| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹62.2 CrAccepted-AOC KUBERAN NAGAR MARANI ROAD THIRUMALPURAM POST MADURAI 14 | MADURAI | TAMIL NADU | 625014 | L1 | Accepted-AOC Low percentage quoted | |
| 2 | L2₹65.3 Cr+₹3.1 Cr (5.01%)Rejected-AOC | L2 | Rejected-AOC High percentage quoted | |
| 3 | L3₹67.0 Cr+₹4.8 Cr (7.71%)Rejected-AOC 18 CORPORATION ROAD DEVAKOTTAI SIVAGANGAI 630 302 | DEVAKOTTAI | SIVAGANGAI | TAMIL NADU | 630302 | L3 | Rejected-AOC High percentage quoted |
Tender Value
₹62.2 Cr
EMD Value
₹1.2 Cr
Closing Date
6 Dec 2024, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer
O/o the Superintending Engineer NH Tirunelveli
One time improvement on existing two lane of Nagapattinam Ramanathapuram Tuticorin Road NH32 from Km 154 4 205 0 218 2 284 181 and Ramanathapuram By Pass Road at km 4 750 10 075 121.906 Km under deposit work.
2024_MoRTH_833484_1
03/2024-2025
Open Tender
Civil Works - Highways
Percentage
300 days
Ramanathapuram
As per Tender Document
3 documents required · 3 mandatory
₹17,700
As per Tender Document
₹1.2 Cr
O/o the Superintending Engineer NH Tirunelveli
19 Mar 2025
4 Nov 2024
9 Dec 2024
4 Nov 2024
6 Dec 2024
4 Nov 2024
19 Nov 2024
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing the Light jungles including weeding out shrubs bushes, vegetation growth etc., as per specifications and directions of Engineer in charge.
Km 154/4 - 205/0. | 1,10,400 | Sqm | 29.74 | ₹32,83,296 |
| 2 | Clearing the Light jungles including weeding out shrubs bushes, vegetation growth etc., as per specifications and directions of Engineer in charge.
Km 218/2 - 284/181 and Ramanathapuram bypass road at Km 4/750-10/075 | 1,52,534.4 | Sqm | 29.74 | ₹45,36,373.06 |
| 3 | Tack Coat - Providing and applying tack coat with bitumen emulsion (RS-I) using emulsion pressure distributor at the rate of 2 kg per 10 sqm on the prepared bituminous surface cleaned with mechanical broom as per clause 503 - over existing bituminous surfaces as per MORTH Rev. V
Km 154/4 - 205/0 | 3,55,575 | Sqm | 13.75 | ₹48,89,156.25 |
| 4 | Tack Coat - Providing and applying tack coat with bitumen emulsion (RS-I) using emulsion pressure distributor at the rate of 2 kg per 10 sqm on the prepared bituminous surface cleaned with mechanical broom as per clause 503 - over existing bituminous surfaces as per MORTH Rev. V
Km 218/2 - 284/181 and Ramanathapuram bypass road at Km 4/750-10/075 | 6,03,073 | Sqm | 13.76 | ₹82,98,284.48 |
| 5 | Dense Graded Bituminous Macadam (Table - 500-10) Providing and laying dense bituminous macadam with 100 -120 TPH Hot Mix Plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder (Viscosity Grade 40) at percentage specified by JMF by weight of total mix of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per clause 505 as per MORTH Rev. V - Grading II. (for patches)
Km 154/4 - 205/0 | 711.15 | Cum | 11,993.14 | ₹85,28,921.51 |
| 6 | Dense Graded Bituminous Macadam (Table - 500-10) Providing and laying dense bituminous macadam with 100 -120 TPH Hot Mix Plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder (Viscosity Grade 40) at percentage specified by JMF by weight of total mix of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per clause 505 as per MORTH Rev. V - Grading II. (for patches)
Km 218/2 - 284/181 and Ramanathapuram bypass road at Km 4/750-10/075 | 1,206.15 | Cum | 11,920.03 | ₹1,43,77,344.18 |
| 7 | Bituminous Concrete (Table 500-17) Providing and laying bituminous concrete with 100 -120 TPH Hot Mix Plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder CRMB 55 at percentage specified by JMF of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction specification as per clause No. 507 complete in all respects as per MORTH Rev.V Grading II.
Km 154/4 - 205/0 | 14,223 | Cum | 13,427.2 | ₹19,09,75,065.6 |
| 8 | Bituminous Concrete (Table 500-17) Providing and laying bituminous concrete with 100 -120 TPH Hot Mix Plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder CRMB 55 at percentage specified by JMF of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction specification as per clause No. 507 complete in all respects as per MORTH Rev.V Grading II.
Km 218/2 - 284/181 and Ramanathapuram bypass road at Km 4/750-10/075 | 24,122.92 | Cum | 13,357.47 | ₹32,22,21,180.21 |
| 9 | Filling Pot-holes and Patch Repairs with Bituminous Concrete Gr II, 40 mm Providing treatment and repair to pot holes/ruts and any depth /patch repair of all types of bitumen pavement complete as per Technical Specification Clause 3004.2 and as per direction of engineer by using CRMB 55 bitumen the job includes removal of all failed material, trimming of completed excavation to provide firm vertical faces. Cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504, compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 of MoRTH Rev V.
Km 154/4 - 205/0 | 1,637.5 | Sqm | 531 | ₹8,69,512.5 |
| 10 | Construction of embankment with approved materials deposited from adjacent to site and excavation from drain and foundation of other structures graded and completed to meet requirement of table 300-2 as per clause 301 of MoRTH Rev V.
Km 154/4 - 205/0. | 6,072 | Cum | 151.5 | ₹9,19,908 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ_875878.xls
BOQ • 0.27 MB
155596253.pdf
Tender Documents • 0.10 MB
155596255.html
Tender Documents • 0.05 MB
Tenderdocument.pdf
Tender Documents • 1.18 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .