Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹17.8 LAdmitted-Finance | -1.03% | ₹17.8 L | L1 | Admitted-Finance |
| 2 | L2₹17.8 L+₹558.85 (0.03%)Admitted-Finance | -1.00% | ₹17.8 L+₹558.85 (0.03%) | L2 | Admitted-Finance |
| 3 | L3₹18.0 L+₹18,568.06 (1.04%)Admitted-Finance | +0.00% | ₹18.0 L+₹18,568.06 (1.04%) | L3 | Admitted-Finance |
| 4 | Rejected-Technical | - | - | - | Rejected-Technical Reject |
| 5 | Rejected-Technical | - | - | - | Rejected-Technical Reject |
Tender Value
₹18.0 L
EMD Value
₹18,100
Closing Date
22 Jul 2026, 4:00 pmClosed
E E RWS Z P CHANDRAPUR
E E RWS Z P CHANDRAPUR
C/o, Public Well at New Kolsa (Rehab) Village. Th-Mul
2026_CHAND_1315350_1
RWS_ZP_CHANDRAPUR 11/2026-27
Open Tender
Civil Works - Water Works
Percentage
180 days
Mul
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
₹18,100
5 Aug 2026
7 Jul 2026
23 Jul 2026
7 Jul 2026
22 Jul 2026
7 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 2 | Public Well Excavation in Genral in soft material compressing of soft soil soft murum sand , hard murum with boulderin wet or dry condition for head works that is supply well for lift 0 to 1.50 m. and lead of 150 meter including barrcading guarding disposing of surplus excavated stuff with in radius of 0.5 Km. as directed by Engineer in Charge Etc. Complete. Excluding refilling.Lift 0 to 1.5 M. | 169.56 | Cum | 510 | ₹86,475.6 |
| 3 | Lift 1.50 to 3 M. | 142.48 | Cum | 540 | ₹76,939.2 |
| 4 | Lift 3 to 4.50M. | 117.75 | Cum | 570 | ₹67,117.5 |
| 5 | Lift 4.50 to 6 M. | 95.38 | Cum | 600 | ₹57,228 |
| 6 | Lift 6 to 7.5 M. | 75.36 | Cum | 630 | ₹47,476.8 |
| 7 | Lift 7.5 to 9.00M. | 57.7 | Cum | 660 | ₹38,081.34 |
| 9 | Excavation in Genral in hard material compressing of soft rock , hard rock Manjara rock by blasting / controllted blasting , Chisseling as required in wet or dry condition for head works that is supply well for lift 0 to 1.50 m. and lead of 150 meter including barrcading guarding disposing of surplus excavated stuff with in radius of 0.5 Km. as directed by Engineer in Charge Etc. Complete. Excluding refilling.Lift 9 to 10.50 M. | 49.75 | Cum | 1,304 | ₹64,872.7 |
| 10 | Lift 10.50 to 12.00 | 42.39 | Cum | 1,335 | ₹56,590.65 |
| 11 | Lift 12.00 to 13.50 | 35.62 | Cum | 1,366 | ₹48,656.92 |
| 12 | Lift 13.50 to 15.00 | 29.44 | Cum | 1,397 | ₹41,123.49 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.00 MB
BOQ_2255571.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .