Loading…
Loading…
Tender Value
₹2.9 L
EMD Value
₹5,820
Closing Date
4 Aug 2026, 6:00 pm
xen rew udhampur
xen rew udhampur
boq
2026_RDPR_316530_8
e-NIT No. 55 REW UDHAMPUR of 2026-27 Dated 17-07-2026
Open Tender
Civil Works
Percentage
30 days
udhampur
nit
2 documents required · 2 mandatory
₹600
xen rew udhampur
₹5,820
Yes
20 Jul 2026
20 Jul 2026
5 Aug 2026
20 Jul 2026
4 Aug 2026
20 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Provison for Citizen Information Board | 1 | no. | 1,500 | ₹1,500 |
| 2 | Demolishing stone rubble masonry manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge: In cement mortar | 11.21 | Cum | 1,740.45 | ₹19,510.44 |
| 3 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: A.K.S | 6.37 | Cum | 479.3 | ₹3,053.14 |
| 4 | P/L in position Cement concrete (1:5:10) 1 cement: 5 fine sand: 10 graded crushed stone agg. 20 mm excluding the cost of centring & shuttering all work upto plinth level. | 1.59 | Cum | 6,503.58 | ₹10,340.69 |
| 5 | P/L of RR stone masonary laid in 1:6 cement mortar | 24.53 | Cum | 6,134.43 | ₹1,50,477.57 |
| 6 | 20mm Cement plaster of mix: 1:6 cement mortar | 37.08 | sqm | 408.58 | ₹15,150.15 |
| 7 | P/L C.conc. Flooring 1:2:4 mix using 20 mm nominal size of stone aggregate(40 mm Thick) | 7.43 | sqm | 599.86 | ₹4,456.96 |
| 8 | P/L in position Reinforced Cement Concrete 1 cement : 1.5fine sand : 3graded crushed stone agg.20 mm nominal size(1:1.5:3) excluding the cost of centring & shuttering for slab. | 2.32 | Cum | 11,566.75 | ₹26,834.86 |
| 9 | Providing tar steel reinforcement including cutting bending binding etc | 184.24 | kg | 123.2 | ₹22,698.37 |
| 10 | Providing centering and shuttering including struting, propping etc for slab | 10.59 | sqm | 718.2 | ₹7,605.74 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.20 MB
BOQ_1032450.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].