Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance 122 SAMHARIYA ASOPUR TANDA AMBEDKAR NAGAR UTTAR PRADESH 224190 | AMBEDKAR NAGAR | UTTAR PRADESH | 224190 | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical No EMD or Fee received |
| 4 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical No EMD or Fee received |
| 5 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical No EMD or Fee received |
Tender Value
₹20 L
EMD Value
₹40,000
Closing Date
9 Sept 2024, 5:00 pmClosed
SE CIVIL JVVNL,
SE CIVIL JVVNL, NEAR GOVT. COLLEGE, NAYAPURA, KOTA
Misc. remaining works for RCC retaining wall and other civil works at 33 KV S/S Patoli under AEN (O and M) Uniara.
2024_JVVNL_416895_3
E-NIT 08/2024-25
Open Tender
Civil Works
Percentage
120 days
Uniara.
Please refer Tender documents.
3 documents required · 3 mandatory
₹590
AO O and M JPD TONK, PROCESSING FEE MD RISL JAIPUR
₹40,000
Yes
12 Sept 2024
4 Sept 2024
11 Sept 2024
4 Sept 2024
9 Sept 2024
4 Sept 2024
Amount
Earth work in filling of excavated earth except black cotton soil with watering consolidation & compaction of spreaded earth in 15-30cm layers levelled & neatly dressed as per requirement of site & direction of Engineer in charge. Work includes cost of earth with taxes, loading, unloading, transportation, labour, water & T&P etc. complete with all lead & lift.
Supply, stacking, spreading & hand ramming of quarry rubbish in layer not exceeding 15cm (loose) incl. all lead & lift, transportation, loading, unloading with water & hand ramming with labour incl. T&P, machinery, water etc. complete in all respect finishing in laying, level and camber as per direction of Engineer in charges.
Supply of different varities of tree plants at site including loading/ unloading & transportation etc. digging of pits in ordinary soil of size 60cm x 60cm deep & refilling the same with the excavated earth mixed with manure in the ratio of 2:1 by volume (2 parts of stacked volume ofearth after reduction by 20% parts of stacked volume of earth after reduction by 8% flooding with water & dressing including removal of surplus earth (including cost of manure and maintenance of plants (only live plants after the expiry of six month/work period from the date of plantation are to be measured for payment).
Shiv Construction Company
Shiv Construction Company
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .