| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.3 LAccepted-Finance 3 RAJA GOPI MOHAN STREET KOLKATA WB 700006 | KOLKATA | WEST BENGAL | 700006 | ₹5.3 L | L1 | Accepted-Finance L1 |
| 2 | L2₹5.4 L+₹7,224.07 (1.37%)Rejected-Finance 5 S N BANERJEE ROAD | KOLKATA | WEST BENGAL | 700001 | ₹5.4 L+₹7,224.07 (1.37%) | L2 | Rejected-Finance L2 |
| 3 | L3₹5.5 L+₹19,103.66 (3.62%)Rejected-Finance 5 S N BANERJEE ROAD | HOOGHLY | WEST BENGAL | 712101 | ₹5.5 L+₹19,103.66 (3.62%) | L3 | Rejected-Finance L3 |
Tender Value
₹5.4 L
EMD Value
₹11,000
Closing Date
23 Mar 2026, 2:00 pmClosed
EE(WS)/N
KMC WATER SUPPLY NORTH,79 BIDHAN SARANI,BOROUGH-II
IMPROVEMENT OF U.F.W SUPPLY BY LAYING OF 150 MM DIA MAIN PIPE AND ALLIED WORKS TO FACILATE THE DRAINAGE PROJECT WORKS FROM BIDHAN SARANI TO AMHERST ST (ALONG BECHU CHATTERJEE ST ) IN WD NO-38
2026_KMC_1022211_1
KMC/WS/N/25-26/38/183
Open Tender
CIVIL WORKS
Percentage
23 days
IN WARD NO 38
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹11,000
11 Jun 2026
13 Mar 2026
25 Mar 2026
13 Mar 2026
23 Mar 2026
13 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | CHAPTER - I [ SUPPLEMENTARY ] EXCAVATION, SHORING, BAMBOO PILING, FENCING & SIGN BOARD, LIGHTING & SIGNALING AND SITE CLEANING ETC. 1.4 Excavation of trial pit (3.0 m x 1.0 m x (upto) 3.0 m) for fixing of pumping main, washout line raking every detection against damage of S.W. pipe line electrical cable etc. as underground obstruction including 37.5 mm timber shuttering, earth cutting, dewatering, barricading and back filling etc. as per directionj of E-I-C | 6 | EA | 1,867 | ₹11,202 |
| 2 | CHAPTER - VIII SUPPLYING OF MATERIALS HIRE CHARGES OF MACHINERIES 8.27Hire charges of moveable type mounted earth excavator having minimum cutter size (1.0 cubic meter) & loader size (2.0 meter length x 0.75m width) for cutting & removal of any kind of soil, spoli etc. including cost of fuel, lubricants & manpower etc. in Water Supply Works. [ This item will be operated on prior permission from the concerned SE/Dy. Chief Engineer] For minimum engagement of 8 hrs. In a day | 11 | DAY | 8,951 | ₹98,461 |
| 3 | CHAPTER - I [ SUPPLEMENTARY ] EXCAVATION, SHORING, BAMBOO PILING, FENCING & SIGN BOARD, LIGHTING & SIGNALING AND SITE CLEANING ETC. 1.1 Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm. | 56.25 | %M3 | 119.27 | ₹6,708.94 |
| 4 | CHAPTER - I [ SUPPLEMENTARY ] EXCAVATION, SHORING, BAMBOO PILING, FENCING & SIGN BOARD, LIGHTING & SIGNALING AND SITE CLEANING ETC. 1.2 Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete.(Payment to be made based on the basis of measurement of finished quantity of work.(a) With earth obtained from excavation of foundation | 56.25 | %M3 | 77.54 | ₹4,361.63 |
| 5 | CHAPTER - I [ SUPPLEMENTARY ] EXCAVATION, SHORING, BAMBOO PILING, FENCING & SIGN BOARD, LIGHTING & SIGNALING AND SITE CLEANING ETC. 1.10 Hire and labour charges for coir rope fencing 25 mm dia rope single on 120 mm dia bamboo posts 1.40 m above G.L and 600 mm below G.L, 1.50 m apart including digging holes complete. | 457 | MTR | 17 | ₹7,769 |
| 6 | CHAPTER - II LAYING & JOINTING PIPES, SPECIALS ETC.2.1 C.I. / D.I. Pipe & Specials 2.1 C.I. / D.I. Pipe & Specials 2.1.2 Lowering any type of Ductile Iron (DI) pipes & specials and laying along trench at any depth as per speclfication and direction of the Engineer-incharge, ( laying over ground. the rates shall be, reduced by 10% and the rates so reduced shall be inclusive of cost of all sorts of holding arrangements]Diameter in mm 150mm dia. | 457 | %MT | 18.78 | ₹8,582.46 |
| 7 | CHAPTER - II LAYING & JOINTING PIPES, SPECIALS ETC.2.1 C.I. / D.I. Pipe & Specials 2.1 C.I. / D.I. Pipe & Specials 2.1.7 Cutting of C.l/D.I pipes for fitting with pipes and-or specials of similar or dissimilar materials at the time of laying without damaging any part of the required length including taking out of the broken pieces from the trench and restacking the same at the specified location as per direction of the Engineer-in-Charge.D iameter in mm 150mm dia. | 36 | EA | 126 | ₹4,536 |
| 8 | CHAPTER - II LAYING & JOINTING PIPES, SPECIALS ETC.2.1 C.I. / D.I. Pipe & Specials 2.1 C.I. / D.I. Pipe & Specials 2.1.7 Cutting of C.l/D.I pipes for fitting with pipes and-or specials of similar or dissimilar materials at the time of laying without damaging any part of the required length including taking out of the broken pieces from the trench and restacking the same at the specified location as per direction of the Engineer-in-Charge.D iameter in mm 100mm dia. | 20 | EA | 91 | ₹1,820 |
| 9 | CHAPTER - VIII SUPPLYING OF MATERIALS HIRE CHARGES OF MACHINERIES 8.28Hire charges of lighting generator of capacity 5KVA including fuel, mobil, operator, carriage etc. including all complete for water supply works. For minimum engagement of 8 hrs. In a day | 15 | DAY | 1,650 | ₹24,750 |
| 10 | CHAPTER - II LAYING & JOINTING PIPES, SPECIALS ETC.2.1 C.I. / D.I. Pipe & Specials 2.1 C.I. / D.I. Pipe & Specials 2.1.8 Chamfering the spigot end of C.l./D,l. pipes for fitting with the socket of C.I./D.I pipes and/or specials in tyton jointed water mains or other wise using electric grinder as per specification and direction of the Engineer-in-Charge. Diameter in mm 150mm dia. | 36 | EA | 113 | ₹4,068 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.93 MB
Tendernotice_2.pdf
PDF • 1.93 MB
Tendernotice_3.pdf
PDF • 1.74 MB
BOQ_2512328.xls
BOQ • 0.38 MB
price38183.pdf
Additional Documents • 0.81 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .