Tender Value
₹31 L
EMD Value
₹31,000
Closing Date
23 May 2023, 3:00 pmClosed
Block Development Officer (BP)
BDO Office, Yercaud Block
Salem District - Yercaud Block - Construction of Two Class Room Building in PUES School Nallur H/o Vellakadai - New School buildings (SIDS) - 2022-23
2023_RDTN_315178_1
Roc.No.64/2021/A2
Open Tender
Civil Works
Item Wise
120 days
BDO Office, Yercaud Block
As per tender Document
3 documents required · 3 mandatory
₹0
₹31,000
18 Jul 2023
15 May 2023
23 May 2023
15 May 2023
23 May 2023
15 May 2023
Amount
1.) Construction of Two Class room Building at Nallur P.U.E School H/O Vellakadai
Earth work Excavation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting, Sectioning the street to lay concrete pavement etc.,
Cement Concrete in 1 : 4 : 8 mix using 40 mm metal including cost and conveyance of all materials to site and labour charges etc complete
Filling with collected sand as per standard specifications etc complete
Refilling with excavated earth as per standard specifications etc complete
Brick work in cement Mortor 1:5 (One cement and five sand) using country Bricks of size 23 x 11.5 x 7.5 cms for the following including mixing mortar and all other labour charges etc complete.
Supplying and errecting shuttering including necessary support for plane surface in Foundation Basement and Roof slabs strutting upto 3.29 M height for plane surfaces for floors for RCC column footings columns plinth beam and connected with foundations grade beams, raft slabs stair case steps, bed blocks, critical pier, etc beams roof slabs, using mild steelsheets of size 90 x 60 cm and 10 gouge stiffened, welded with steel angles of size 25 mm x 25 mm x 3mm for boarding laid over silver oak (country wood) joists of 10 cm size x 6.5 cms size spaced at about 90 cms center to center and supported causorina props of 10 cm to 13 cms spaced at 75 cms to center to center etc., complete complying with standard specification and as directed (SI - 155) for column footing. (Footing)
Column and sunshade
R.C.C. 1:1.5:3-using 20mm ISS HBGS metal including cost and conveyance of materials and labour charges etc. complete
Supplying, fabricating and placing in position inild steel or ribbed tor steel and all reinforced cement Concrete works as per the design given including cost of steel and binding wire in all floors etc complete complying with Standard (MS rods or RTS rods) which will be supplied departmentally at section stores and cost will be recovered at issue rate. The binding wire shall be supplied by the Contractor.
Weathering course with brick jelly lime concrete in the proportion of 32:12.5 by volume including cost and conveyance of all and labour charges etc. complete.
Finishing the top of roof with one course of pressed tiles of size 20 X 20 X 2 mm laid in CM 1:3 12 mm thick mixes with W.P. compound laid 2 % weight of cement etc., complete.
Paving the floor Anti skid tiles of any colour and any size laid in CM 1:3, 20mm thick. And pointing with white cement 0.4 Kg per sqm mixed with colouring pigment to siut the colour of the tiles including finishing the joints neatly complying with the sta
Paving the floor with Paving the floor with kotta stone of size 610x610x 20mm in Cement mortar 1:3 etc., complete complying with standard specifications and as directed by the departmental officers.
Supply of steel doors including cost and convyance and all charges etc complete.etc complete (1.20x2..40m)
Supply of steel windows including cost and convyance and all charges etc complete.etc complete. (1.20x1.60m)
Plastering with C. M 1:5 mix, 12 mm thick including cost and conveyance of all materials to site and labour charges etc complete.
Plastering with cement mortar 1:3 mix to 10 mm thick including cost and conveyance of all materials to site and all labour charges etc complete.
Painting two coats over new iron work using synthetic enamal paint including cost and conveyance of all materials to site etc complete
Oil Distempering Two Coats over Plastering Surface including cost and conveyance of materials and labour charges etc complete
Painting two coats with approved Plastic Emulsion over one coat of Priming coat of Cement Paint over cement plastered wall surface, ceiling and other new surface including cleaning, preparing the surface, curing, scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers. (S.I No. 359 B) ( NEW SURFACE)
Supply and fixing of Cuddapah slab of 20/30mm thick including cost and conveyance and all charges etc complete.
Wiring with 2 X 1.5 Sq.mm (22 / 0.3) PVC insulated SC unsheathed Copper conducutor cable of 1100V grade in suitable PVC rigid pipe concealed in wall and ceiling with PVC accessories inflush with wall with 3 mm thick Hylum sheet cover with TW box And 5 A FT switch with continuous earth connection of 14 SWG TC wire for making good of the concealed portion with suitable colour for PVC concealed Light point / fan point (For electronic Regulator) SD23
Wiring with 2 X 1.5 Sq.mm (22 / 0.3) PVC insulated SC unsheathed Copper conducutor of 1100V grade in suitable PVC rigid pipe concealed in wall and ceiling with PVC accessories inflush with wall with 150 mm X 100 mm X 113 mm TW switch box with 3 mm thick Hylum sheet cover for 5 A 3 pin non interlocking CS plug with continuous earth wire connection of 14 SWG TC wire for making good of the concealed portion with suitable colour for concealed PVC plug point SD 36
Wiring with 2 X 1.5 Sq.mm (22 / 0.3) PVC insulated SC unsheathed Copper conducutor of 1100V grade in suitable PVC rigid pipe concealed in wall and ceiling with PVC accessories inflush with wall with 150 mm X 100 mm X 113 mm TW switch box with 3 mm thick Hylum sheet cover for 5 A 3 pin non interlocking CS plug with continuous earth wire connection of 14 SWG TC wire for making good of the concealed portion with suitable colour for concealed PVC plug point SD 38
Supply and run of 2 of 4.00 sq.mm (22/0.30) PVC insulated SC unsheathed copper Conductor of 1100 V grade on 7/20GI bearer wire for service connection mains SD 65
Supply and run of 2 of 4 Sqmm (56/0.3) PVC insulated SC unsheathed Cu.Conductor of 1100 v grade in 25mm dia GI Pipe (Class'B') Suitably bent at both ends with necessary angle iron upright and end supports for maints (SD.70)
Supply and fixing of TNEB meter Board suitable for 32A Three phase service connection with 32 A Fuse unit (500V) 32 A neutral link and earth ling (1"x1/8" Copper flat) on TW plank of size 600mm x 450mm x 19mm with supporting TW reepers of 1" thick an either side with painting with suitable bolt and nuts for fixing the TW plank on wall with earth connection and inter connection with 7/20 PVC insulated copper wire from EBV Meter to fues unit (SD.127)
Supply and fixing of single box type 4'-40W flourescent tube fitting with copper choke and condenser with TW round block on wall or ceiling with flourescent tube with PVC unsheathed copper leads from terminals to the fitting of Tube Light [SD 88 ]
Supply and fixing of 1200 mm ( 48") AC ceiling fan complete with stepped electronic 300 W regulator with 300 mm down rod on the existing clamp. SD 106
Supply and fixing of 8 way single pole and neutral MCB sheet steel enclosure distribution board with double door (metal) 1 No. 32A DP MCB as incoming and 6 Nos. 6A to 32A SPMCB outgoing in flush with wall and making good of the concealed portion with earth connection only. The MCB DB and MCB's should be with ISI mark (like standard make) SD. No.167
Provisions for drawing Bala painting including all cost and conveyance of men and materials etc.,(the colour and quality should be got approved by the Executive Engineer before use) the rate includes cost of brushes, high scaffolding charges, neat finishing, cost of brushes etc., complete complying with standard specification and as directed by the Departmental Officer
Provisions for Magnetic Green Fibre Board
Provisions for Fibre white writing Board(LR)
Provisions for String Bandal (LR)
Provisions for Chappal rack ( As per sub estimate) No:1
Brick Work in CM 1:5 mix using II Class Bricks including cost and conveyance of materials and labour charges etc complete. - 100.00 Cft
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
Supplying & fixing with cuddapah slabs 20-30mm thick for cup board thick and pointed with cement mortar 1:3 -10 Sqm
Exterior Emulsion two coats to the outside of the Building using best approved best quality of Ccement Paint including cost of Cement Paint, brushes,scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers. Rate for 10m2.for Out side of the Building (New Wall)
Provisions for Chappal rack ( As per sub estimate) No:2
Brick Work in CM 1:5 mix using II Class Bricks including cost and conveyance of materials and labour charges etc complete. - 100.00 Cft
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
Supplying & fixing with cuddapah slabs 20-30mm thick for cup board thick and pointed with cement mortar 1:3 -10 Sqm
Exterior Emulsion two coats to the outside of the Building using best approved best quality of Ccement Paint including cost of Cement Paint, brushes,scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers. Rate for 10m2.for Out side of the Building (New Wall)
Provisions for Pedestal for water tank No:1
Cement Concrete 1:4:8 (One Cement, Four M.Sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification
Brick work in CM 1:5 mix using country bricks ground moulded of size 22 x 11 x 7cm for the following including curing etc., complete complying with standard specifications.
Cost and Supply of Sand filling from approved quarry including cost and conveyance of all material etc completed
Plastering with CM 1:5, 12mm thick.in all floors including curing etc., complete complying with standard specifications and as directed by the departmental officers.
Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification.
Provisions for Pedestal for water tank No:2
Cement Concrete 1:4:8 (One Cement, Four M.Sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification
Brick work in CM 1:5 mix using country bricks ground moulded of size 22 x 11 x 7cm for the following including curing etc., complete complying with standard specifications.
Cost and Supply of Sand filling from approved quarry including cost and conveyance of all material etc completed
Plastering with CM 1:5, 12mm thick.in all floors including curing etc., complete complying with standard specifications and as directed by the departmental officers.
Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification.
Provisions for Rain water harvesting structure No.1
Earth work Excavation for Foundation in all soils and Sub Soil as per SS20B for foundation etc. complete.SS 20B
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Brick Work in CM 1:5 mix using II Class Bricks including cost and conveyance of materials and labour charges etc complete. - 100.00 Cft
Cost and Supply of Sand filling from approved quarry including cost and conveyance of all material etc completed
Cost and Supply of 40mm HBG Metal from approved quarry including cost and conveyance of all material etc completed
Cost and Supply of 20mm HBG Metal from approved quarry including cost and conveyance of all material etc completed
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
Exterior Emulsion two coats to the outside of the Building using best approved best quality of Ccement Paint including cost of Cement Paint, brushes,scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers. Rate for 10m2.for Out side of the Building (New Wall)
Supplying and fixing P.V.C rainwater down fall pipe of 110mm dia with necessary shoes, bends,& clamps etc.,
Provisions for Rain water harvesting structure No.2
Earth work Excavation for Foundation in all soils and Sub Soil as per SS20B for foundation etc. complete.SS 20B
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Brick Work in CM 1:5 mix using II Class Bricks including cost and conveyance of materials and labour charges etc complete. - 100.00 Cft
Cost and Supply of Sand filling from approved quarry including cost and conveyance of all material etc completed
Cost and Supply of 40mm HBG Metal from approved quarry including cost and conveyance of all material etc completed
Cost and Supply of 20mm HBG Metal from approved quarry including cost and conveyance of all material etc completed
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
Exterior Emulsion two coats to the outside of the Building using best approved best quality of Ccement Paint including cost of Cement Paint, brushes,scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers. Rate for 10m2.for Out side of the Building (New Wall)
Supplying and fixing P.V.C rainwater down fall pipe of 110mm dia with necessary shoes, bends,& clamps etc.,
Provisions for Cubboard arrangements for (Teacher) No:1
Brick Work in CM 1:5 mix using II Class Bricks including cost and conveyance of materials and labour charges etc complete. - 100.00 Cft
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
Supplying & fixing with cuddapah slabs 20-30mm thick for cup board thick and pointed with cement mortar 1:3 -10 Sqm
Distempering two coats with approved Distemper over two coat of Priming coat of Cement Paint cement plastered wall surface, ceiling and other new surface including cleaning, preparing the surface, curing, scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers
Providing Cup-board Shutter with frame using termite / water proof plywood of 19mm thick over which laminated sheet of 0.8mm thick fixed inside the shutter and 1mm thick fixed in the outside of the shutter using fevicol along with necessary furniture fittings, such as, hydralic hinges, tower bolt, handles, multi purpose locks etc., as directed by the Departmental Officers. The design pattern, water proof plywood, laminate sheet and other materials should be got approved from the Executive Engineer befoe use on work (P. No.52 sl. No.124)
Provisions for Lock & Key arrangements
Provisions for Cubboard arrangements for (Teacher) No:2
Brick Work in CM 1:5 mix using II Class Bricks including cost and conveyance of materials and labour charges etc complete. - 100.00 Cft
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
Supplying & fixing with cuddapah slabs 20-30mm thick for cup board thick and pointed with cement mortar 1:3 -10 Sqm
Distempering two coats with approved Distemper over two coat of Priming coat of Cement Paint cement plastered wall surface, ceiling and other new surface including cleaning, preparing the surface, curing, scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers
Providing Cup-board Shutter with frame using termite / water proof plywood of 19mm thick over which laminated sheet of 0.8mm thick fixed inside the shutter and 1mm thick fixed in the outside of the shutter using fevicol along with necessary furniture fittings, such as, hydralic hinges, tower bolt, handles, multi purpose locks etc., as directed by the Departmental Officers. The design pattern, water proof plywood, laminate sheet and other materials should be got approved from the Executive Engineer befoe use on work (P. No.52 sl. No.124)
Provisions for Lock & Key arrangements
Provisions for Cubboard arrangements for (Students) No:1
Brick Work in CM 1:5 mix using II Class Bricks including cost and conveyance of materials and labour charges etc complete. - 100.00 Cft
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
Supplying & fixing with cuddapah slabs 20-30mm thick for cup board thick and pointed with cement mortar 1:3 -10 Sqm
Distempering two coats with approved Distemper over two coat of Priming coat of Cement Paint cement plastered wall surface, ceiling and other new surface including cleaning, preparing the surface, curing, scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers
Providing Cup-board Shutter with frame using termite / water proof plywood of 19mm thick over which laminated sheet of 0.8mm thick fixed inside the shutter and 1mm thick fixed in the outside of the shutter using fevicol along with necessary furniture fittings, such as, hydralic hinges, tower bolt, handles, multi purpose locks etc., as directed by the Departmental Officers. The design pattern, water proof plywood, laminate sheet and other materials should be got approved from the Executive Engineer befoe use on work (P. No.52 sl. No.124)
Provisions for Lock & Key arrangements
Provisions for Cubboard arrangements for (Students) No:2
Brick Work in CM 1:5 mix using II Class Bricks including cost and conveyance of materials and labour charges etc complete. - 100.00 Cft
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
Supplying & fixing with cuddapah slabs 20-30mm thick for cup board thick and pointed with cement mortar 1:3 -10 Sqm
Distempering two coats with approved Distemper over two coat of Priming coat of Cement Paint cement plastered wall surface, ceiling and other new surface including cleaning, preparing the surface, curing, scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers
Providing Cup-board Shutter with frame using termite / water proof plywood of 19mm thick over which laminated sheet of 0.8mm thick fixed inside the shutter and 1mm thick fixed in the outside of the shutter using fevicol along with necessary furniture fittings, such as, hydralic hinges, tower bolt, handles, multi purpose locks etc., as directed by the Departmental Officers. The design pattern, water proof plywood, laminate sheet and other materials should be got approved from the Executive Engineer befoe use on work (P. No.52 sl. No.124)
Provisions for Lock & Key arrangements
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Bala Construction
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .