| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.1 LAccepted-Finance 160Y 10F POLEPETTAI WEST MEELAVITTAN ROAD THOOTHUKUDI 628002 | TUTICORIN | TAMIL NADU | 628002 | L1 | Accepted-Finance BOQ Accepted | |
| 2 | L2₹2.3 L+₹10,600 (4.93%)Accepted-Finance 4 9 2 ETTAYAPURAM ROAD NEAR A P C MAHALAKSHMI COLLEGE TUTICORIN 2 | L2 | Accepted-Finance BOQ Accepted |
| Sl No | Description | Qty | Unit | VEL ENGINEERING L2 | UNITECH ENGINEERING L1 |
|---|---|---|---|---|---|
| 1.00 | Charges for Leading, lifting, loading and transporting the gear box from Central store/ TTPS to outside work shop. Dismantling the input & output gear coupling, hold pack, top & side covers and taken out the internals, complete cleaning and inspection. Measuring the dimensions in the shafts and matching bore in the body-removing the worn-out bearings & oil seals from the input, output and intermediate shafts and checking the trueness of the shafts. Checking the gear box bottom casing bearing seating areas, metal filling, machining polishing & blue matching. Rectification of hair line crack in the top and bottom cover body by making 'V' groove cutting and metal filling and machining. Thread cleaning the threaded holes in the manual door body, oil drain valve and oil breather cleaning. Spacer rings 6 no's and oil guides machining, removal of oil cooler coils, cleaning the cooler coils and reassembling the oil cooler. Assembling the new pinion gear Third stage, Final gear wheel with hub for existing shaft and new oil seal (free supply of board) in Gearbox. Fabricating the new oil spillage MS plate cover and assembling in position. Assembling of 6 no's of new bearings (free supply of board) in the gear shafts assembling the input pinion, intermediate gear shaft and output gear shaft on the bottom casing, checking the clearance. Checking the zero clearance between bearing and casing, cover hub. Assembling the internals, top casing and checking the clearance and tightening the top casing with bottom casing and checking free rotation of gear box. Trial run testing the overhauled gear box. Full Gearbox body painting (Grey colour) after reconditioning work. Transporting the reconditioned gear box from workshop to TTPS/Store. Including hire charges for T & P’s cost of consumables like painting, fabricating of MS plate, all leading, lifting, transporting, etc complete., | 1 | No. | 2,25,600 ₹2,66,208 | 2,15,000 ₹2,53,700 Lowest |
Tender Value
Refer Docs
EMD Value
₹2,200
Closing Date
21 Sept 2026, 2:00 pmClosed
Chief Engineer/TTPS
O/o CE/TTPS
ECHP-I- Rectification and replacement of worn out pinion gear Third stage, Final gear wheel with hub, oil seal by new and service overhauling of FMG make Gear box ZTNW 1270.
2026_EB_701686_1
CE/TTPS/SE/MI/94/2026-2027
Open Tender
Miscellaneous Works
Works
30 days
TTPS
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹2,200
Yes
25 Sept 2026
5 Sept 2026
22 Sept 2026
5 Sept 2026
21 Sept 2026
5 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Charges for Leading, lifting, loading and transporting the gear box from Central store/ TTPS to outside work shop. Dismantling the input & output gear coupling, hold pack, top & side covers and taken out the internals, complete cleaning and inspection. Measuring the dimensions in the shafts and matching bore in the body-removing the worn-out bearings & oil seals from the input, output and intermediate shafts and checking the trueness of the shafts. Checking the gear box bottom casing bearing seating areas, metal filling, machining polishing & blue matching. Rectification of hair line crack in the top and bottom cover body by making 'V' groove cutting and metal filling and machining. Thread cleaning the threaded holes in the manual door body, oil drain valve and oil breather cleaning. Spacer rings 6 no's and oil guides machining, removal of oil cooler coils, cleaning the cooler coils and reassembling the oil cooler. Assembling the new pinion gear Third stage, Final gear wheel with hub for existing shaft and new oil seal (free supply of board) in Gearbox. Fabricating the new oil spillage MS plate cover and assembling in position. Assembling of 6 no's of new bearings (free supply of board) in the gear shafts assembling the input pinion, intermediate gear shaft and output gear shaft on the bottom casing, checking the clearance. Checking the zero clearance between bearing and casing, cover hub. Assembling the internals, top casing and checking the clearance and tightening the top casing with bottom casing and checking free rotation of gear box. Trial run testing the overhauled gear box. Full Gearbox body painting (Grey colour) after reconditioning work. Transporting the reconditioned gear box from workshop to TTPS/Store. Including hire charges for T & P’s cost of consumables like painting, fabricating of MS plate, all leading, lifting, transporting, etc complete., | 1 | No. | 55 | ₹55 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.21 MB
BOQ_843428.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .