| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹45.3 LAccepted-Finance A 7 62 SECTOR 15 ROHINI DELHI 110089 | NORTH WEST | DELHI | 110089 | L-1 | Accepted-Finance 1st lowest bidder. | |
| 2 | L-2₹46.8 L+₹1.5 L (3.36%)Accepted-Finance | L-2 | Accepted-Finance 2nd lowest bidder. | |
| 3 | L-3₹47.7 L+₹2.4 L (5.30%)Accepted-Finance 2 63 SHIVAJI NAGAR GURUGRAM HARYANA | L-3 | Accepted-Finance 3rd lowest bidder. | |
| 4 | L-4₹48.1 L+₹2.8 L (6.12%)Accepted-Finance | L-4 | Accepted-Finance 4th lowest bidder. | |
| 5 | L-5₹51.4 L+₹6.0 L (13.3%)Accepted-Finance | L-5 | Accepted-Finance 5th lowest bidder. |
Tender Value
₹70.2 L
EMD Value
₹1.4 L
Closing Date
6 Jun 2026, 3:00 pmClosed
Executive Engineer
O/o Executive Engineer, PWD Division M-413, Under Ring Road Bypass Flyover, Opp. IGI Stadium Gate No. 9, New Delhi-110002
Restoration of road cut by Delhi Jal Board at Ring Road from Khyber Pass Red Light towards Mall Road Red Light and University Road under Sub Division-4 dg. 2026-27.
2026_PWD_292338_1
32/EE/C and ND-R/PWD/2026-27
Open Tender
Civil Works - Roads
Percentage
60 days
Sub. Division-4
Please refer Tender documents.
14 documents required · 14 mandatory
₹0
₹1.4 L
16 Jun 2026
30 May 2026
6 Jun 2026
30 May 2026
6 Jun 2026
30 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.0 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. | - | - | - | - |
| 0.0 | All kinds of soil. | 1,939 | Cum | 260.3 | ₹5,04,721.7 |
| 0.0 | Preparation and consolidation of sub grade with power road roller of 8 to 12 tonne capacity after excavating earth to an average of 22.5 cm depth, dressing to camber and consolidating with road roller including making good the undulations etc. and re-rolling the sub grade and disposal of surplus earthwith lead upto 50 metres. | 1,330 | Sqm | 218.9 | ₹2,91,137 |
| 0.0 | Providing and applying tack coat using bitumen emulsion conforming to IS: 8887, using emulsion pressure distributer including preparing the surface & cleaning with mechanical broom. | - | - | - | - |
| 0.0 | With medium setting bitumen emulsion.
On bituminous surface @ 0.25kg/sqm. | 2,770 | Sqm | 14.05 | ₹38,918.5 |
| 0.0 | Providing and laying Dense Graded Bituminous Macadam using crushed stone aggregates of specified grading, premixed with bituminous binder and filler, transporting the hot mix to work site by tippers, laying with paver finisher equiped with electronic sensor to
the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers as per specifications to achieve the desired compaction and density, complete as per specificatons and directions of Engineer-in-Charge. | - | - | - | - |
| 0.9 | 50 to 100 mm average compacted thickness with bitumen of grade VG-30 @ 5% (percentage by weight of total mix) and lime filler @ 2% (percentage by weight of Aggregate) prepared in Batch Type Hot Mix Plant of 100-120 TPH capacity. | 139 | Cum | 11,129.55 | ₹15,47,007.45 |
| 0.0 | Providing and laying Bituminous concrete using crushed stone aggregates of specified grading, premixed with bituminous binder and filler, transporting the hot mix to work site by tippers, laying with paver finisher equiped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction and density as per specification, complete and as per directions of Engineer-in-Charge. | - | - | - | - |
| 0.9 | 40/50 mm compacted thickness with bitumen of grade VG-30 @ 5.5% (percentage by weight of total mix) and lime filler @ 3% (percentage by weight of Aggregate) prepared in Batch Type Hot Mix Plant of 100-120 TPH capacity. | 61 | Cum | 12,126.2 | ₹7,39,698.2 |
| 0.0 | Construction of granular sub-base by providing close graded Material conforming to specifications, mixing in a mechanical mix plant at OMC, carriage of mixed material by tippers to work site, for all leads & lifts, spreading in uniform layers of specified thickness with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per specifications and directions of Engineer-in-Charge. | - | - | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.91 MB
NIT.pdf
Tender Documents • 5.89 MB
BOQ_388267.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .