Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.1 LAccepted-AOC PLOT NO 1 JAGATPURA GOVINDPURA URF ROOPADA JAIPUR JAIPUR | ₹13.1 L | L1 | Accepted-AOC L1 |
| 2 | L2₹17.8 LRejected-AOC H NO DB 32 SECTOR 36 SUNCITY ROHTAK 124001 | ROHTAK | HARYANA | 124001 | ₹17.8 L | L2 | Rejected-AOC L2 |
| 3 | L3₹17.9 LRejected-AOC | ₹17.9 L | L3 | Rejected-AOC L3 |
| 4 | L4₹24.0 LRejected-AOC | ₹24.0 L | L4 | Rejected-AOC L4 |
| 5 | L5₹27.7 LRejected-AOC | ₹27.7 L | L5 | Rejected-AOC L5 |
| Sl No | Description | Qty | Unit | Nai Nath Construction Co L4 | KULDEEP CONSTRUCTION COMPANY L3 | Ankita Construction Company L2 | M/S JASWAL BUILDERS L5 | M/S JASHVEER CONSTRUCTION COMPANY L1 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in surface excavation not exceeding 30cm. in depth but exceeding 1.5 meter in width as well as 10 Sqm on plan including disposal of excavated earth up to 50 Mtr. and lift up to 1.5 Mtr. disposed soil to be levelled and neatly dressed: All kinds of soil | 1,050 | Sqm | 75 ₹78,750 | 21 ₹22,050 | 15 ₹15,750 | 22.5 ₹23,625 | 8.5 ₹8,925 |
| 2.00 | Carriage of Earth, Sand, Lime, Morrum manure or sludge including loading unloading etc. upto 5 KM. | 160 | Cum | 75 ₹12,000 | 65 ₹10,400 | 22 ₹3,520 | 45.9 ₹7,344 | 18 ₹2,880 |
| 3.00 | Supply & Stacking good earth at site complete including loading unloading & transporation etc. | 250 | Cum | 100 ₹25,000 | 150 ₹37,500 | 120 ₹30,000 | 230 ₹57,500 | 30 ₹7,500 |
| 4.00 | Preparation of different sized beds as directed. | 1,500 | 100 Sqm. | 300 ₹4.5 L | 25 ₹37,500 | 1.8 ₹2,700 | 28.5 ₹42,750 | 1.3 ₹1,950 |
| 5.00Digging of pits of size 0.45 x 0.45x 0.45 m or (0.50+0.40)/2 x (0.50+0.40)2 x .45 mc | ||||||||
| 6.00 | Sandy loam soilc | 400 | per | 75 ₹30,000 | 180 ₹72,000 | 0.3 ₹120 | 8.53 ₹3,412 | 3 ₹1,200 |
| 7.00 | Planting of trees / Shurbs / hedge & climbers plants at desired distance in a row & watering. | 400 | 100 Plants | 150 ₹60,000 | 198 ₹79,200 | 0.1 ₹40 | 10 ₹4,000 | 8 ₹3,200 |
| 8.00Supply of different varities of tree / shrubs/climbers according to height and age of the plant at site including loading/unloading & transportation etc. complete: | ||||||||
| 9.00 | Different varrities of shrubs 900 mm. | 400 | Each | 100 ₹40,000 | 5 ₹2,000 | 60 ₹24,000 | 150 ₹60,000 | 5 ₹2,000 |
| 10.00 | Supply of bogainvellia topiary size 90 cm ht. and 45 cm topary Dia. Including loading unloading & transportation upto site. | 800 | Each | 125 ₹1 L | 208 ₹1.7 L | 180 ₹1.4 L | 200 ₹1.6 L | 100 ₹80,000 |
Tender Value
₹28.8 L
EMD Value
₹57,560
Closing Date
16 May 2025, 6:00 pmClosed
DEPUTY COMMISSIONER GARDEN HERITAGE
JAIPUR NAGAR NIGAM HERITAGE, OLD POLICE HEADQUARTER BUILDING, JALEB CHOWK, BADI CHOPAR JAIPUR
CUTTING OF TREES LOCATED IN ADARSH NAGAR ZONE AREA, REMOVAL OF WILD WEEDS ON MAIN ROADS, MAINTENANCE AND UPKEEP OF DIVIDERS
2025_DLB_465887_1
06 DEPUTY COMMISSIONER GARDEN HERITAGE
Open Tender
Miscellaneous Works
365 days
JAIPUR
As Per Bid Documents
3 documents required · 3 mandatory
₹1,180
ONLINE PAY IN JAIPURMC HERITAGE WEBSITE
₹57,560
Yes
5 Mar 2026
5 May 2025
17 May 2025
5 May 2025
16 May 2025
5 May 2025
Amount
Earth work in surface excavation not exceeding 30cm. in depth but exceeding 1.5 meter in width as well as 10 Sqm on plan including disposal of excavated earth up to 50 Mtr. and lift up to 1.5 Mtr. disposed soil to be levelled and neatly dressed: All kinds of soil
Carriage of Earth, Sand, Lime, Morrum manure or sludge including loading unloading etc. upto 5 KM.
Supply & Stacking good earth at site complete including loading unloading & transporation etc.
Preparation of different sized beds as directed.
Digging of pits of size 0.45 x 0.45x 0.45 m or (0.50+0.40)/2 x (0.50+0.40)2 x .45 mc
Sandy loam soilc
Planting of trees / Shurbs / hedge & climbers plants at desired distance in a row & watering.
Supply of different varities of tree / shrubs/climbers according to height and age of the plant at site including loading/unloading & transportation etc. complete:
Different varrities of shrubs 900 mm.
Supply of bogainvellia topiary size 90 cm ht. and 45 cm topary Dia. Including loading unloading & transportation upto site.
Supply & planting of Petunia, Salvia, Sinereria & Gajenia, sweet william, penjy etc. seasonal flower plant of Pune verity. (Winter Season)
Supply & planting of flowering plants (Cosmos, cockscomb, zinnia hybrid verities) (Summer Season)
Supply of different varities of Bougainvallia having multibranching ht. 2.5-3 feet, crown dia 2-2.5 feet & stem girth 7-10 cm.
Uprooting weeds from the lawn plots and treched area after 10 to 15 days of its flooding with including disposal of uprooted vegetation
Maintenance of shrubbary or Hedge cutting including disposal of rubbish with all leads & lifts.
Watering of plants with own Tankers (20 ltr of water per sqm at one time, per month according to need/as per requirement)
Maintenance of plants by the contractor including of pits/bids watering preparation of Thavala Hoeing weeding etc. & application of insecticieds etc. & security if the plant die during maintenance contractor has to replace same height plant at his own cost
Description of Work / Item(s)
Amount
Je foHkkx ds vkns'k la[;k 2846 fnukad 07-02-22 ds }kjk dq'ky Jfed ¼ydM+gkjk½ dh nSfud etnwjh fnukad 07-02-22 ls :i;s 283 fu/kkZfjr dh xbZ gS ftls fd dq'ky Jfed ¼ydM+kgjk½ dks Hkqxrku fd;k tkuk vfuok;Z gSA mDr Hkqxrku ds vfrfjDr laosnd }kjk Åij of.kZr nj ij fuxe ls fy;s tkus okyk lqijfotu pktZ e; izksfQV ektZu lfEefyr djrs gq, fu/kkZfjr osru :i;s 283 izfr dq'ky Jfed izfrfnu ij izksfQV ektZu Åij of.kZr vuqlkj tksM+rs gq, izfr'kr esa nj vafdr djsaA 02x 365 fnu x 283 :i;s = 206590.00
Je foHkkx ds vkns'k la[;k 2846 fnukad 07-02-22 ds }kjk vdq'ky Jfed dh nSfud etnwjh fnukad07-02-22 ls :i;s 259 fu/kkZfjr dh xbZ gS ftls fd vdq'ky Jfed dks Hkqxrku fd;k tkuk vfuok;Z gSA mDr Hkqxrku ds vfrfjDr laosnd }kjk Åij of.kZr nj ij fuxe ls fy;s tkus okyk lqijfotu pktZ e; izksfQV ektZu vkfn lfEefyr djrs gq, fu/kkZfjr osru :i;s 259 :i;s vdq'ky Jfed izfr vkB ?k.Vs dh M~;wVh izfrfnu ij izksfQV ektZu Åij of.kZr vuqlkj tksM+rs gq, izfr'kr esa nj vafdr djsaA 04x 365 fnu x 259 :i;s = 378140.00
Je foHkkx ds vkns'k la[;k 2846 fnukad 07-02-22 ds }kjk dq'ky Jfed ¼czq'k dVj vkWijsVj½ dh nSfud etnwjh fnukad 07-02-2022 ls :i;s 283 fu/kkZfjr dh xbZ gS ftls fd dq'ky Jfed e'khu vkWijsVj dks Hkqxrku fd;k tkuk vfuok;Z gSA mDr Hkqxrku ds vfrfjDr laosnd }kjk Åij of.kZr nj ij fuxe ls fy;s tkus okyk lqijfotu pktZ e; izksfQV ektZu lfEefyr djrs gq, fu/kkZfjr osru :i;s 283 izfr dq'ky Jfed izfrfnu ij izksfQV ektZu Åij of.kZr vuqlkj tksM+rs gq, izfr'kr esa nj vafdr djsaA 02x 365 fnu x 283 :i;s = 206590.00
laosnd }kjk dq'ky Jfed@vdq'ky Jfed dk bZ,lvkbZ@bZih,Q isVs fn;s tkus okyk ¼fu;ksDrk dk va'knku½ lEcfU/kr foHkkx dks fd;s x;s HkqxrkuA okLrfod vk/kkj ij iquZHkj.k fd;s tk;sxs
Description of Work / Item(s)
Amount
ifjogu dpjk mBkdj fu/kkZfjr LFkku ij MkyukA ydfM+;k¡ LVksj esa tek djokus gsrq ifjogu dk;Z ¼izfr VªkWyh½ 850 :i;sA
Description of Work / Item(s)
Amount
bySfDVªd pSu lkW gSoh M;wVh CysM] fdlku ØkQV lk lkjisDl da-] LVhy vkfn mPp DokfyVh dh e'khu
iSVªky batu pSu lk gSoh M;wVh fon gSoh CysM ,izwOM DokfyfV
fVªej iSVªky batu 26cc 6 fØxk otuh
dqYgkM+h 750 xzke
gkFkokyh vkjh
twV jksi jLlh 1 bap eksVh
dSaph 10 bap
QkoMk
ckal dh NM+h >kM+w
Ankita Construction Company (BID ID -3167090)
KULDEEP CONSTRUCTION COMPANY (BID ID -3167055)
M/S JASWAL BUILDERS (BID ID -3167171)
Nai Nath Construction Co (BID ID -3158684)
KULDEEP CONSTRUCTION COMPANY (BID ID -3167055)
Nai Nath Construction Co (BID ID -3158684)
M/S JASHVEER CONSTRUCTION COMPANY (BID ID -3165895)
M/S JASWAL BUILDERS (BID ID -3167171)
M/S JASHVEER CONSTRUCTION COMPANY (BID ID -3165895)
Nai Nath Construction Co (BID ID -3158684)
Ankita Construction Company (BID ID -3167090)
M/S JASWAL BUILDERS (BID ID -3167171)
Ankita Construction Company (BID ID -3167090)
KULDEEP CONSTRUCTION COMPANY (BID ID -3167055)
Nai Nath Construction Co (BID ID -3158684)
M/S JASWAL BUILDERS (BID ID -3167171)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid