Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.8 CrAdmitted-Finance | ₹1.8 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.3 Cr+₹49.4 L (27.8%)Admitted-Finance | ₹2.3 Cr+₹49.4 L (27.8%) | L2 | Admitted-Finance |
| 3 | L3₹2.7 Cr+₹90.3 L (50.8%)Admitted-Finance | ₹2.7 Cr+₹90.3 L (50.8%) | L3 | Admitted-Finance |
| 4 | L4₹3.3 Cr+₹1.6 Cr (88.4%)Admitted-Finance 224 KAILASH NAGAR SHOBHAPUR COLONY DISTRICT BETUL MADHYA PRADESH PIN 460449 | BETUL | MADHYA PRADESH | 460449 | ₹3.3 Cr+₹1.6 Cr (88.4%) | L4 | Admitted-Finance |
| 5 | L5₹3.5 Cr+₹1.7 Cr (97.4%)Admitted-Finance 224 KAILASH NAGAR SHOBHAPUR COLONY DISTRICT BETUL MADHYA PRADESH PIN 460449 | BETUL | MADHYA PRADESH | 460449 | ₹3.5 Cr+₹1.7 Cr (97.4%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | kamlesh singh L3 | M/S TIRUPATI CONSTRUCTION CO L4 | Ms.tirupati Construction Company L5 | MAHESHWARI ROADLINES L1 | BAGHEL BROTHERS L6 | n chaurasia associates L2 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Ash Excavation and Loading :- Excavation and loading of ash from ash dyke in vechicle, including construction and maintanence of temporary roads on ash dyke, by mechanical means including prevention of fugitive emission of area complete including all leads and lifts, all other incidental charges such as water sprinkling, cost of labour, equipment and material etc. complete as per specifications, drawing and direction of Engineer-in-charge and guidelines of MoEF&CC/MPPCB for ash handling.
(Note:- In case ash is proivded from ash silo by MPPGCL, no payment towards this item will be made.) | 38,684 | CuM | 11,60,520 ₹13,69,413.6 | 9,67,100 ₹11,41,178 Lowest | 13,53,940 ₹15,97,649.2 | 11,60,520 ₹13,69,413.6 | 19,34,200 ₹22,82,356 | 14,69,992 ₹17,34,590.56 |
| 2.00 | Transportation and Unloading :-
Transportation of ash from ash dyke in closed/covered container or any other methods to prevent air pollution during transportation from ash pond to abandoned mine/area/near village- Cholna, Tehsil Jaithary, Distt. Anuppur including unloading, watering if required during unloading of ash through sprinklers or other means to prevent fugitive emission of ash. All works are to be carried out as per norms of MOEF, MP Pollution control Board and GoMP. Quoted rates must be inclusive of cost of labour, equipment and material etc. required to complete the work in all respect as directed by Engineer-in-Charge. Total lead of 46.98 KM. | 38,684 | CuM | 2,04,63,836 ₹2,29,19,496.32 | 2,51,44,600 ₹2,81,61,952 | 2,61,11,700 ₹2,92,45,104 | 1,31,52,560 ₹1,38,10,188 Lowest | 2,63,05,120 ₹2,94,61,734.4 | 1,65,18,068 ₹1,85,00,236.16 |
| 3.00 | Filling and Compaction of Ash i/c dozing:- Ash work in filling with dozing and compacting by mechanical means to achieve maximum in–situ dry density 95% of MDD of the material found out as per I.S. 2720 (Part VII) at OMC, by use of suitable vibratory rollers with static weight 6 to 10 tonnes or as required., as per relevant specifications, including cleaning of area (where ash filiing is to be done) by uprooting of all type of vegetation, grass, bushes, sapling etc. by any means and stripping of top layer of minimum 150 mm or to such depth as decided by the Engineer in charge, depending upon the quality of ash to be used in forming ash filling etc. The work shall include disposal of all unsuitable material and stacking of suitable earth/soil (to be used later for top soil cover over ash fill) outside the working zone/area, dewatering, all man and machinery, providing barricading/ fencing/ green dust net, suitable dust supression system to prevent fugitive dust emmision, construction of temporary approach/ haul road etc. complete with all leads and lifts as per tender specifications/ drawings and direction of Engineer-in-charge and compliance of relevant guide lines/ specifications of MoEF&CC /MPPCB for fly ash handling and filling in low lying areas. | 38,684 | CuM | 8,51,048 ₹10,04,236.64 | 17,40,780 ₹20,54,120.4 | 17,79,464 ₹20,99,767.52 | 15,47,360 ₹18,25,884.8 | 73,49,960 ₹86,72,952.8 | 7,34,996 ₹8,67,295.28 Lowest |
| 4.00 | Earth cover :- Providing and supplying of sweet soil consisting of sandy loam from approved external borrows areas and /or useful stacked material obtained from stripping. The soil should be free of admixture of stiff clay, refuse, stumps, roots, rock, bushes, weeds or any other material which would be detrimental to the proper development of vegetation growth. The earth cover material shall not contain stone of size 25 mm and over. The loamy top soil shall be of healthy for crops, grass or other plant growth, that is of good quality and reasonably free draining. Earth cover shall be laid in layers of maximum compacted thickness of 300 mm including cost of all materials, machinery, labour and dressing, all other operations such as collection of soil, spreading soil in layer of specified thickness, sorting out, breaking clods, levelling, sectioning edges / sides, watering, compacting to achieve maximum in–situ dry density 95% of MDD at OMC of the material found out as per IS 2720 (Part VII) using suitable machinary, such as, sheep foot roller/vibratory compactors, all leads and lift etc. complete as per tender specification, drawing and as directed by the Engineer-in-charge as per relevant guide lines of MoEF&CC/ MPPCB for ash filling in low lying area. | 9,027 | CuM | 12,13,048.26 ₹14,31,396.94 | 13,54,050 ₹15,97,779 | 13,63,077 ₹16,08,430.86 | 4,51,350 ₹5,32,593 Lowest | 19,94,967 ₹23,54,061.06 | 12,18,645 ₹14,38,001.1 |
| 5.00 | Excavation in all type of soil/hard moorum with 100 m lead and 1.50 m lift with dressing as per direction of Engineer-in-charge. | 40 | CuM | 40,000 ₹47,200 | 10,000 ₹11,800 | 10,040 ₹11,847.2 | 7,200 ₹8,496 | 52,400 ₹61,832 | 2,000 ₹2,360 Lowest |
| 6.00 | Providing and placing in position cement concrete 1:3:6 i/c scaffolding from work, dewatering vibration, curing, cost, of all material labour transportation etc complete i/c all as per direction of Engineer-in-charge. | 6.6 | CuM | 6,600 ₹7,788 Lowest | 29,700 ₹35,046 | 30,360 ₹35,824.8 | 34,320 ₹40,497.6 | 99,528 ₹1,17,443.04 | 25,080 ₹29,594.4 |
| 7.00 | Supplying & laying in position random rubble masonary (uncoursed) of various sizes in works at all levels in cement sand mortar of 1:6 by volume i/c mixing mortar, laying stones, racking out points, scaffolding, curing all labour material equipment, T&P leads& lift with provision of weep holes testing etc. all complete as per specification drawing & instruction of Engineer-in-charge. | 72 | CuM | 18,000 ₹21,240 Lowest | 3,96,000 ₹4,67,280 | 3,96,000 ₹4,67,280 | 1,51,200 ₹1,78,416 | 3,60,000 ₹4,24,800 | 1,03,680 ₹1,22,342.4 |
| 8.00 | Providing weep holes in brick masonary/plain/reinforced cement concrete abutment, wing wall/retaining wall with 100mm dia AC pipe, extending through the full widthof the structure with slope 1V: 20H towards toe etc. complete as per drawing and technical specification and direction of Engineer-in-charge. | 50 | RM | 5,000 ₹5,900 Lowest | 15,000 ₹17,700 | 15,000 ₹17,700 | 7,500 ₹8,850 | 50,000 ₹59,000 | 13,500 ₹15,930 |
| 9.00 | Providing and lying filter media with granular materials/stone crushed aggregates satisfying the requirments laid down in clause 25.04.2022 of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the wall and provided behind entire surface abutment return wall and wing wall to the full height compacted to a firm condition complete as per drawing and technical specification. | 1.5 | CuM | 1,800 ₹2,124 | 2,250 ₹2,655 | 2,400 ₹2,832 | 1,800 ₹2,124 | 39,000 ₹46,020 | 1,650 ₹1,947 Lowest |
Tender Value
₹1.9 Cr
EMD Value
₹2 L
Closing Date
13 Dec 2023, 3:00 pmClosed
CE (GEN)
CE(GEN),ATPS ,CHACHAI
Work contract for ATPS Chachai Supply and filling of Ash in the unused/ abandoned open mines located near village-Cholna, Tehsil Jaithari, Distt - Anuppur (M.P.) including other related works required as per MPPCB norms.
2023_MPPGC_316090_1
193/civil
Open Tender
Miscellaneous Works
Item Rate
180 days
ATPS Chachai
As per NIT
16 documents required · 16 mandatory
₹5,000
Yes
₹2 L
Yes
28 Dec 2023
10 Oct 2023
15 Dec 2023
10 Oct 2023
13 Dec 2023
10 Oct 2023
Ash Excavation and Loading :- Excavation and loading of ash from ash dyke in vechicle, including construction and maintanence of temporary roads on ash dyke, by mechanical means including prevention of fugitive emission of area complete including all leads and lifts, all other incidental charges such as water sprinkling, cost of labour, equipment and material etc. complete as per specifications, drawing and direction of Engineer-in-charge and guidelines of MoEF&CC/MPPCB for ash handling. (Note:- In case ash is proivded from ash silo by MPPGCL, no payment towards this item will be made.)
Transportation and Unloading :- Transportation of ash from ash dyke in closed/covered container or any other methods to prevent air pollution during transportation from ash pond to abandoned mine/area/near village- Cholna, Tehsil Jaithary, Distt. Anuppur including unloading, watering if required during unloading of ash through sprinklers or other means to prevent fugitive emission of ash. All works are to be carried out as per norms of MOEF, MP Pollution control Board and GoMP. Quoted rates must be inclusive of cost of labour, equipment and material etc. required to complete the work in all respect as directed by Engineer-in-Charge. Total lead of 46.98 KM.
Filling and Compaction of Ash i/c dozing:- Ash work in filling with dozing and compacting by mechanical means to achieve maximum in–situ dry density 95% of MDD of the material found out as per I.S. 2720 (Part VII) at OMC, by use of suitable vibratory rollers with static weight 6 to 10 tonnes or as required., as per relevant specifications, including cleaning of area (where ash filiing is to be done) by uprooting of all type of vegetation, grass, bushes, sapling etc. by any means and stripping of top layer of minimum 150 mm or to such depth as decided by the Engineer in charge, depending upon the quality of ash to be used in forming ash filling etc. The work shall include disposal of all unsuitable material and stacking of suitable earth/soil (to be used later for top soil cover over ash fill) outside the working zone/area, dewatering, all man and machinery, providing barricading/ fencing/ green dust net, suitable dust supression system to prevent fugitive dust emmision, construction of temporary approach/ haul road etc. complete with all leads and lifts as per tender specifications/ drawings and direction of Engineer-in-charge and compliance of relevant guide lines/ specifications of MoEF&CC /MPPCB for fly ash handling and filling in low lying areas.
Earth cover :- Providing and supplying of sweet soil consisting of sandy loam from approved external borrows areas and /or useful stacked material obtained from stripping. The soil should be free of admixture of stiff clay, refuse, stumps, roots, rock, bushes, weeds or any other material which would be detrimental to the proper development of vegetation growth. The earth cover material shall not contain stone of size 25 mm and over. The loamy top soil shall be of healthy for crops, grass or other plant growth, that is of good quality and reasonably free draining. Earth cover shall be laid in layers of maximum compacted thickness of 300 mm including cost of all materials, machinery, labour and dressing, all other operations such as collection of soil, spreading soil in layer of specified thickness, sorting out, breaking clods, levelling, sectioning edges / sides, watering, compacting to achieve maximum in–situ dry density 95% of MDD at OMC of the material found out as per IS 2720 (Part VII) using suitable machinary, such as, sheep foot roller/vibratory compactors, all leads and lift etc. complete as per tender specification, drawing and as directed by the Engineer-in-charge as per relevant guide lines of MoEF&CC/ MPPCB for ash filling in low lying area.
Excavation in all type of soil/hard moorum with 100 m lead and 1.50 m lift with dressing as per direction of Engineer-in-charge.
Providing and placing in position cement concrete 1:3:6 i/c scaffolding from work, dewatering vibration, curing, cost, of all material labour transportation etc complete i/c all as per direction of Engineer-in-charge.
Supplying & laying in position random rubble masonary (uncoursed) of various sizes in works at all levels in cement sand mortar of 1:6 by volume i/c mixing mortar, laying stones, racking out points, scaffolding, curing all labour material equipment, T&P leads& lift with provision of weep holes testing etc. all complete as per specification drawing & instruction of Engineer-in-charge.
Providing weep holes in brick masonary/plain/reinforced cement concrete abutment, wing wall/retaining wall with 100mm dia AC pipe, extending through the full widthof the structure with slope 1V: 20H towards toe etc. complete as per drawing and technical specification and direction of Engineer-in-charge.
Providing and lying filter media with granular materials/stone crushed aggregates satisfying the requirments laid down in clause 25.04.2022 of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the wall and provided behind entire surface abutment return wall and wing wall to the full height compacted to a firm condition complete as per drawing and technical specification.
n chaurasia associates
kamlesh singh
M/S TIRUPATI CONSTRUCTION CO
Ms.tirupati Construction Company
BAGHEL BROTHERS
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.94 MB
Technicalbid316090.xls
Tender Documents • 1.48 MB
Schedule2023316090.pdf
Tender Documents • 0.80 MB
SBD316090.pdf
Tender Documents • 3.39 MB
BOQ_371797.xls
BOQ • 0.29 MB
DetailsofBidder316090.pdf
Additional Documents • 0.04 MB
checklistannexureXV316090.pdf
Additional Documents • 0.56 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .