| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance D NO 271D3 5 ANDAL PLOT NO 30 N0 76 DHARANI SQUARE PERAMANUR VILLAGE MARAMALI NAGAR CHENGALPATTU KANCHIPURAM 603 209 | CHENGALPATTU | KANCHIPURAM | TAMIL NADU | 603209 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance NO 172 VAZHAPANTAL ROAD STREET MAMBAKKAM ARCOT TALUK VELLORE DIST 632 318 | MAMBAKKAM | ARCOT TALUK | TAMIL NADU | 632318 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance 19B CHIDAMBARANATHAPURAM DEVAKOTTAI SIVAGANGAI DISTRICT | PUDUKKOTTAI | TAMIL NADU | 621308 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | Admitted-Fee/PreQual/Technical/Finance MIG 354 4TH CROSS STREET MOGAPPAIR ERI SCHEME CHENNAI 37 | CHENNAI | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
EMD Value
₹21,500
Closing Date
6 Jul 2021, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE/GCC-I/CHENNAI
A-10, Thiru-Vi-Ka Industrial Estate, Guindy, Chennai-32
as per NIT
2021_EB_204284_1
OT-010/21-22 of SE/GCC-I/CNI
Open Tender
Civil Works
Works
120 days
Korattur
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹21,500
Yes
7 Jul 2021
30 Jun 2021
7 Jul 2021
30 Jun 2021
6 Jul 2021
30 Jun 2021
90 days
Amount
Labour Charges for conducting check survey, pegging, marking of pits for tower foundation as per the apporved profile including chaining and carring theodolite instrument, measuring span length and pit marking including cost of all men and materials as directed by Department Engineer at site.
Levelling the site and removing scrub jungles and earth by Engaging JCB on hourly basis including cost of all materials labour, lead & lift etc., complete.
Providing shoring and shuttering with either country wood planks and scantlings or steel sheets and props for the excavation of pits for tower foundation wherever necessary as directed by the Board Engineer due to caving of sides on account of ground water seepage including cost of dewatering using with 5HP motor, transport T&Ps , fuel charges, labour lead lift, etc., complete as directed by the department engineer at site.
Earth work excavation soil and depositing on bank with initial lead of 10m and lift of 2m in Hard gravelly soil, stiff clay, block cotton,gravel, stoney earth and earth mixed with small size boulder etc., complete including cost of all materials lead lift etc complete as directed by the department engineer at site.
Earth work excavation soil and depositing on bank with initial lead of 10m and lift of 2m in Soft Disintegrated Rock requiring blasting 10% including cost of all materials lead lift etc complete
Labour charges for transporting and assembling of template and shifting the template from location to location and reassambling the same including cost of all labour, transport, lead, lift, etc., complete as directed by the department engineer at site. (The template will be make own arrangement by the contractor)
Providing and laying P.C.C 1:2:4 using 12-20mm HBG stone for foundation and chiminey concrete with form work using steel centering for soffits of reinforced cement concrete slabs or plain surfaces including stutting up to 3m high, using M.S. Sheets of size 90cm x 60cm. and 'B.G.10' guage, stiffened with welded M.S. angle of size 25mm x 25mm x 3mm laid over silver oak (Country wood) joists of size 10cm x 6.5cm. (spaced at about 90 cm c/c) and supported by casurina props of 10cm to 13cm. dia (spaced at 75cm c/c) complying with standard specification including cost of all materials,transport, curing, labour, lead, lift etc. complete.as per standard specification as directed by the dept. Engineer at site.
Labour charges for bailing out of water by using pumpset including the cost of heir charges for diesel pumpset 0.5HP, labour fuel charges, transport, T & P, lead, lift ect., complete as directed by the department engineer at site.
Labour charges for Filling of pits with local available earth brought out from outside including charges for spreading watering, consolidation in 150 mm thick and spread balance earth around the location as per standard specification and as directed by the engineer at site including all labour, transport charges, lead and lift etc., complete.
Supplying and providing Pipe type earthing with 40 mm dia GI pipe (medium class) as per specification and as direct by the site engineer including cost of all meterials, cutting of earth wire to the required length and connecting to the tower leg and earth pipe with 2 Nos. bolts, nuts, with washers, drilling charges etc., complete as per specification and as directed by the department engineer at site.
Labour charge for transporting and erection of tower parts including sorting out of tower parts at stores and site, rectification in tower parts if any, cost of T&P, labour, transport from stores, lead, lift, etc., complete as directed by the department engineer at site. Under LC Condition
Labour charges for Transporting and hoisting of 13 units single suspension insulators with fittings from store to site including cost of all labour, transport, lead, lift, etc., complete as directed by the department engineer at site. Under LC Condition
Labour charges for Transporting and hoisting of 2x14 units single tension insulators with fittings from store to site including cost of all labour, transport, lead, lift, etc., complete as directed by the department engineer at site. Under LC Condition
Labour charges for transporting and paying out of 6 Nos. of Zebra conductor with fittings including sorting out of conductor, providing trussels of 30.0m intervals for paying out of conductors, according to drum schedule and loading and unloading at site providing trussels cost of T&P lead and lift etc., complete.
labour charges for stringing of 6 Nos Zebra conductor rough sagging tensioning to correct sag and fixing to towers as per specification with fittings cost of T&P lead and lift, etc., complete as directed by the department engineer at site. Under LC Condition.
labour charges for paying out of 1 no. GI 7/3.55 mm SWG steel earth wire with fittings cost of loading and unloading, transporting, sorting out of drums at store and at site according to drum schedule, providing trestle, paying out, etc., complete as directed by the department engineer at site.
labour charges for stringing of 1 no. GI 7/3.55 mm earth wire rough sagging tensioning to correct sag and fixing to towers as per specification as directed by the department engineer at site clipping, jumpering, labour charges for fixing midspan compression joints, repair sleeves, wherever required and vibration dampers in all tensio location as directed by the boad and other charges with fittings cost of T&P required for the entire safe operation for stringing work labour, lead, lift, etc., complete .
Labour charges for painting tower legs using best qulity anticorroessive black paint two coats 1 m above coping including cost of all materials, labour, transport, lead, lift etc., complete as directed by the department engineer at site.
Providing and laying P:C:C 1:2:4 using 20mm HBG metal for muffing and coping with form work using steel centering for soffits of reinforced cement concrete slabs or plain surfaces including stutting up to 3m high, using M.S. Sheets of size 90cm x 60cm. and 'B.G.10' guage, stiffened with welded M.S. angle of size 25mm x 25mm x 3mm laid over silver oak (Country wood) joists of size 10cm x 6.5cm. (spaced at about 90 cm c/c) and supported by casurina props of 10cm to 13cm. dia (spaced at 75cm c/c) complying with standard specification including cost of all materials, transport, curing, labour, lead, lift etc. complete.as per standard specification as directed by the dept. Engineer at site.
Labour charges for fixing, painting Number board 200 mm X 200 mm with one coat red oxide and two coat enamel paint for back ground lettering with enamel paint of approved colour fixing in tower including cost of all materials, labour, T&P, transport, lead, lift, etc., complete as directed by the department engineer at site.
Fabrication supply, fixing and painting phase plate (Set of three) 20 mm dia with one coat red oxide and two coat enamel paint for back ground lettering with enamel paint of approved colour fixing in tower including cost of all materials, labour, T&P, transport, lead, lift, etc., complete as directed by the department engineer at site.
Labour charges for fixing, painting Danger Board 100 mm x 500 mm with one coat red oxide and two coat enamel paint for back ground lettering with enamel paint of approved colour fixing in tower including cost of all materials, labour, T&P, transport, lead, lift, etc., complete as directed by the department engineer at site.
Labour charges for fixing, painting Name board 1500 mm x 600 mm (Circuit Name) with one coat red oxide and two coat enamel paint for back ground lettering with enamel paint of approved colour fixing in tower including cost of all materials, labour, T&P, transport, lead, lift, etc., complete as directed by the department engineer at site.
Labour charges for dismantling of 6 nos. Zebra conductor with fittings and devoluted to stores including cost of loading, unloading, T&P, labour, transport, lead, lift etc., complete as directed by the department engineer at site. Under LC Condition
Labour charges for dismantling of 6 nos. panther conductor with fittings and devoluted to stores including cost of loading, unloading, T&P, labour, transport, lead, lift etc., complete as directed by the department engineer at site.
Labour charges for dismantling and lowering the existing GI earth wire with fittings and devoluted to stores including cost of loading, unloading, T&P, labour, transport, lead, lift etc., complete as directed by the department engineer at site.
Labour charges for dismantling the existing 14 unit 120 KN insulator with fittings and devoluted to stores including cost of loading, unloading, T&P, labour, transport, lead, lift etc., complete as directed by the department engineer at site. Under LC Condition
Labour charges for dismantling the existing 8 unit 120 KN insulator with fittings and devoluted to stores including cost of loading, unloading, T&P, labour, transport, lead, lift etc., complete as directed by the department engineer at site. Under LC Condition
Labour charges for dismantling the existing 7 unit 90 KN Suspension insulator with fittings and devoluted to stores including cost of loading, unloading, T&P, labour, transport, lead, lift etc., complete as directed by the department engineer at site. Under LC Condition
Labour charges for dismantling of tower parts carefully with good condition to re-use for other works and devoluted to stores including cost of loading, unloading, T&P, labour, transport, lead, lift etc., complete as directed by the department engineer at site. Under LC condition
GST for bidders within TamilNadu
GST for bidders outside TamilNadu (IGST)
ULTRAPOWER BUILDERS
MK DHANALAKSHMI ENGINEERING PRIVATE LIMITED
Dillibabu
PERUMAL.S.K
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .