick, Wooden & Aluminum, Glazed],Staircase, hand rails, doors, windows, blinds, Name boards,Electrical fittings viz. Tube Lights, fans, Electrical fixtures, switch boxes etc, removal of cobweb once in a month collecting and disposing all the waste to outside of the Office complex, with all general cleaning inside the office Floors etc… complete as directed by the Engineer at site including the cost of all labour, labour uniforms, lead, lift, T&P, cost of all consumable materials such as cleaning powder, Broom sticks, Cobweb sticks, Bamboo baskets, Swabs, Mops, Dungry cloths, Buckets, cost of all consumables etc. complete. (To be carried out in all working days) | 3,20,180 | Sqm | 0.58 ₹1,85,704.4 | 1.05 ₹3,36,189 | 0.85 ₹2,72,153 | 0.65 ₹2,08,117 | 0.54 ₹1,72,897.2 Lowest |
| 3.00 | Sweeping and mopping of the office clear space, lobby such as Cash collection center, low roofed repair bay (Flooring with cement mortar) steps,staircases, handrails with scented cleaning agents including clearing and disposal of waste papers and debris daily, cleaning of all partition walls, ceilings [Brick, Wooden & Aluminum, Glazed], Staircase, hand rails, doors, windows, blinds, Name boards,Electrical fittings viz. Tube Lights, fans, Electrical fixtures, switch boxes etc, removal of cobweb once in a month collecting and disposing all the waste to outside of the Office complex, with all general cleaning inside the office Floors etc… complete as directed by the Engineer at site including the cost of all labour, labour uniforms lead, lift, T&P, cost of all consumable materials such as cleaning powder, Broom sticks, Cobweb sticks, Bamboo baskets, Swabs, Mops, Dungry cloth, Buckets and cost of all consumables etc. complete. (Once in 3 Days) | 1,35,776 | Sqm | 0.58 ₹78,750.08 | 1.05 ₹1,42,564.8 | 0.65 ₹88,254.4 | 0.55 ₹74,676.8 | 0.54 ₹73,319.04 Lowest |
| 4.00 | Sweeping of open areas around Office buildings collection and removal of garbage and wastes from campus to outside office complex daily, all general outdoor cleaning with sprinkling of water, including removal of weeds and unwanted materials as directed by the Engineer at site including the cost of all labour, labour uniforms lead, lift, T&P, cost of all materials such as coconut brooms, Bamboo baskets,cost of all consumables etc.. (To be carried out all working days). | 37,77,548 | Sqm | 0.06 ₹2,26,652.88 Lowest | 0.14 ₹5,28,856.72 | 0.2 ₹7,55,509.6 | 0.23 ₹8,68,836.04 | 0.09 ₹3,39,979.32 |
| 5.00 | Storm water drain maintenace - Removal of earth, sand, silt, fly ash and other loose materials deposited under water in storm water drains using baskets /vessels, Spade and special tools as per site condition including disposing the same , rate including cost of labour, lead, lift, tools & tackles, transporting by tractor, loading & unloading etc., complete. (Cleaning shall be done one time during the period). | 1,940 | RM | 144 ₹2,79,360 | 4.3 ₹8,342 | 13 ₹25,220 | 10.1 ₹19,594 | 1.8 ₹3,492 Lowest |
| 6.00Maintenance charges for cleaning the wash basins, water closets, urinals and floor and wall tiles by spraying of disinfectant and placing camphor balls and urinal scented screen in the urinals and wash basins, sweeping and cleaning the floor surface and side wall surface, gratings, neatly cleaning the sanitary duct, removing dirt/refuge and cobwebs and sweeping away the stagnated water at periodic intervals, including carrying out of other miscellaneous works during lean hours as directed by the Engineer incharge including materials for cleaning except phenyl. The toilet should always be clean, neat and tidy without any odur or foul smell. | ||||||||
| 6.01 | Toilet floors ( includes cleaning ofwall tiles & doors / ventilators, removal of cobweb) | 30,870 | Sqm | 23 ₹7,10,010 | 2.3 ₹71,001 Lowest | 4 ₹1,23,480 | 3.42 ₹1,05,575.4 | 2.7 ₹83,349 |
| 6.02 | Water closets (IWC / EWC) | 5,460 | Opn | 17 ₹92,820 | 6.5 ₹35,490 | 12 ₹65,520 | 9.5 ₹51,870 | 4.5 ₹24,570 Lowest |
| 6.03 | Urinals cleaning & providing scented urinal screen, coloured naphthalene balls | 2,380 | Opn | 17 ₹40,460 | 5.8 ₹13,804 Lowest | 9.5 ₹22,610 | 7 ₹16,660 | 6.3 ₹14,994 |
| 6.04 | Washbasins | 6,020 | Opn | 17 ₹1,02,340 | 4.8 ₹28,896 | 8.25 ₹49,665 | 6.2 ₹37,324 | 4.5 ₹27,090 Lowest |
Tender Value
Refer Docs
EMD Value
₹22,900
Closing Date
18 Feb 2026, 2:00 pmClosed
Chief Engineer, Udangudi STPP-I.
Office of the Superintending Engineer, Civil, USTPP-I, Udangudi,628 203
Upkeeping of buildings on both the landside and Jetty side by Sweeping and mopping of floor area and operating Sewage treatment plant and cleaning of toilets, roads and drains at Captive Coal Jetty for Udangudi Supercritical Thermal Power Project- I
2026_EB_656892_1
CE/SE/C/USTPP-I/C.04/2025-2026
Open Tender
Civil Works - Others
Works
180 days
Captive Coal Jetty, Udangudi STPP-I
As per Tender Specification
7 documents required · 7 mandatory
₹0
₹22,900
Yes
4 Mar 2026
13 Feb 2026
19 Feb 2026
14 Feb 2026
18 Feb 2026
14 Feb 2026
stage.html
html • 0.05 MB
techsummary_787812.pdf
BOQ Comparative Chart
xlsx
finsummary_787812.pdf
cancelled_1.pdf
pdf • 0.04 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.39 MB
SPECC04.pdf
Tender Documents • 0.93 MB
BOQ_787812.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .