Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
₹23,500
Closing Date
10 Sept 2022, 11:00 amClosed
Executive Engineer JSD PHE Mech Rural Division Sgr
Executive Engineer JSD PHE Mech Rural Division Sgr
Servicing/ Over-hauling of Air cooled Kiloskar make 25 KVA DG set at Lift WSS of Athwajan (Khonmoh Belt).
2022_PHE_186709_1
PHE/MRD/TS/ 75 of 09/2022
Open Tender
Miscellaneous Works
Item Rate
7 days
Srinagar
Please refer Tender documents.
2 documents required · 2 mandatory
₹100
Executive Engineer JSD PHE Mech Rural Division Sgr
6 Oct 2022
2 Sept 2022
10 Sept 2022
2 Sept 2022
10 Sept 2022
2 Sept 2022
Amount
Complete M-oil (lubricating oil) change of the Engine by way of drainage of the existing M-oil by opening the drain plug and allowing the old oil to drain completelly. Providing and Filling of fresh M-oil (8 litres) both M-oil filters diesel filters (1set), Air filters (1set). Make : As recommended by OEM)
Complete balancing of engine by way of tappet clearance checking and setting, checking and adjusting of fuel system , necessary adjustments of Governor settings if reqd. Cleaning of oil cooler fins by way of using recommended chemicals and air pressure. Also checking for Leaks, hoses , belts and tension complete in all respects.
Complete calibration of fuel injection pump and injectors (3No’s) by way of replacing damaged quadrants, delivery values, bearing gaskets, plungers, nozzles elements and other damaged parts. The job further includes calibration of fuel infection pump and fuel injection nozzles on calibrating bench machine.
Servicing of self-starter assembly and dynamo assembly by way of dis-assembling of its parts, washing and cleaning of all parts, by using petrol, Dhoti cloth, and then replacing worn out carbon brush set, bushes and bending gear. The job includes refitting and testing the same on full load. Checking the battery condition and topping up of the electrolyte level up to the highest mark with approved electrolyte. Also cleaning of the battery terminals thoroughly and applying of the new petroleum jelly.
Testing of D.G. set on No-load for at least three Hrs. (for idling purpose) followed by on full load for two Hours.
Friends Automobiles
M/S ASHRAF AUTO ELECTRIC WORKS
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .