Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹58.5 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹59.7 L+₹1.2 L (2.12%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹60.4 L+₹1.9 L (3.27%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | Not Admitted-Fee/PreQual/Technical/Finance | - | Not Admitted-Fee/PreQual/Technical/Finance Others-NIT Clause 9 Point No.6 not followed | ||
| 5 | Not Admitted-Fee/PreQual/Technical/Finance | - | Not Admitted-Fee/PreQual/Technical/Finance Others-name of work not mentioned treasury challan |
Tender Value
₹59.2 L
EMD Value
₹1.2 L
Closing Date
30 Sept 2026, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
Xen Handwara
Construction of Grading and Sorting Hall at Fand V Market Handwara
2026_PWDJK_325950_1
NIT NO 38 OF 2026-27
Open Tender
Civil Works
Percentage
120 days
Fruit mandi
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,600
Yes
Executive Engineer Handwara
₹1.2 L
Yes
12 Oct 2026
25 Sept 2026
1 Oct 2026
25 Sept 2026
30 Sept 2026
25 Sept 2026
120 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in bulk excavation by mechanical means(hydraulicexcavator) over areas (exceeding30cmindepth,1.5minwidthaswellas10m2onplan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, in All kinds of soil. | 63.47 | cum | 187 | ₹11,868.89 |
| 2 | Providing and laying of stone soling/boulders (Hand Packed) including ramming, dressing and watering and carriage up to site. | 26.18 | cum | 850 | ₹22,253 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering. All work up to plinth level. 1:4:8 (1 cement: 4 coarse sand: 8 graded stone aggregate 40mm nominal) crushed incl all carriages | 27.14 | cum | 5,552 | ₹1,50,681.28 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering. All work up to plinth level. 1:2:4 (1 cement: 2 coarse sand: 4 graded stone aggregate20mm nominal) crushed incl all carriages | 26.3 | cum | 6,900 | ₹1,81,470 |
| 5 | Providing and laying in position specified grade of reinforced cement concrete including
curing but excluding the cost of centering, shuttering, finishing and reinforcement. All
works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 29.8 | cum | 8,138 | ₹2,42,512.4 |
| 6 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, slabs,chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) incl all carriages | 50 | cum | 10,171 | ₹5,08,550 |
| 7 | Reinforced cement concrete work in walls (any thickness) including attached pilasters,
buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and
struts upto floor five level including curing but excluding cost of centering shuttering,
finishing and reinforcement. 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 9.2 | cum | 9,745.7 | ₹89,660.44 |
| 8 | Reinforcement of R.C.C work including straightening, cutting, bending, placing in position and binding all complete with TMT Bars. | 89.8 | qtl | 12,320 | ₹11,06,336 |
| 9 | Centering and Shuttering including strutting and propping etc and including removal of same . | - | - | - | - |
| 10 | Foundations, footings, bases of columns etc. for mass concrete. | 250 | Sqm | 286.35 | ₹71,587.5 |
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.70 MB
BOQ_1101956.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .