Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Infra Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.5 LAccepted-Finance | L1 | Accepted-Finance L1 | |
| 2 | L2₹11.6 L+₹2.1 L (22.4%)Accepted-Finance | L2 | Accepted-Finance L2 |
Tender Value
₹11.4 L
EMD Value
₹22,900
Closing Date
12 Feb 2024, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SR REGIONAL MANAGER JAIPUR NORTH VKIA JAIPUR
OFFICE OF THE SR REGIONAL MANAGER UNIT OFFICE JAIPUR NORTH VKIA JAIPUR
Preparation and distribution of water bills of different Industrial Areas under jurisdiction of Unit Jaipur North VKIA Jaipur Rs. 11.45 lacs
2024_RIICO_379554_1
31/2023-24(15)
Open Tender
Civil Works
Item Rate
365 days
Industrial Areas under jurisdiction Jaipur North
The tenderer should be registered in appropriate class according to this tender
4 documents required · 4 mandatory
₹1,180
RIICO
₹22,900
14 Feb 2024
3 Feb 2024
13 Feb 2024
3 Feb 2024
12 Feb 2024
3 Feb 2024
Amount
Preparation and distribution of bi monthly water bills as per detailed scope of work as under The scope of work includes the work of taking monthly water meter reading every month preparation and distribution of bi monthly water consumption bills with Water Billing Module of RIICO ERP Software in prescribed format updation and preparation of monthly ledger posting of issued bills and recovery of deposited bills preparation of outstanding dues list Defective Stopped meter list and preparation of duplicate water bills on ERP WBM Module and ManuallyThe work of updation of all types of permission applications received for Reconnections Replacement of Water Meter and Change of Consumers Name Connection Size etc and other allied works related to WBMManually preparation of New Binders and Ledgers for each financial year preparation of water dues balance sheet and reconciliation of water dues recovery with financial ledger Only new binders ledgers for each financial year shall be provided by the CorporationThe scope also includes providing services with requisite manpower and all leviable Central State taxes transportation etc complete as per the directions of Engineer In Charge
Labour charges of releasing new water connections from distribution system of different sizes 1 2 and above including digging for pipeline, making hole in pipeline fixing clamp on pipeline and fixing of ferrule with G I Pipe for release of a new water connection and making good the surface after back filling of earth in trench including all T and P transportation lead and lift etc complete as per the directions of engineer in charge
Labour charges of making water connection D C or RC from distribution system of different sizes half inch and onwards including digging for pipeline making hole plugging hole in pipeline removal or fixing of ferrule with GI Pipe for RC or DC water connection and making good the surface after back filling of earth in trench including all T and P transportation lead and lift etc complete as per the directions of engineer in charge
Labour charges for Removing Refixing Replacement of water meter for repairing, including all T and P transportation lead and lift etc complete as per the directions of engineer in charge
Labour charges for crossing the water connection pipe under the road crust by manual mechanical means, including all T and P transportation lead and lift etc complete as per the directions of engineer in charge
Labour charges for dismantling of cement concrete RCC Platform for making new connection DC RC at site including all T and P transportation lead and lift etc complete as per the directions of engineer in charge
Labour charges of checking water connections at connection point from distribution system of different sizes half inch and above including digging at connection point for pipeline checking ferrule point, checking clamp on pipeline and aligning of ferrule with GI Pipe for proper flow of water to pipe line and making good the surface after back filling of earth in trench including all T and P transportation lead and lift etc complete as per the directions of engineer in charge
Labour charges of checking disconnected water connections at connection point and nearby from distribution system of different sizes half inch and above including digging at connection point for pipeline checking ferrule point checking clamp on pipeline and alignment of ferrule with GI Pipe if any found at site and making good the surface after back filling of earth in trench including all T and P transportation lead and lift etc complete as per the directions of engineer in charge
SHRI NAMDEV GOVT. CONTRACTOR
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .