| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.7 CrAccepted-AOC | ₹2.7 Cr Quoted ₹2.8 Cr | L1 | Accepted-AOC The Lowest Bid after negotiation has been accepted by the TAC in the 97th TAC Meeting held on 12.02.2026. |
| 2 | L2₹2.9 CrRejected-AOC | ₹2.9 Cr | L2 | Rejected-AOC L2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical Not satisfied the qualificaiton criteria |
| Sl No | Description | Qty | Unit | KPT CONSTRUCTION L1 | KMS&CO L2 |
|---|---|---|---|---|---|
| 1.00 | Clearing Juliflora jungle without uprooting and disposing of the same as directed by the engineer in charge of the works as per technical specification | 9,992 | Sqm | 8 ₹79,936 | 8.5 ₹84,932 |
| 2.00 | Dismantling, clearing away and carefully stacking material and without disturbing nearby structure useful for reuse for any thickness of brick or stone masonry in cement Mortar walls under 3 (Three) meters high etc, complete as directed by the Engineer in charge of works and as per the
technical specifications. | 43.3 | Cum | 308 ₹13,336.40 | 325 ₹14,072.50 |
| 3.00 | Dismantling, clearing away and carefully stacking material and without disturbing nearby structure useful for reuse for any thickness of Plain Cement Concrete etc, complete as directed by the Engineer in charge of works and as per thetechnical specifications. | 23.6 | Cum | 530 ₹12,508 | 560 ₹13,216 |
| 4.00 | Earthwork in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation of bunds, breaking clods, sectioning etc. complete including extra watering and compaction of earth fill layers to specified density of 95% of proctor density through deployment of appropriate compaction equipment (standard 8-10 ton power roller; short width drum vibratory power roller; vibratory power roller, complete complying with standard specification and as directed by the Departmental Officers. | 1,33,940 | Cum | 111 ₹1.5 Cr | 117 ₹1.6 Cr |
| 5.00 | Earthwork deploying earth moving machinaries for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearence etc complete
having a width of 3-10m. | 49,750 | Cum | 46 ₹22.9 L | 49 ₹24.4 L |
| 6.00 | Earthwork excavation for foundation in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size of boulders hard gravelly soil inclusive of shoring to full depth strutting and bailing out water wherever necessary and refilling the sides of foundation with excavated soil other than sand in layers of not more than 15 cm thick, well rammed, consolidated and depositing the surplus earth in places as shown by the departmental officers with an initial lead of 10 (Ten) metres and initial lift of 2 (Two) metres and clearing, levelling the site etc., complete complying with standard specification and as directed by the departmental officers. | 266 | Cum | 282 ₹75,012 | 300 ₹79,800 |
| 7.00 | Earthwork excavating and depositing bank with an initial lead of 10m. and initial lift of 2m. in Hard stiff clay, stiff black cotton soil, Hard red earth, shales, Murrams, stoney earth and earth mixed with small sized boulders and other gravelly soils SS 20B | 147.5 | Cum | 135 ₹19,912.50 | 140 ₹20,650 |
| 8.00 | Suppling and filling with CS sand for filling in layers of not more than 15cm thick well rammed with water complying with standard specification and as directed by the departmental officers. | 55.3 | Cum | 1,870 ₹1.0 L | 1,970 ₹1.1 L |
| 9.00 | Providing and placing Plain Cement Concrete M 15 grade using well graded aggregates of nominal maximum size of 40mm and downgraded to I.S specified grading (To achieve the specified charaterstics strength of 15N/mm² in 28 days) and mixing the ingredients in approved mixer including dewatering of the placement site by bailling / pumbing and diverting wharever necessary, placing concrete in layers, watering, curing, finishing the surface with all leads and lifts etc., complete as directed by the Engineer in charge of works and as per the technical specifications. | 91 | Cum | 6,300 ₹5.7 L | 6,650 ₹6.1 L |
| 10.00Supplying and erecting water tight steel centering for sides and soffits including necessary supports and shuttering including strutting for retaining wall and all RCC works such as column, footing, plinth beam, etc., upto 3.29m height and all cross bracings using mild steel BG 10 sheets of size 90cm x 60cm gauge stiffeded with welded mild steel angles of size 25x25x3mm for boarding laid over silver oak ( country wood ) joits of size 10x6.5cm spaced at about 90cm centre to centre and suitably supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre including cost of materials etc., complete complying with standard specification as directed by the departmental officers the payment for centering shall be given after the concrete is laid and the retrived materials should be taken back the contractor. | |||||
Updated dates
Tender Value
₹2.7 Cr
EMD Value
₹1.5 L
Closing Date
29 Oct 2025, 3:00 pmClosed
Superintending Engineer,WRD.,
Vaippar Basin Circle, WRD Campus, Opp. to VVV College, Madurai Road, Virudhunagar.
Rehabilitation of Paralachi Tank, Poolangal Tank, Purasalur Tank, Muthuramalingapuram Tank and Kullampatty Tank in Aruppukottai Taluk of Virudhunagar District.
2025_WRD_612837_1
6 /VBC/C.T-N/25-26/Dt.03.10.25
Open Tender
Civil Works - Water Works
365 days
Aruppukottai Taluk of Virudhunagar District.
Refer Tender Document
9 documents required · 9 mandatory
₹0
₹1.5 L
12 Feb 2026
10 Oct 2025
30 Oct 2025
10 Oct 2025
29 Oct 2025
10 Oct 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.52 MB
BOQ_732288.xls
BOQ • 0.36 MB
TenderDocumentParalachiTankandothers.pdf
Additional Documents • 1.13 MB
PQDocumentParalachiTankandothers.pdf
Tender Documents • 0.72 MB