Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹35.5 LAccepted-AOC 1ST FLOOR H NO 165 GALI NO 16 S B S COLONY KARAWAL NAGAR DELHI EAST DELHI DELHI 110094 | NORTH EAST DELHI | DELHI | 110094 | L1 | Accepted-AOC QUOTED AMOUNT IS REASONABLE | |
| 2 | L2₹35.6 L+₹11,741 (0.33%)Rejected-Finance 12 BHARTI AARTIST COLONY VIKAS MARG NEW DELHI 110092 | EAST | DELHI | 110092 | L2 | Rejected-Finance OTHER THAN LOWEST | |
| 3 | L3₹37.6 L+₹2.1 L (5.82%)Rejected-Finance 04 L BLOCK MARKET SECTOR 11 NOIDA 201301 UP GAUTAM BUDHA NAGAR | GAUTAM BUDDHA NAGAR | UTTAR PRADESH | 201301 | L3 | Rejected-Finance OTHER THAN LOWEST | |
| 4 | L4₹37.8 L+₹2.2 L (6.32%)Rejected-Finance | L4 | Rejected-Finance OTHER THAN LOWEST | |
| 5 | L5₹38.3 L+₹2.8 L (7.87%)Rejected-Finance | L5 | Rejected-Finance OTHER THAN LOWEST |
| Sl No | Description | Qty | Unit | R. S. Associates L1 | GEPS PROJECTS L3 | Amit Engineering L7 | J.P. Enterprises L6 | M/s Trade Linker Associates L5 | The new hut furnitures L10 | Vijaypower Generators Limited L2 | national engineering L9 | POONAM ENTERPRISES L8 | SNEH DAVM ENTERPRISES L4 | M/S ADHIKARI CONSTRUCTION CO. L11 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Supply Installation testing and commissioning of retrofit emission control device for 63 kVA diesel generator of any make/vintage Category Application :- Reduce particulate matter (PM 2.5), Carbon Monoxide and Hydrocarbons emitted from Diesel Engine Technology/Type :- ESP (Electrostatic Precipitator), Wet Scrubbing, Diesel Oxides Catalyst Guaranteed specified Particulate matter (PM 2.5) Carbon Monoxide, Hydrocarbon reduction efficiency (Min) Guaranteed specified Particulate matter (PM 2.5) Carbon Monoxide, Hydrocarbon reduction efficiency (Min) 85% for all DG sets TEST REPORTS Certification and installation shall be done through OEM. Device should be ‘Type Approved’ as per the System and Procedure of Central Pollution Control Board for Emission Compliance Testing of Retro-fit Emission Control Devices (RECD) For Diesel Power Generating Set Engines, Dated 01/02/2022, wide Pollution Control Series PCLS/12/2021-22 Adhering to this, RECD to be ‘Type Tested’ for an equivalent kVA family as per the System and Procedure from any one of the four Central Pollution Control Board, Govt, of India, recognized/approved test agencies/laboratories as given below: (which must have type Phase-I approval certificate 2009-14 and type Phase-II approval certificate 2014-25) (a) Automotive Research Association of India (ARAI, Pune)
(b) International Centre for Automotive Testing (ICAT, Manesar) (c) Indian Institute of Petroleum (IIP, Dehradun) (d) Vehicle Research Development Establishment (VRDE, Ahmednagar) (e) Noise certificate from CPCB accredified lab, noise level < 75db (f) RECD device should not mounted on the canopy directly (g) Structure intergrity certificate must have vaild for 12 years (h) Life certificate for 12 years or 40,000 running hours (i) Seller should 3 years work experience certificate performance duty certificate for related work (j) Seller must have submit 2 year operational certificate. Back Pressure due to the Emission Control retrofit device :-
Maximum back pressure exerted by the Emission Control retrofit device at max prescribed load by DG OEM(as per the capacity of the DG set) | 2 | Each Job | 1,52,700 ₹3,05,400 | 2,10,000 ₹4,20,000 | 3,20,000 ₹6,40,000 | 1,50,000 ₹3,00,000 | 1,26,000 ₹2,52,000 Lowest | 2,69,999 ₹5,39,998 | 1,65,777 ₹3,31,554 | 3,56,950 ₹7,13,900 | 3,99,999.99 ₹7,99,999.98 | 1,70,000 ₹3,40,000 | 4,99,999 ₹9,99,998 |
| 2.00General Technical Requirements (GTR) / Commissioning :- a) Emission Control retrofit device shall be complete with safety precautions to ensure no damage should be done to the DG set operations under any circumstances. The Emission Control retrofit device should be closely coupled with the DG exhaust to ensure 100% of the exhaust passes through the Emission Control retrofit device. b) Anti-Vibration mountings shall be provided for complete Emission Control retrofit device in case of flexible coupling with the diesel generator exhaust. c )Emission Control retrofit device should have protection against under voltage, over voltage, under frequency, over frequency, low battery voltage, over current, earth-fault, short circuit, phase sequence change etc. d) The Emission Control retrofit device shall be with corrosion resistive and HR paint. e) Unloading and placement of the Emission Control retrofit device at the time of delivery is in the scope of buyer. The consignee shall ensure that the site is located along a motorable way. f) The seller shall provide the trial run (Testing) of Emission Control retrofit device. The seller shall conduct trial run of the Emission Control retrofit device with the available electrical load at site. The trial run shall be for TWO hours. The electrical loading shall not be more than the rated capacity of the DG set. g) Exhaust piping, extra civil work, distribution board shall be provided by the seller (h) No bypass system should be available in RECD as per CPCB system & process | ||||||||||||||
| 3.00Scope of Installation :- (a) Installation of Retro-fit-emission control equipment when offered by the seller is inclusive in the scope of supply and shall be done by the seller. The installation work of Retro-fit-Emission control equipment and its constituent parts shall be generally conforming to the extent possible , CPWD General Specification for Electrical Works, Part-VII-latest . Foundation for installation of Retro-fit-Emission control equipment if needed, shall be constructed by the seller. Foundation shall be of PCC type with the ratio of 4:2:1. The length and breadth of the foundation shall be 500mm more form the respective length and breadth of the Retro-fit-Emission control equipment. The height of the foundation shall be 200mm, i.e. 100mm below above the ground level. All the materials / labours required for foundation work shall be supplied by the seller. (b) Supply, laying and termination of interconnecting power and control cable between Retro-fit-Emission control equipment and the DG Set control panel shall be done by the seller. The cable supplied shall be ISI marked PVC insulated, armoued cable (FR Grade) with copper conductor having insulation of PVC compound , suitable of rated voltage upto and including 1100 volts. Total length of the cabling shall be within 30 meters . Seller shall provide complete contact details of service engineer to be contacted for free service during the warranty. (c) The Retro-fit-Emission control equipment to be closely coupled with the engine exhaust passes through it. (d) Anti –Vibration mountings is provided for complete Retro-fit- Emission control equipment in case of flexible coupling with the diesel generator exhaust. (e) Retro-fit- Emission control equipment works whenever the DG-Set/Engine is running to reduce/ control particulate matter (PM 2.5) emission. (f) Storage Tank shall be complete with piping (between storage tank and the Retro-fit- Emission control equipment), valves, level indication and all standard accessories. If applicable. (g) Installation and commissioning and the trial run (Testing) Retro-fit- Emission control equipment is carried out by the seller. (h) Installation of Emission Control Retrofit Device when offered by the vendor is inclusive in the scope of supply and shall be done by the seller. The installation work of Emission Control Retrofit Device. (j) Construction of suitable earthing station (if applicable) and necessary connections shall be done by the seller.Warranty/Service ;- 36 months. Number of preventive maintenance visits offered in a year during warranty period :- 4 visits. DELIVERABLES, TIME SCHEDULE. Submission of approach of work / methodology, Drawings and the details of team as per the scope of work :- 30 days. Delivery of Device :- 60 days. Installation, Testing Commissioning at site of retrofit emission control device on existing DG sets :- 180 days (k) Traning & service, maintenance of RECD to staff (l) Serice warranty on 3 Months (i.e. 4 times in a year) warranty certificate for 3 years, (Rate of service should be included in the quoted rate) | ||||||||||||||
| 4.00 | -do- all as above item No-01 but capacity 320 KVA | 2 | Each Job | 5,29,000 ₹10,58,000 Lowest | 5,40,000 ₹10,80,000 | 5,80,000 ₹11,60,000 | 6,00,000 ₹12,00,000 | 6,00,000 ₹12,00,000 | 9,19,999 ₹18,39,998 | 5,30,493 ₹10,60,986 | 8,38,562 ₹16,77,124 | 6,99,999.99 ₹13,99,999.98 | 5,60,000 ₹11,20,000 | 12,99,999 ₹25,99,998 |
| 5.00 | -do- all as above item No-01 but capacity 400 KVA | 1 | Each Job | 6,45,000 ₹6,45,000 | 6,90,000 ₹6,90,000 | 8,80,000 ₹8,80,000 | 7,00,000 ₹7,00,000 | 7,25,000 ₹7,25,000 | 10,49,999 ₹10,49,999 | 6,38,250 ₹6,38,250 | 8,60,025 ₹8,60,025 | 9,99,999.99 ₹9,99,999.99 | 6,10,000 ₹6,10,000 Lowest | 16,99,999 ₹16,99,999 |
| 6.00 | -do- all as above item No-01 but capacity 100 KVA | 1 | Each Job | 2,01,000 ₹2,01,000 | 2,40,000 ₹2,40,000 | 3,20,000 ₹3,20,000 | 2,50,000 ₹2,50,000 | 2,00,000 ₹2,00,000 Lowest | 3,19,999 ₹3,19,999 | 2,15,412 ₹2,15,412 | 4,82,235 ₹4,82,235 | 3,99,999.99 ₹3,99,999.99 | 2,22,000 ₹2,22,000 | 5,99,999 ₹5,99,999 |
| 7.00 | -do- all as above item No-01 but capacity 200 KVA | 3 | Each Job | 3,54,000 ₹10,62,000 | 3,60,000 ₹10,80,000 | 3,20,000 ₹9,60,000 Lowest | 4,00,000 ₹12,00,000 | 3,85,000 ₹11,55,000 | 6,49,999 ₹19,49,997 | 3,39,846 ₹10,19,538 | 5,41,264 ₹16,23,792 | 4,99,999.99 ₹14,99,999.97 | 3,85,000 ₹11,55,000 | 7,99,999 ₹23,99,997 |
| 8.00 | -do- all as above item No-01 but capacity 160 KVA | 1 | Each Job | 2,81,000 ₹2,81,000 | 2,49,000 ₹2,49,000 Lowest | 3,20,000 ₹3,20,000 | 3,00,000 ₹3,00,000 | 3,00,000 ₹3,00,000 | 5,89,999 ₹5,89,999 | 2,98,401 ₹2,98,401 | 4,78,636 ₹4,78,636 | 3,99,999.99 ₹3,99,999.99 | 3,30,000 ₹3,30,000 | 6,99,999 ₹6,99,999 |
Tender Value
₹98.7 L
EMD Value
₹1.7 L
Closing Date
23 Jan 2026, 6:00 pmClosed
CWE DELHI CANTT
HQ CWE DELHI CANTT 110010
INSTALLATION OF RETROFIT EMISSION CONTROL DEVICES FOR IMPROVEMENT OF EMISSION ON DIFFERENT CAPACITIES OF DIESEL GERERATOR SET INSTALLED AT SHAKURBASTI HIRANKUDNA AND ANAND PARBAT UNDER GE (NORTH) DELHI CANTT
2025_MES_746162_1
CWE/D-89/2025-26
Open Tender
Civil Works
Item Rate
180 days
DELHI CANTT
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,000
GE NORTH DELHI CANTT
₹1.7 L
Yes
7 Aug 2026
26 Dec 2025
24 Jan 2026
26 Dec 2025
23 Jan 2026
16 Jan 2026
Supply Installation testing and commissioning of retrofit emission control device for 63 kVA diesel generator of any make/vintage Category Application :- Reduce particulate matter (PM 2.5), Carbon Monoxide and Hydrocarbons emitted from Diesel Engine Technology/Type :- ESP (Electrostatic Precipitator), Wet Scrubbing, Diesel Oxides Catalyst Guaranteed specified Particulate matter (PM 2.5) Carbon Monoxide, Hydrocarbon reduction efficiency (Min) Guaranteed specified Particulate matter (PM 2.5) Carbon Monoxide, Hydrocarbon reduction efficiency (Min) 85% for all DG sets TEST REPORTS Certification and installation shall be done through OEM. The tenderer has to submit a MOU from Automoto Genset Solution LLP/Chakr Innovation Pvt Ltd /Inventive Gas Equipment/ Platino Automative Pvt Ltd. Device should be ‘Type Approved’ as per the System and Procedure of Central Pollution Control Board for Emission Compliance Testing of Retro-fit Emission Control Devices (RECD) For Diesel Power Generating Set Engines, Dated 01/02/2022, wide Pollution Control Series PCLS/12/2021-22 Adhering to this, RECD to be ‘Type Tested’ for an equivalent kVA family as per the System and Procedure from any one of the four Central Pollution Control Board, Govt, of India, recognized/approved test agencies/laboratories as given below: (a) Automotive Research Association of India (ARAI, Pune) (b) International Centre for Automotive Testing (ICAT, Manesar) (c) Indian Institute of Petroleum (IIP, Dehradun) (d) Vehicle Research Development Establishment (VRDE, Ahmednagar): Back Pressure due to the Emission Control retrofit device :- Maximum back pressure exerted by the Emission Control retrofit device at max prescribed load by DG OEM(as per the capacity of the DG set)
General Technical Requirements (GTR) / Commissioning :- a) Emission Control retrofit device shall be complete with safety precautions to ensure no damage should be done to the DG set operations under any circumstances. The Emission Control retrofit device should be closely coupled with the DG exhaust to ensure 100% of the exhaust passes through the Emission Control retrofit device. b) Anti-Vibration mountings shall be provided for complete Emission Control retrofit device in case of flexible coupling with the diesel generator exhaust. c )Emission Control retrofit device should have protection against under voltage, over voltage, under frequency, over frequency, low battery voltage, over current, earth-fault, short circuit, phase sequence change etc. d) The Emission Control retrofit device shall be with corrosion resistive and HR paint. e) Unloading and placement of the Emission Control retrofit device at the time of delivery is in the scope of buyer. The consignee shall ensure that the site is located along a motorable way. f) The seller shall provide the trial run (Testing) of Emission Control retrofit device. The seller shall conduct trial run of the Emission Control retrofit device with the available electrical load at site. The trial run shall be for TWO hours. The electrical loading shall not be more than the rated capacity of the DG set. g) Exhaust piping, extra civil work, distribution board shall be provided by the seller (h) No bypass system should be available in RECD as per CPCB system & process
Scope of Installation :- (a) Installation of Retro-fit-emission control equipment when offered by the seller is inclusive in the scope of supply and shall be done by the seller. The installation work of Retro-fit-Emission control equipment and its constituent parts shall be generally conforming to the extent possible , CPWD General Specification for Electrical Works, Part-VII-latest . Foundation for installation of Retro-fit-Emission control equipment if needed, shall be constructed by the seller. Foundation shall be of PCC type with the ratio of 4:2:1. The length and breadth of the foundation shall be 500mm more form the respective length and breadth of the Retro-fit-Emission control equipment. The height of the foundation shall be 200mm, i.e. 100mm below above the ground level. All the materials / labours required for foundation work shall be supplied by the seller. (b) Supply, laying and termination of interconnecting power and control cable between Retro-fit-Emission control equipment and the DG Set control panel shall be done by the seller. The cable supplied shall be ISI marked PVC insulated, armoued cable (FR Grade) with copper conductor having insulation of PVC compound , suitable of rated voltage upto and including 1100 volts. Total length of the cabling shall be within 30 meters . Seller shall provide complete contact details of service engineer to be contacted for free service during the warranty. (c) The Retro-fit-Emission control equipment to be closely coupled with the engine exhaust passes through it. (d) Anti –Vibration mountings is provided for complete Retro-fit- Emission control equipment in case of flexible coupling with the diesel generator exhaust. (e) Retro-fit- Emission control equipment works whenever the DG-Set/Engine is running to reduce/ control particulate matter (PM 2.5) emission. (f) Storage Tank shall be complete with piping (between storage tank and the Retro-fit- Emission control equipment), valves, level indication and all standard accessories. If applicable. (g) Installation and commissioning and the trial run (Testing) Retro-fit- Emission control equipment is carried out by the seller. (h) Installation of Emission Control Retrofit Device when offered by the vendor is inclusive in the scope of supply and shall be done by the seller. The installation work of Emission Control Retrofit Device. (j) Construction of suitable earthing station (if applicable) and necessary connections shall be done by the seller.Warranty/Service ;- 12 months. Number of preventive maintenance visits offered in a year during warranty period :- 2 visits. DELIVERABLES, TIME SCHEDULE. Submission of approach of work / methodology, Drawings and the details of team as per the scope of work :- 30 days. Delivery of Device :- 60 days. Installation, Testing Commissioning at site of retrofit emission control device on existing DG sets :- 180 days (k) Traning & service, maintenance of RECD to staff
-do- all as above item No-01 but capacity 320 KVA
-do- all as above item No-01 but capacity 400 KVA
-do- all as above item No-01 but capacity 100 KVA
-do- all as above item No-01 but capacity 200 KVA
-do- all as above item No-01 but capacity 160 KVA
stage.html
html • 0.08 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.36 MB
BOQ_835505.xls
BOQ • 0.29 MB
TENDERDOCUMENTSD89.pdf
Tender Documents • 1.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .