| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹76.0 CrAdmitted-Finance | -0.75% | ₹76.0 Cr | L1 | Admitted-Finance |
| 2 | L2₹76.2 Cr+₹19.1 L (0.25%)Admitted-Finance | -0.50% | ₹76.2 Cr+₹19.1 L (0.25%) | L2 | Admitted-Finance |
| 3 | Rejected-Technical C 20A METAL COLONY AMBABARI JAIPUR DIST JAIPUR RAJSTHAN PIN 302023 | JAIPUR | RAJASTHAN | 302023 | - | - | - | Rejected-Technical Technically Non Responsive due to non-compliance with Cl. 12.2 and 26.1 of RFP |
| 4 | Rejected-Technical | - | - | - | Rejected-Technical Technically Non Responsive due to non-compliance with Cl. 12.2 and 26.1 of RFP |
| 5 | Rejected-Technical D O 7 1108 G 1 REVENUE WARD NO 35 MANGAMURU DONKA ONGOLE 532 002 | ONGOLE | PRAKASAM | TELANGANA | 532002 | - | - | - | Rejected-Technical Technically Non Responsive due to non-compliance with Cl. 12.2 and 26.1 of RFP |
Tender Value
₹76.6 Cr
EMD Value
₹76.6 L
Closing Date
6 Jan 2025, 3:00 pmClosed
Superintending Engineer R and B NH Circle Hyde
O o Superintending Engineer R and B NH Circle Hyderabad
Performance Based Maintenance Contract PBMC to Two lane with paved shoulder four lane from existing Km 0.000 to Km 62.920 of ORR to Medak road section of NH 765D in the State of Telangana
2024_MoRTH_838197_1
SE R and B NH HYD 11 2024-25, Dt. 04.12.2024
Open Tender
Civil Works - Highways
Percentage
1825 days
Telangana
As per Tender bid document
5 documents required · 5 mandatory
₹11,800
RPAO MoRTH Hyderabad
₹76.6 L
Hyderabad
30 Jan 2025
5 Dec 2024
7 Jan 2025
5 Dec 2024
6 Jan 2025
5 Dec 2024
5 Dec 2024 - 30 Dec 2024
30 Dec 2024
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | ROUTINE MAINTENANCE (Lump Sum)
[for Total 60 months] | - | lump sum | 19,57,91,580 | - |
| 1.02 | INITIAL RECTIFICATION WORKS (Lump
Sum) [To be completed within 06 months
from the notice to proceed] | - | lump sum | 1,31,95,729 | - |
| 1.03 | PERIODICAL MAINTENANCE WORKS
(Lump Sum) [To be completed as decided by the Engineer but overlay of Highway to be completed within 24/48 months (as the case may be) from the date of notice to proceed]. | - | lump sum | 43,50,05,324 | - |
| 1.04 | EMERGENCY WORKS (Unit Rates) | - | lump sum | 49,15,030 | - |
| 2Total Estimate Cost | |||||
| 3Add-GST @ 18% | |||||
| 4Estimated cost with GST | |||||
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.40 MB
Tenderbiddocument.pdf
Tender Documents • 2.73 MB
BOQ_881003.xls
BOQ • 0.25 MB
BOQ.xls
BOQ • 0.25 MB
Tenderdocument.pdf
Tender Documents • 2.73 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .