Tender Value
₹13.2 Cr
EMD Value
₹13.2 L
Closing Date
20 Aug 2026, 5:00 pm
Chief Engineer Buildings and Bridges
O/o of the EIC Rural Works Odisha Bhubaneswar
Construction of H.L. Bridge over Local Nallah at 2.00 Km on Baragon to Damjhar Road in the District of Nuapada.
2026_CERWI_137600_1
Online 01/2026-27 (Bridge)
National Competitive Bid
Civil Works - Bridges
Percentage
450 days
Nuapada
2 documents required · 2 mandatory
₹10,000
₹13.2 L
Yes
31 Jul 2026
31 Jul 2026
21 Aug 2026
31 Jul 2026
20 Aug 2026
31 Jul 2026
31 Jul 2026 - 19 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation for bridge works in all kinds of soil, by mechanical means utilising the surplus earth locally for road work where ever required, back filling the excavated earth to the extent required complete in all respect as per approved drawing and technical specifications as per Section 900 and Clause 301 & 304 of MoRT&H Specifications for Road & Bridge works (5th Revision) & including cost of all labour, T&P, royalty etc complete and as per direction of the Engineer-in-Charge. | 1,548.63 | cum | 311.55 | ₹4,82,475.68 |
| 2 | Providing , fitting, fixing and placing in position steel cutting edge including cost of steel etc required as per approved drawing and technical specifications as per Section 1200 & 1900 of MoRT&H Specifications for Road & Bridge works (5th Revision) and as per direction of the Engineer-in-charge. | 619.75 | qtl | 11,731.49 | ₹72,70,589.69 |
| 3 | Providing all machineries , labour, T&P & sinking of single circular well of specified external diameter through all types of soil / rock as specified below as shown against each case complete as per drawing & technical specification section 1200 of MoRT&H Specifications for Road & Bridge works (5th Revision) and as per direction of the Enginer-in charge. (Depth of sinking is reckoned from bed level. 1) In all kinds of soil (Upto 10m. Depth) a) For 7.50m dia abutment & Pier wells | 27 | rm | 28,422.79 | ₹7,67,415.33 |
| 4 | 2) Sinking of R.C.C well sinking in soft rock (Non coring)/ Boulder/ Hard Soil )(wherein SPT>100) to lines levels & plum by scooping out from inside and below the steining including cost of hire and running charges of tools and plants and supplying & working of pumps bailing out of water and removal of all materials and obstacle from inside the well by divers etc. including precaution against shifting and lifting disposal of the soil with all leads and lift etc. complete as directed by the Engineer-in-charges. a) For 7.50m dia abutment & Pier wells | 18 | rm | 1,25,849.05 | ₹22,65,282.9 |
| 5 | Construction of R.C.C well sinking in soft rock to lines levels & plumb by scooping out from inside and below the steining including cost of hire and running charges of tools and plants and supplying & working of pumps bailing out of water and removal of all materials and obstacle from inside the well by divers etc. including precaution against shifting and lifting disposal of the soil with all leads and lift etc. complete as directed by the Engineer-in-charges. a) For 7.50m dia abutment & Pier wells | 15.65 | rm | 3,43,804.89 | ₹53,79,171.31 |
| 6 | 3) Hard Rock a) For 7.50m dia abutment & Pier wells | 3.6 | rm | 6,86,618.59 | ₹24,71,826.92 |
| 7 | Earth work excavation in foundation in Hard and compacted sheet rock within all leads and lifts including shoring, shuttering, propping bullahs, piling, dewatering from the foundation, supply & working of pumps stacking the excavated material away from the work in site. | 45.25 | cum | 1,734.95 | ₹78,497.81 |
| 8 | Providing PCC of grade M-15 with 10% extra cement for bottom plugging of abutment & pier wells as per approved drawing and technical specifications as per Section-900, 1000, 1200 & 1700 of MoRT&H specifications for Road & Bridge works (5th Revision)and as per direction of the Engineer-in-charge. | 458.78 | cum | 5,915.13 | ₹27,13,725.6 |
| 9 | Providing PCC of grade M-15 for top plugging of abutment and pier wells as per approved drawing and technical specifications as per section-900, 1000, 1200 & 1700 of MoRT&H Specifications for Road & Bridge works (5th Revision) and as per direction of the Engineer-in-charge. | 71.28 | cum | 5,544.55 | ₹3,95,237.7 |
| 10 | Providing PCC of grade M-20 concrete in well curb/Well steining as per approved drawing and technical specifications as per Section 900, 1000, 1200, 1500, 1700,2200 & 2700 of Ministry of Road Transport & Highways (5th Revision) & and as per direction of the Engineer-in-charge. Well steining | 717.79 | cum | 8,690.5 | ₹62,37,927.92 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 1.42 MB
Tendernotice_1.pdf
PDF • 1.35 MB
BOQ_604091.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].