Loading…
Loading…
Tender Value
₹1 L
EMD Value
₹2,000
Closing Date
8 Aug 2026, 4:30 pm7d left
ER fayaz Amed
ecutive enineer REW Ramban
AS PER NIT
2026_RDPR_317988_2
e-Nit 22.1 of REW Ramban( PRI UKHRAL)
Open Tender
Civil Works
Percentage
UKHRAL
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Executive enineer REW Ramban
₹2,000
Yes
27 Jul 2026
27 Jul 2026
10 Aug 2026
27 Jul 2026
8 Aug 2026
28 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches (not exceeding, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil | - | cum | 592.9 | - |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:5:10 | - | cum | 4,826.5 | - |
| 3 | Dry random rubble masonry with hard stone in foundation and plinth: Without bond stone (Nallah) | 1 | cum | 2,793.8 | ₹2,791.01 |
| 4 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in Cement mortar 1:6 ( 1 cement : 6 coarse sand) | - | cum | 7,571.55 | - |
| 5 | Providing and laying in position reinforced cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:1.5:3 | - | cum | 9,821.85 | - |
| 6 | Providing and fixing 1mm thick M.S. sheet door with frame of 40x40x6mm angle iron and 3mm M.S. gusset plates at the junctions and corners, all necessary fittings complete, including applying a priming coat of approved steel primer.
10.5.1 Using M.S. angles 40x40x6mm for diagonal braces | - | cum | 4,352.95 | - |
| 7 | Reinforcement for RCC work complete job | - | kg | 123.05 | - |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form work for:slab | 1 | sqm | 718.2 | ₹717.48 |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form work for:foundation | - | m | 262.3 | - |
| 10 | 12 mm thick cement plaster in 1:4 mix | 1 | sqm | 283.8 | ₹283.52 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.22 MB
BOQ_1045243.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].