| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 CrAccepted-AOC 97 1 YADHAVA STREET VELIPATTINAM RAMANATHAPURAM 523504 | 523504 | ₹2.0 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹2.0 Cr+₹6.2 L (3.14%)Rejected-Finance HIG 25 80 FEET ROAD ARINGAR ANNA NAGAR MADURAI 625 020 | MADURAI | TAMIL NADU | 625020 | ₹2.0 Cr+₹6.2 L (3.14%) | L2 | Rejected-Finance L2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical Technically Disqualified |
| 4 | Rejected-Technical | - | - | Rejected-Technical Technically Disqualified |
| 5 | Rejected-Technical NO 4 ARANMANAI RAMASAMY KOTHANAR WEST STREET RAMANATHAPURAM | RAMANATHAPURAM | TAMIL NADU | 623115 | - | - | Rejected-Technical Technically Disqualified |
Tender Value
Refer Docs
EMD Value
₹2.2 L
Closing Date
21 Jan 2025, 3:00 pmClosed
The Additional Collector (Dev.)
DRDA, Ramanathapuram
08 - NABARD - RIDF XXX/ 2024 - 25 - Strengthening the Road From T.U.Mangai Thiruppullani Road to Vellamaruchikkatti road in Vellamarichukatti Panchayat Km 0/0 - 2/10 in Thiruppullani Block of Ramanathapuram District under NABARD - RIDF - XXX - 2024
2025_RDTN_516127_2
DIPR/5603/Tender/2024
Open Tender
Civil Works - Roads
Item Rate
180 days
DRDA
Please refer Tender documents
4 documents required · 4 mandatory
₹0
₹2.2 L
DRDA, Ramanathapuram
4 Mar 2025
3 Jan 2025
21 Jan 2025
3 Jan 2025
21 Jan 2025
3 Jan 2025
3 Jan 2025
Amount
Part-I Strengthening the Road From T.U.Mangai Thiruppullani Road to Vellamaruchikkatti road in Vellamarichukatti Panchayat Km 0/0 - 2/10
Picking the Existing B.T surface including all labour charges etc complete
Earthwork in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation fo bunds, breaking clods, sectioning etc., compelte.
Providing and Laying Gravel Soling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, water and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire and fuel charges for power roller, water sprinkler and all other incdidental charges such as traffic barricading and providing danger lights etc., complete
Providing and laying 75mm compacted thick WBM Grade II using 1 cum of 75mm to 22.4mm IRC HBG metal and 0.24 cum of Gravel for blindage for 10 Sqm. of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to work site and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel, forming edge bunds, watering with all leads for good water slurrying, rolling and consolidation by power roller and finishing as per MOST 404 (III revision) including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefor and all incidental charges etc., complete for BOTTOM LAYER
Providing and laying 75mm compacted thick WBM Grade III using 1 cum of 63mm to 11.20mm IRC HBG metal and 0.24 cum of Gravel for blindage for 10 Sqm. of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to work site and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel, forming edge bunds, watering with all leads for good water slurrying, rolling and consolidation by power roller and finishing as per MOST 404 (III revision) including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefor and all incidental charges etc., complete for TOP LAYER
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Provision for Road Marking With That Applied Thermo Plastic Compound etc
Hecta metre stone
KM Stone
Providing For Name Board cum Citizen Board
60 cm Equilateral Triangle Cautionary Sign Board
TOE WALL @Ch.0/200 - 1/0
Earth work excavation for foundation in all soils such as red earth ,hard stiff clay soil, stiff black cotton soil, hard redearth,shales, murrams, gravel,hard rock not requiring blasting ete complete.,
Collection and filling of river sand including cost and conveyance to site and all labour charges for filling water and ramming etc., complete for foundation
Cement concrete 1:4:8 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,l aying,curing etc complete.,
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete.,
Cement Concrete 1:3:6 (One Cement, Three M.Sand and Six broken stone jelly) using 40mm size hard broken stone jelly for dummy columns, excluding cost of centering shuttering reinforcement grills and fabrication charges but including curing etc. complete. (Reinforced Cement Concrete 1:2:4 for slab to be extended upto top of splashing with pressed tiles and future extension rods to be embedded in CC 1:3:6 (One Cement, Three M.Sand and Six hard broken stone jelly). Dummy columns should be at least 1 metre height)
TOE WALL @Ch.1/00 - 1/700
Earth work excavation for foundation in all soils such as red earth ,hard stiff clay soil, stiff black cotton soil, hard redearth,shales, murrams, gravel,hard rock not requiring blasting ete complete.,
Collection and filling of river sand including cost and conveyance to site and all labour charges for filling water and ramming etc., complete for foundation
Cement concrete 1:4:8 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,l aying,curing etc complete.,
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete.,
Cement Concrete 1:3:6 (One Cement, Three M.Sand and Six broken stone jelly) using 40mm size hard broken stone jelly for dummy columns, excluding cost of centering shuttering reinforcement grills and fabrication charges but including curing etc. complete. (Reinforced Cement Concrete 1:2:4 for slab to be extended upto top of splashing with pressed tiles and future extension rods to be embedded in CC 1:3:6 (One Cement, Three M.Sand and Six hard broken stone jelly). Dummy columns should be at least 1 metre height)
Towards the charges for routline maintenance of the road work executed under NABARD including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRCSP- 20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost
For the First Year from the date of completion of work
For the Second Year from the date of completion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Suganya Constructions (BID ID -1234081)
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .